Post Job Free

Resume

Sign in

Power Plant Manager

Location:
Bhubaneswar, Odisha, India
Posted:
June 21, 2020

Contact this candidate

Resume:

Core Competencies

Operations & Maintenance

Erection/Commissioning

Project Management

Contract Management

Cross-functional Coordination

Preventive & Breakdown

Maintenance

Reporting & Documentation

Inventory Management

Team Building & Leadership

Certified Energy Manager BOE Certified

Industry Preference: Power Plant

Location Preference: In & around Orissa

Profile Summary

PGDC experience (Thermal in Energy Power Sector Engineering) (Power Plant) professional in Operation, with nearly Maintenance 14 years of and rich Commissioning domain

Chaired Proficiency as Project as Maintenance Mechanical In-in charge charge for for Boiler, new Ash ESP, Pond AHP construction (including Ash

Dyke 3x287 a Hands-Green & on TPH Field Ash experience & utilization) Project 3x30 MW at in Sesa energy Generators & CHP Sterlite of sector, 4X600MW Ltd. with in initiating 220 Lanjigarh, T/TPP H from Co in Odisha Gen Jharsuguda, the Turbines, start of Operation completing the Green of Field project to completion; worked as Shift In-Charge for Captive Power Plant

Recognized for contributing for technical clearances for Boiler Approval from Statutory Body and Contract Management

Skilled in Boiler Pressure & Non-pressure Parts, Pulverizes, Cooling Tower Maintenance, SAP Environment, Asset Optimization Module, Business

Excellence Successfully and managed RCA all the activities dealt with shift of a 3*30 MW co-gen power plant with boiler capacity 3*287 t/hour

Bagged Excelled various in consumption appreciation based for contributing spare planning, in the inventory growth of organization control, AOH planning & execution and modification for smooth operation & quality

maintenance Effective presentation communicator & interpersonal with skills; strong excellent analytical, relationship team leadership, building, problem- writing, solving & organizational capabilities

Timeline

DURGA PRASAD PADHY

Operations & Maintenance

addy8d@r.postjobfree.com +91-993*******

Diploma in ME

from UCPES,

Berhampur

BE (ME) from

SMIT, under Biju

Patnaik Technical

University, Orissa

PGDC in Thermal

Power

Engineering from

NPTI, Badarpur

199*-****-**** Since 2005

Vedanta Limited

Jharsuguda,

Odisha as

Manager

Photo

Certifications

BOE Certified Certified as Energy Manager

Academic Details

PGDC in Thermal Power

Engineering Badarpur, New Delhi from in NPTI, 2005

with BE from Biju in Patnaik 76.SMIT, Mechanical 6% score Technical Berhampur Engineering University, under

Orissa Diploma in 2003 in with 84% Mechanical

Engineering Berhampur in 1998 from with 76.UCPES, 5% IT Skills

SAP PM, MS Power E2E Master Material Office QM Implementation ECC User BOM, package 5.Data for 0/Spare 6.PP, 0, PM, Modules: (List) Equipment, QM PP, Trainings Attended

Training Simulator at at 210 NPTI MW (Coal Badarpur) based

which NTPC Vedanta Jharsuguda, Balco MW, Balco MW, Huangzhuo Huangzhuo, ((67.135x4) Badarpur CPP CPP is 5x4) a 1, Aluminium 2, 1215 replica Balco, Turbine Balco, China (New MW, Korba. 210 Korba: Delhi) (Company, 135x9)(CPP Turbine MW :- 540 270 . at 1,

Manufacturing Sinopec-China Honeywell, Company) (Tian GUS/HPM Jin,

Implementation) In-PM house Module Training for SAP PP & Personal Details

Date Languages and Address: Road, Oriya of Lanjipalli, Birth: S/o Known: Bidya 5th Po:July -Binod Berhampur, 1980 English, Padhy.Hindi Dist:Main - Ganjam. St:-Odisha, Pin:-760008

Notable Accomplishments Across the Career

Attained improved Acted Reduction Successfully actively Managed to Spearheaded continuous Achieved Minimized 87)Led a Worked commencing Successfully registration record 2% %the ; as supervised implementation participated as time a activities reduction the the Team an downtime of line from maintained administered with boiler In-the Specific minimization improvement charge Leader the the predictive raw of in efficiency in IBR business resources outage & Coal material techno-of and for failure and authorities SAP the Consumption managing procured in & by of led commercial plan PM by technical Boiler preventative & rates coal taking inventory the labour, 0.& of 5% mill PP (completion controls power minimum Director, and Tube steps in & repair to from discussion maximized Power statutory a plant Leakage maintenance larger of Assistant 825gm/and spares 440 of Plant an reducemaintenance T/extent with clearances through improvement productivity from Hr. MW single-& suppliers of program Deputy approved to process handedly 800gm/measures for Directors from project and steam the vendors; MW budget within (drove boiler 54to and and for of

Factories Steered attained Engaged the indinization in and ingredient completion Boilers) of of of Chinese the ESP commissioning modification Spares for BTG team job for of 3x30 reduction MW co-of generation emission; power plant

Managed Engineer and Power as a Plant Desk with Engineer no tripping due to operation fault as Shift Charge Work Experience

Since Jun’05 with Vedanta Limited, Jharsuguda, Odisha as Manager Key Result Areas:

Steering o o Planning overall Managing their Supervising of Coordinating operational; production Boilers Acid Steam System sub-operations the Cleaning contractors activities contractors turbines and (overall erection reviewing 3x287 with targets Extractions and for maintenance involving operations T/with & within like ensuring Steam Hr.commissioning each ) auxiliaries: CMEC, (System, Drum the machine Blowing) working with timely time & Spic repair Lifting, Oil a and Jel, after view Rolling completion of: out Circuit, Simplex, service cost Hydro to a various specific ensure parameters and CW department Test, BSBK-of Synchronization, system requirements project period the Light MBPL, timely work of up, to Ion time accomplishment keep Alkali & Exchange to Condensate monitoring equipment find Boil fault Out, and

and Actively approvals rectifying participating during the same erection, in to avoid discussions commissioning any major with problems and boiler registration inspectors in the future of boilers for all from the IBR the

Office Liaising & Dealing of Spearheading central 350 of Crores with with Director government the the and the suppliers, billing of development E Factories & C agencies breakups of 100 research & Crores of Boilers and GET’s organizations, payment for for EPC desk Contractor clearances & contractors, field operations which vendors includes and supply state



Contact this candidate