Dante Prudente Along
H ome Address: S a n J u a n B i n a n g o n a n R i z a l P h i l i p p i n e s P a s s p o r t No. : P 5 1 6 8 7 9 1B
Contact No. : + 6 3 9 4 8 0 4 8 9 3 3 9 / + 9 7 4 5 0 4 0 0 9 8 3 Email Add. : d a n t e a l o n g 6 3 7@y a h o o . c om JOB OBJECTIVE
To be part of your company, to broaden my knowledge, and to use my skills as the best as I can.
Key Technical Skills
more than 16 years’ experience in construction supervision and managing survey works on construction projects and worked in gulf region for 9 years with reputed Construction Company in Qatar, UAE, PHILIPPINES, Land Surveyor having exposure to construction supervision including awareness of Quality Control for the construction of roads/bridges, sewerage/drainage, and infra-structure, high rise building, oil & gas refinery and Nuclear power plant. With construction standards followed in Qatar QCS 2014 and Qatar Survey Manual. Working with survey equipment from (GPS & TOTAL STATION) LEICA, Sokkia, Topcon and Nikon; and knowledge of software including AutoCAD 2D, CIVIL 3D, HP 480 Survey Software and MS Office.
Can operate LATEST DIGITAL INSTRUMENT EXPERIENCE USED
Can operate Surveying Equipment such as South Total Station, TOPCON,
(SOKKIA CX 102 & FX-102) and ( NIKON 522& 532)
Can operate RTK, GPS TRIMBLE, Sokkia Archer2,(Leica Gs14 and set up base Control
Knowledgeable
Computer Literate (MS Office, MS Word, MS Excel, Internet Explorer, etc.)
Can read & understand Architectural, Structural Plans, MEPFS, etc. Career Summary:
With the degree earn in Geodetic Engineering within 10 years of extensive experience in basic engineering gained from multidiscipline Engineering, and Construction Company. Hard working and ambitious, and able to work well both independently and as part of the team. WORK EXPERIENCES:
LEIGHTON CONTRACTING QATAR Surveyor
NEW ORBITAL HIGHWAY 3 PROJECT Feb. 03, 2017 to Dec. 31, 2019 ECONOMIC ZONE MANATEQ 3 PROJECT
DOHA QATAR
SAMJIN INDUSTRIAL CO. LTD. Surveyor
Baraka Nuclear Power Plant Dec. 9, 2014 – Dec. 10, 2015 Ruwais, Abu Dhabi U.A.E.
JJ HUBAC SURVEYING SERVICES Chief Surveyor
LEIGHTON PHILIPPINES CONTRACTORS April 22, 2012
PROJECT CITY OF DREAMS MANILA
Sept. 10, 2014
SOJV (Main Sky Oryx Joint Venture) Surveyor
PROJECT (NDIA) Hamad International Airport Dec 18, 2017 to Dec. 23, 2012 Doha, Qatar
SAGAY ENGINEERING OFFICE
April 5, 2002 – Dec 18, 2004
(GPI) GLOBAL PROJECT INCORPORATED Surveyor
PROJECT SPACE ROMUALDEZ BUILDING Manila
March 13, 2016 –July 10,2016
(QMCG) QINGDAO MUNICIPAL CONSTRUCTION GROUP. LTD Surveyor PROJECT MAYNILAD AND MANILA WATER (SEWER TREATMENT PLANT) July 11, 2016-Dec 22, 2016
LEIGHTON CONTRACTING QATAR
Job Description
(Review the Drawing AFC. Approved For Construction before implement on Site Check the key plan and section details) / Prepared Survey Report for inspection to Consultant Working of the office making survey RFIT.
Supervise all Survey works for construction activities including earthworks excavation filling, Pipe Alignment and pipe levelling with slope, utility networks including Water works, and future services ducts as per approved drawings. Supervise the setting out and establishment of control points at site, marking of ground level with Sub-contractor before starting the execution. Conduct inspection of survey works for concrete blinding/chattering, shaft excavations bed levels, manhole coordinates and levels, backfilling, base and sub-base filling layers and pavement levels. Receive/action Request for Information (RFI) that apply to survey work.
Preparing and monitoring the Civil and utility work daily reports and Progress Reports, Perform all other duties that as delegated by the Survey manager.
SAMJIN INDUSTRIAL CO. LTD. Surveyor
Baraka Nuclear Power Plant Dec. 9, 2014 – Dec. 10, 2015 Ruwais, Abu Dhabi U.A.E.
Job Description
(Review the Drawing AFC. Approved For Construction before implement on Site Check the key plan and section details) / Prepared Survey Report for inspection to Consultant
Responsible in preparing survey report sheet. Making RIW. / RFIT. With attachment drawing for
Submitted to main contractor. survey checking and as-built survey,
Provide reference gridlines and elevations for millwright installation of machine
Established control points horizontal (northing,easting) and vertical 1 meter offset to
Finish floor level. Checking of alignment and elevation of machine and monorail. overhead
Crane. Polar crane. lay out location of RCB Reactor Building Concrete, established roundness,
using azimuth and radius, and lay out location of embedded plate pipe alignment
levelling of padding fixed and sliding
JJ HUBAC SURVEYING SERVICES / PROJECT LEIGHTON PHILIPPINES CONTRACTORS PROJECT: CITY OF DREAMS MANILA
Job Description:
(Review the Drawing AFC. Approved For Construction before implement on Site Check the key plan and section details) / Prepared Survey Report for inspection to Consultant
Manage all the group of Surveyors / Assist. Surveyor / Survey aide, with their daily assignments
Implementation of rules & regulations not only about survey works but also with their manners while inside the site such as good attitude, being punctual, quality works and teach them to obey the regulations/rules of chief surveyor.
Monitor and provide drawing of all survey works to the sub-contractor to ensure execution of the works as per design and specifications. Checking the horizontal and vertical alignment of centre line of road and structure. Jointly take the Ground Level with contractor before starting the execution. Monitor the construction activities including earthworks filling base & Sub-grade. Receive Request for Information (RFI) and perform inspections apply to survey report. As per request site for concrete pouring. Supervise survey works for structures including concrete channel, manholes, chambers etc.
Checking of control points, every month in the site.
Established all gridlines at construction site as per site engineer’s request.
Engaged every survey team to check their respective tools/equipment such as peg test auto level and total station every week to make sure that every tools/equipment being used are working properly.
Having joint survey with other Contractors as per request. RIW. site Activities,
Attend general meeting with all Project-in-charge and Site Engineers.
Implementation of safety rules and regulations. Conducting toolbox meeting every day
Prepared the data for all surveyor by (CSV FILE TEXT FILE FOR GPS machine)
Receive the request for all engineers and given to surveyor as per by area and location
(SOJV) MAIN SKY ORYX JOINT VENTURE
Job Description:
(Review the Drawing AFC. Approved For Construction before implement on Site Check the keyplan and section details) / Prepared Survey Report for inspection to Consultant Setting out location and elevation of Pile Foundation and Pile Cap, Blinding and Screed level and Slab
(SSL, FFL
Responsible for establishing the control points and bench marks; setting out all types of horizontal and vertical alignment; setting out for Centre Line, Foundation, Columns, Beams, verify survey data setting out and Level of building. Coordinate & Verification of As Built Drawings design. Drafting, Checking and Evaluate the survey report for final submission, Identified, designed, implemented, and collect land information for construction. Worked and performed accurate measurement of land, making inspection visits to the site to collect information
As-built of Interior Fit-out and Base-build such as MEPF, location/ elevation, & dry wall system, steel staircase and Column Details.
Checking elevations for Soil excavation, pipeline and duct bank, Blinding Level Setting out location and elevation of electrical manhole, and mechanical manhole and lay out of duct bank Setting out location and elevation of pedestal Anchor bolt preparation installation of JET BRIDES Setting out location and elevation of COLUMN and monitor of excavation level Setting out location and elevation of TRENCH for Electrical and Mechanical, FOUL SEWER MANHOLE, TSE. Line
SAGAY CITY ENGINEERING OFFICE
Job Description:
(Review the Drawing AFC. Approved For Construction before implement on Site Check the key plan and section details) / Prepared Survey Report
Established the Boundary Monument, control points, benchmarks, setting out for Center Line for road alignment. Jointly take level Ground Level with Consultant. Conduct daily survey works required at site to facilitate construction team, mark correct coordinates and levels for utilities, and earthwork for road. Prepare survey data and reports.
Detailed survey of additional contract works including profile and cross-section of roads to determine the cut and Fill section and limits as reference for construction of riprap as slop protection, drainage, and line ditches, using Total Station.
Survey lay-out centreline of road location using total station as reference in clearing and grabbing and location Drainage, culverts (inlet and outlet) Curve Stone masonry and established elevation, using automatic level instrument.
For correction of Subgrade sub-base to base course preparation. Lay out and levelling of string lines to serve as guide of
Sensor of paving machines for concreting works. Re-design of horizontal and vertical curves for re –aligned Curves of proposed road including determination of widening and super elevation
(GPI) GLOBAL PROJECT INCORPORATED
Job Description:
High Rise Building 30th Floor/ Project Romualdez Space Hotel
(Review the Drawing AFC. Approved For Construction before implement on Site) Check the key plan and section details / Prepared Survey Report for inspection to Consultant Setting out location and elevation of Pile Foundation and Pile Cap, Blinding and Screed level and Slab
(SS, FFL
Checking plumpness and alignment of Column before and after casting /as built all activities Setting out location and elevation of Pile foundation of Column Pile Cap Monitoring elevation and location of Excavation
Setting out location and elevation vertical and alignment of elevator PIT and Retaining Wall Provide marking reference grid lines, reference elevation & setting-out location of column and RAMP
Provide marking points, off-setting 1-meter from the gridlines. and elevation for reference for carpenter
,electrical, mechanical, Steel man and mason
As-built of Interior Fit-out and Base-build such as MEPF, location/ elevation, & dry wall system, steel staircase and Column Details.
Checking elevations for Soil excavation, pipeline and duct bank, Blinding Level
Setting out location and elevation of electrical manhole, and mechanical manhole and lay out of duct bank
Setting out location of TIEBEAM
(QMCG) QINGDAO MUNICIPAL CONSTRUCTION GROUP, LTD
Job Description:
(Review the Drawing AFC. Approved For Construction before implement on Site) Check the keyplan and section details / Prepared Survey Report for inspection to Consultant Established the Boundary Monument, control points, benchmarks, setting out for Center Line for road alignment. Jointly take level Ground Level with Consultant. Conduct daily survey works required at site to facilitate construction team, mark correct coordinates and levels for utilities, and earthwork for road. Prepare survey data and reports.
Checking plumpness and alignment of Column before and after casting
Setting out location and elevation of Pumping Station
Setting out location elevation of INTERCEPTOR BOX MANHOLE
Pipe Levelling with slope and INTERPOLATION
TOPO of Existing Roads reference for lay out of manhole and trench location
Setting out Location of Pumping Station
SEMINAR ATTENDED/TRAININGS
SAFETY OFFICER (COSH) Conducted By: MSPC. Most Safety first And Prevention Corporation (DOLE) Accreditation. No. 103***********
Date: Jan.18-19 to Feb.01-02, 2014 at the LEIGHTON CONTRACTORS PHILIPPINES. Training Room, CITY OF DREAMS MANILA PROJECT
Aseana Boulevard cor. Roxas Boulevard, Tambo, Paranaque City Manila Philippines AUTO CAD CIVIL 3D ESSENTIAL 2017 (KEA Surveying Technology Services) DOHA QATAR, MAY 12, 2017 (16 HOURS)
Educational Background
Bachelor of Science in Geodetic Engineering
S.Y. 1991 - 1996
Negros Oriental State University - Dumaguete City, Philippines Secondary Education
S.Y. 1987 - 1991
Brgy. Tiglawigan National High School - Cadiz City, Neg. Occ. Philippines Elementary Education
S.Y. 1981 - 1987
Brgy. Himoga-an Elementary School – Sagay City, Negros Occ. Philippines Personal Details
Position Desired : Surveyor
Date of Birth : May 5, 1975
Age : 45 years old
Civil Status : Married
Height : 5’6 feet in.
Weight : 70kg
Religion : Catholic