AGAPITO G. AUSTRIA JR.
Zone ** Poblacion, Evangelista St., Tagoloan, Mis. Or. 9001 Philippines
+638*-***-**** / +639********* / +639*********
***.*******.***@*****.*** no.: P4731309A
POSITION: PIPING SUPERVISOR
PROFILE:
Over 17 years exceptional and long experience working in Piping, Welding & Mechanical works in oil and gas, power plant, Petrochemical industry and oil refinery onshore worldwide.
Read and interpreted P & ID’s hook up drawings and piping specification
Excellent skills in piping installation as per drawing.
Responsible for the HSES, and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule
WORK HISTORY:
Piping Supervisor January 13, 2020 – March 9, 2020
Cesco Offshore Construction Services, Inc.
Insular Oil Corporation - Petro De Oro Oil Depot Expansion Project
Brgy. Tablon, Cagayan de Oro City 9001
Supervision of fabrication and installation of piping items as per drawings and specifications
Daily reporting and monitoring at site progress in order to achieve planned schedule.
Play an active role in the development of the safety culture on the project, making safety a natural part of all work performed.
Site supervision pertaining to structural and piping erection as per design and specifications.
Piping Supervisor October 25, 2019 – November 23, 2019
Cesco Offshore Construction Services, Inc.
JG Summit Petrochemical Corporation Turn Around Shutdown
Barangay Simlong, Batangas City 4200, Philippines
Supervising scaffold erection to access tube bundle pulling work & blinding & de-blinding work, Remove pipe insulation for blinding work
Monitoring line to be isolated, drain and purge the system ready to blinding
To check blinding work before pipe spools are removed, Removal of channel head spools and shell side spools
Monitoring pull tube bundle and send it to cleaning yard at site and cleaning tube bundle by hydro jetting
Supervising shell side internal cleaning at site and shell side visual inspection
Supervising install back channel head, channel cover, backing device and perform tube side leak test
Ensure install floating head, shell cover, conduct shell side leak test
Supervising reinstate channel outlet pipe spool and bolt Torqueing on shell & tube side flanges
Monitoring De-blind as per blind list and sign off in flange check list
Piping Foreman August 7, 2019 – September 25, 2019
Atlantic Gulf & Pacific Co. (AG&P)
PASAR Turn Around and Acid Plant 1 Upgrade Project
LIDE Isabel, Leyte 6539, Philippines
Complies with the highest level of safety during all stages of project execution to avoid any type of incidents and or accidents.
Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.
Monitoring and reporting of all daily manpower and resource scheduling and deployment to Foreman or Pipefitter and coordinate in all aspects of site issues.
Complete the required monitoring of qualification updates and provide QC with client approved verifications.
Supervision of piping activities, pipe spool fabrication, pipe spool installation, pipe support fabrication pipe support installation, fittings identification prior to installation and etc.
Piping Supervisor September 24, 2014 – May 26, 2016
Hai leck Engineering Pte. Ltd.
Shell Bukom Refinery Project
40 Tuas West Road, Singapore
Supervising execution of preparation and removing, cleaning and covering flanges which including heat exchangers from shell and tube, double pipe exchangers, air cooler exchangers.
Supervising and monitoring final torqueing with exact proper tensioning and as per required as exact value in a different sort of flanges and bolt.
Ensure that contractors comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client requirements.
Ensure by leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions.
Forged crew member trust and built effective teams by clearly communicating expected results, interacting on personal levels, and promoting open dialogue with each craftsman.
Piping Foreman May 12, 2014 – September 16, 2014
Atlantic Gulf & Pacific Co. (AG&P)
Northern Import Mindanao Facility NIMF Project
Macabalan Shell, Cagayan De Oro City Philippines
Monitor job progress and ensure quality work at targeted schedule.
Assist in coordinating in the preparation and execution of project inspections for the proper handling over to clients.
Coordinate work teams directly in order to maintain high standards of performance, quality and safety
To read and interpret isometric and piping drawings
Assist in coordinating in the preparation and execution of project inspections for the proper handling over to clients.
To arrange a group of my people with coordination’s of a Pipe fitter and a welder.
Site supervision pertaining to structural and piping erection as per design and specifications.
Piping Foreman October 6, 2011 – June 15, 2013
Kharafi National Co. LLC
Gas Processing Plant Project
Habshan 5 Abu Dhabi, United Arab of Emirates (U.A.E.)
Monitor the quality and progress of the work scope and adherence to company and contractor procedures.
Monitoring and reporting of all daily manpower and resource scheduling and deployment to Pipe fitter and coordinate in all aspects of site issues.
Monitor job progress and ensure quality work at targeted schedule.
Ensuring that the piping fabrication and assembly activities are carried out to the schedule and highest HSE standards
To check and to supervise randomly my worker with their assigned job, to make sure that the task given to them follows the right procedure.
To evaluate my worker with their performance during work time.
Pipefitter / Welder Nov. 22, 2008 – June 27, 2009
Philippine Iron Construction & Marine Works Inc. (PICMW)
Gold Mining Tank & Piping Project
Hidden Valley, Morobe Province, Papua New Guinea
Lays out, assembles, installs, and maintains pipe systems, pipe supports, and related hydraulic and pneumatic equipment for steam, hot water, heating, cooling, lubricating, sprinkling, and industrial production and processing systems
Applying knowledge of system operation, and following blueprints: Selects type and size of pipe, and related materials and equipment, such as supports, hangers, and hydraulic cylinders, according to specifications.
To measure and mark pipes for cutting, threading and welding. They use specific tools such as power tools, cutting torches, pipe threaders, benders.
Read and understand P & ID, to better assist pipefitter of flanges, piping, and valves.
Piping Foreman July 8, 2008 – October 7, 2008
Engineering Equipment Inc., (EEI)
Wyeth Philippines Factory Expansion Project
Canlubang Industrial Estate, Cabuyao City, Laguna Philippines
Conducting visual inspections and dimensional measurements for marking, cutting, welding and positioning for all piping spools, according to the quality of materials before assembly and erection.
Checking the all prefabricated pipe spools, as dimension and quality so that they comply with isometric drawings as well as with the actual situation on site to meet the specific requirements of the project and beneficiary.
Take decision necessary to ensure quality of execution and record of documents.
Supervise for proper installation of piping, using the specified types of supports.
Monitor job progress and ensure quality work at targeted schedule.
Ensuring that the piping fabrication and assembly activities are carried out to the schedule and highest HSE standards
Pipe Fabricator April 18, 2007 – May 8, 2008
Consolidated Contractors Company (CCC)
Rasgas Expansion Project
Ras Laffan, State of Qatar
To read and interpret isometric and piping drawings, plots plans and P& ID’s
Fabricates spool or isometric drawings pipe spool pieces and associated supports and fitments to meet pre and final assembly, in a variety of materials.
To prepare pipe lengths and fittings for fit-up and sets up all types of weld joints prior to completion by welder.
Lay-out field run location on pipe racks and slippers way.
Pipefitter August 18, 2004 – August 18, 2006
Bum Dong Ind. Ltd.
Coal-fired Power Plant Project
Dangjin Chungchongnam-do, South Korea
Assign on fabrication and erection of pipes per teams and choosing the optimal location per specified coordinates.
Able to use hand tools, oxy-acetylene outfit and fabrication of pipe spools per ISO’s supervision.
Create in depth sketch of pipe and equipment fabrication and installation if needed.
Cut pipes using power tools or machines.
Pipefitter February 5, 2002 – December 2, 2002
Al Rushaid Construction Co. Ltd. / Engineering Equipment Inc. (EEI) – Joint Venture
Berri Gas Plant Project
Al Jubail, Kingdom of Saudi Arabia (K.S.A.)
Receives instruction, blueprints, and work orders for the job. Develops working procedure for the job, material requirements and other equipment required. Calculates dimension and bends required for piping.
Inspect piping systems to insure safety and effectiveness of installations, especially those which convey high pressure and dangerous elements; check gauges and metering devices for measurement accuracy of pressure and flowage.
To measure and mark pipes for cutting, threading and welding. Use specific tools such as power tools, cutting torches, pipe threaders, benders.
Plans pipe system layout, installation, or repair according to specifications.
Pipefitter January 16, 2001- July 13, 2001
Jurong Engineering Ind. Co., Ltd.
Pilipinas Kao Inc. Expansion Project
Luz Banzon, Jasaan Misamis Oriental Philippines
Lays out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
Plans pipe system layout, installation, or repair according to specifications.
To measure and mark pipes for cutting, threading and welding. They use specific tools such as power tools, cutting torches, pipe threaders, benders.
Attaches pipes to walls, structures and fixtures, such as radiators or tanks, using brackets, clamps, tools or welding equipment.
To prepare pipe lengths and fittings for fit-up and sets up all types of weld joints prior to completion by welder.
Pipefitter June 18, 1999 - September 29, 2000
Daelim Ind. Co., Ltd.
Formosa Refinery Project
Mailiao Yunlin City, Taiwan R.O.C.
Install steamfitters and sprinkler system.
To prepare pipe lengths and fittings for fit-up and sets up all types of weld joints prior to completion by welder.
Lays out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
Read and understand P & ID, to better assist pipefitter of flanges, piping, and valves.
EDUCATIONAL ATTAINMENT:
Electronics Engineering Technology 1993 - 1996
Mindanao Polytechnic State College (MPSC)
CM Recto, Lapasan, Cagayan de Oro City Philippines
Transcript of Record (T.O.R)
St. Mary’s High School 1989 – 1993
Tagoloan, Misamis Oriental
Vicente N. Chavez Memorial Central School 1983 - 1989
Villanueva, Misamis Oriental
TRAINING & SEMINARS ATTENDED:
National Certificate II in Pipefitting
Cert. No. 191*********** Expiry Date March 8, 2024
Technical Education Skills and Development Authority (TESDA)
Regional Training Center (RTC) Tagoloan, Misamis Oriental 9001
National Certificate III in Driving Passenger Bus/Straight Truck
Cert. No. 191*********** Expiry Date May 10, 2024
Technical Education Skills and Development Authority (TESDA)
Regional Training Center (RTC) TESDA Building, National Highway, Iligan City, 9200 Lanao del Norte
National Certificate II in Shielded Metal Arc Welding (SMAW)
Cert. No. 191*********** Expiry Date July 12, 2024
Cagayan de Oro (Bugo) School of Arts & Trades (COBSAT)
Reyes Village Subdivision, Bugo-Reyes Main Rd, Cagayan de Oro, 9000 Misamis Oriental
Confined Space Awareness Training 7 September, 2015
Hai Leck Engineering Pte Ltd.
Pulau Bukom, Singapore
Apply Workplace Safety and Health in Process Plant 16 October, 2014
Greensafe Training Center
Little India, Singapore
Integrated Safety Induction Course 21 October, 2014
Hai Leck Engineering Pte Ltd
Seraya Shell, Jurong Island Singapore
Permit To Work (PTW) Seminar November 3, 2011
Kharafi National Co. LLC
IGD Project Habshan 5
Kharafi National Site Safety Office, Habshan 5 Abu Dhabi
Working at Heights Seminar April 7, 2009
Philippine Iron Construction & Marine Works Inc. (PICMW)
Mother Tank & Open Tank (For Gold Mining)
Hidden Valley, Morobe Province, Papua New Guinea
Conducted by: Frank Bisunia
Safety Orientation May 22, 2008
STEAG State Power Inc. (SPI)
Shutdown Operation
Balacanas, Villanueva Misamis Oriental
Conducted by: Mr. Francisco Libao
B-Safe Training Seminar March 26, 2008
Consolidated Contractors Company (CCC)
Ras Gas Refinery Plant, Ras Laffan, State of Qatar
Conducted by: Mr. Bader Jarrar
Computer Operations Training December 18-22, 2006 for a period of 40 hours
Technical Education Skills and Development Authority (TESDA)
Regional Training Center (RTC) Tagoloan, Misamis Oriental
Computer Aided Drafting and Design January 15-19, 2007 for a period of 40 hours
Technical Education Skills and Development Authority (TESDA)
Regional Training Center (RTC) Tagoloan, Misamis Oriental
Safety Training Seminar August 20, 2004
East West Power Plant
Bum Dong Ind. Co., Ltd.
Dang Jin, South Korea
Korean Language Training June 28- July 2, 2004
Philippine Academy for Career and Technology Inc.
Paco, Manila Philippines
Pre-Commissioning Seminar May 24, 2002
Jubail, Berri Gas Plant
Al-Rushaid Company & Engineering Equipment Inc. (EEI Joint Venture)
Kingdom of Saudi Arabia (K.S.A)
Confine Space Seminar August 03, 2002
EEI Safety Department
Jubail, Berri Gas Plant
Kingdom of Saudi Arabia (K.S.A)
Piping Training Seminar December 13, 2001 – December 20, 2001
Gulf Asia International Inc. (GAIC)
Conducted By: Mr. Martinez
Safety Training Seminar June 20, 1999
Formosa Refinery Plant
Daelim Ind. Co., Ltd.
Taiwan, Republic of China (R.O.C)
Safety Orientation Seminar November 9, 1995
National Power Corporation (NAPOCOR)
Aplaya, Jasaan, Misamis Oriental
On The Job Training November 9, 1995- March 15, 1996
National Power Corporation (NAPOCOR)
Aplaya, Jasaan, Misamis Oriental
REFERENCE:
Mr. Choo Yoon Kow
Group General Manager
Hai Leck Engineering Pte. Ltd.
40 Tuas West Road, Singapore
Mr. Mario Maulion
Project Manager
Atlantic Gulf & Pacific
San Roque, Bauan, Batangas 4201
Mr. Park, Yong Jin
President
Bum Dong Construction Company Ltd.
Dang Jin, South Korea
Engr. Aladin Bautista
Project Manager
Engineering Equipment Inc. (EEI)
Jubail, Kingdom of Saudi Arabia (K.S.A.)
I hereby certify that the above information are true and correct to the best of my knowledge and belief.
AGAPITO G. AUSTRIA JR.
Applicant