Vasagam L

Senior Engineer Electrical

PERSONAL DETAILS

Nationality: Indian

Driving License: UAE

Other certificates EQUIVALENCE CERTIFICATES

MINISTRY OF HIGHER EDUCATION UAE

Contact Mobile Number: +971*********, 065428546

Email : adduui@r.postjobfree.com

SUMMARY

More than 18 years of Experience in Construction & Maintenance, All Inspection Under ADDC, DEWA Regulation & BS standards, Electrical Engineering and Installation of MEP Works, Maintenance, WTG,s,Manufacturing Motor & Pump set Planning, Project Management, Procurement, Installation, Testing and Commissioning, Technical and Commercial Review, Material order and Coordination, for the complete project cycle on a turnkey Basis in India and Middle East High rise Residential Building, Commercial Building, Five star Hotels, and Retail Malls Projects.

EDUCATION

BE (Electrical & Electronics Engineering)

Coimbatore Institute of Technology

Bharathiyar University, Coimbatore, India

WORK EXPERIENCE

Al Futtaim Engineering LLC (MEP Division)

Senior Engineer –Electrical

Project Handled : KSA Pavilion EXPO – 2020

Period : SEP 2019 to still date

Sobha Electromechanical Works LLC Jan 2017 – Aug 2019

Senior Project Engineer (Electrical)

Project Handled: EMAAR - Acacia -01 (B+G+10+RF Tower A, B & C)

537Nos Residential Building+13Nos Retails

Voltas Ltd, IOBG – Abu Dhabi, UAE Nov 2008 – Dec 2016

Senior Project Engineer Electrical

Project: Formula -1, YAS Marina Circuit Yas Island, Abu Dhabi

Period: Nov 2008 – Dec 2010

Project: Etihad Towers Project -- Abu Dhabi (4B+5P+ 3Nos high rise Towers)

Period: May 2010 – Apr 2013

Project: Regent Emirates Pearl Hotel – Abu Dhabi (48-Storey Hotel Tower, Podium & Basement)

Period: Apr 2013 – Dec2015

Duties & Responsibilities:

Construction & Installation of Inspection Tower project all the Electrical, ELV System, Car Parking System preparation of shop drawing, Taken quantity, Order the Materials, budget Allocation of the project, All the containment work like Cable tray, Trunking, G.I conduit, PVC Conduit, Cable ladder Installation and coordination with other MEP services, Installation of MBD, SMDB, FDB, MCC Panels, AHU Control panels, All the Kitchen Equipment power outlet Installation, Lighting control system, Lightning Protection, Earthing system.

Testing and Commissioning of Electrical and ELV System, Inspection Quality Control and Quality Assurance. MEP Coordination, Preparation Commercial Reports, Field Change Request (FCR), Request for information (RFI) Weekly, Monthly Progress Reports, Subcontractor Handling, Preparation work program, Quantity Take offs and ordering of material. Final Handing over Document Closing like a As built Drawing preparation, Final Snagging comments, WIR, NCR, Site Memo, Approval “A” Status

United Gulf Construction Company – Kuwait Dec 2006 – Sep 2008

Electrical – Senior Site Construction Engineer

Project Handled: SE97 – Sewage Pumping Station

Duties & Responsibilities:

Construction of Pumping Station Installation and commissioning Electrical Equipment like a FD, Transformer, MCC panel, Generator, LV Panels, SMDB, FDB, Actuator control system, Street Lighting, security System Telephone system, fire alarm system, Grounding system, Power and Lighting, As built Drawing preparation Coordination with consultants Rise the WIR Approval all Electrical services

Project Handled: Construction Emergency Shelter Class- IV – Kuwait

Duties & Responsibilities:

Construction of oil and gas Emergency Shelter Electrical work Installation & commissioning Electrical Equipment, SMDB, FDB,DG System, HVAC system, AHU, FCU Fire alarm system, Cable tray,Lighting &power Wiring of MICC Cable, Excavation inside and outside G.C, Power cable, Fire alarm system cable Termination of Substation Following all work KOC Safety and Regulation Rules.

Project Handled: SE19, New Mishrif Sewage Pumping Station Kuwait

Duties & Responsibilities:

Maintenance of pumping station for MCC, LV Panels, Instrumentation of I&C system, handling Screening, conveyer, Grit removal, Odor control system in DCS operation. Preventive & Break down maintenance of 750 kw/ 3.3 KV motor pump sets and 560 kw/3.3 KV submersible pumps, 11KV / 3.3 KV VFD, 11 KV/3.3 KV step down Transformer. Gates & Actuator valves are controlled by via 2 wire PROFIBUS – DP.

Suzlon Infrastructure Service Ltd – India Oct 2004 – Nov 2006

Electrical Engineer

Project Handled: Erection, commissioning, Operation and maintenance of Wind Turbine Generator (WTG’s)

Duties & Responsibilities:

Installation, Testing and commissioning of electrical equipment like outdoor substation, Transformer, HV, LV switchgear, UPS & 350 KW WTG, 1.25 MW WTG control system, lightning protecting earthing system and Troubleshooting of Electrical equipment in operation.

CAG Pride Hotel (3 Star Deluxe Hotel) – India Oct 2002 – Sep 2004

Electrical Engineer (HOD)

Project Handled: Operation and maintenance of electrical equipment

Duties & Responsibilities:

Operation and Maintenance of electrical equipments like indoor substation, Transformer, HV, LV switchgear, UPS control system, MCC panels, DG set, Grounding system, and Lightning protecting earthing system, fire alarm, Tele communication system and Trouble shooting.

The Residency Hotel (Three stars Deluxe Hotel) – India Feb 1999 – Sep 2002

Electrical Supervisor

Project Description: Construction & Operation and maintenance of electrical equipment

Duties & Responsibilities:

Installation, Testing and commissioning of electrical equipment like indoor substation, Transformer, HV, LV switchgear, UPS control system, MCC panels, DG set, cable tray, Grounding system, lightning protecting earthing system, fire alarm, Tele communication system and Trouble shooting of Electrical and mechanical equipment in operation and maintenance.

Tamil Nadu Electricity Board – India Oct 1997 – Oct 1998

Technical Assistant

Project Description: Operation and maintenance of Substation.

Duties & Responsibilities:

Operation and maintenance for 66 KV/11 KV substation like power transformer circuit breaker, distribution transformer. Testing and repair of single and three phase Energy meters.

Bhrarath Equipment’s – India Aug 1995 – Jul 1997

Production Supervisor

Project Description: Manufacturing of single and three phase motor and pump sets.

Duties & Responsibilities:

Single and three phase motor and pump sets testing and quality controls and production of valves.

AREAS OF EXPERTISE

Substations– HV Switchgears, Transformers, Breakers, DC battery system

LV Panels– Main Distribution Boards, Capacitor Banks, Motor Control

Panels, Sub main Distribution Boards, Distribution Boards.

Cabling and Wiring– HV and LV Cabling, Control Cabling

Containment System– Cable Trays, Cable Ladders, Floor Boxes, Trunking

Lighting control Systems – Internal and External Lighting

Lightning Protection and Earthing Systems

Bus Ducts, Bus Risers and Bus Bars, Generator including Synchronization, Exhaust System,

UPS – Inverters, Central Battery System – Control Panels, Emergency and Exit Lights

ELV System – Voice and Data, CCTV, Access Control, BMS System,

Room Automation and Guest Room Management System, CO Monitoring System, Handicapped System, SMATV, Audio Intercom System, Public Address System

Fire Alarm and Emergency Voice Evacuation System