PROPOSED POSITION : Quantity Surveyor
NAME OF FIRM : EgisIndia Consulting Engineers Pvt. Ltd.
NAME OF STAFF : Papan Bhattacharya
PROFESSION : Civil Engineering
DATE OF BIRTH : 9th May, 1988
NATIONALITY : Indian
MOBILE NO : 963-***-**** / 700*******
PASSPORT NO : M2030513
EMAIL ID : addsru@r.postjobfree.com
MEMBERSHIP OF PROFESSIONALS SOCIETIES:
Nil
OTHER TRAINING
Nil
DETAILED TASKS ASSIGNED:
I will be reporting to the Team Leader and give input as and when required during the work. He will provide necessary guidance to the Quantity Surveyor, and shall issue directions/procedures/formats of reporting to the Quantity Surveyor. He will act as a contract specialist also for the construction package, even though the thrust of his responsibilities will be in the areas of quantity surveying/processing of the invoices etc. He will be responsible for taking all measures required to control the project cost and time over-runs. He will examine the claims of the contractor, variation orders, if any, and will approved the progress reports as per the project requirements. He will approve the measurement of all items of works executed in different stages for payment purpose prepared by Quantity Surveyor. Assist the Resident Engineer in checking the layout of road geometrics, layout of curves, preparation of L-sections and X-sections etc. Modify the survey data during the change in design. Assist the Highway-cum-CADD Expert in preparation of revised alignments, profiles and drawings by providing appropriate inputs. Carry out topographic surveys using modern survey equipments like auto levels / total stations. Modifying the survey data as per revised / modified drawings.
S. No.
Name of Employer
Post Held
Project Name
Period
Assignment in the Project
Client of the Project
Remark
From
To
1
Please refer employment record
Education:
BACHELOR OF TECHNOLOGY (CIVIL),from DR. A.P.J. ABDUL KALAM TECHNICAL UNIVERSITY in 2015
Key Qualifications:
I am a Graduate in Civil Engineering having 5 years of extensive experience in the area of construction supervision, quality control of materials and execution of highway works.
I have been involved in monitoring day to day progress of work, participation of executed works and maintaining records therefore, quality control checks at site and progress monitoring of all field activities, maintaining quality assurance processor, preparation of bill, selection of sub contractor and maintaining deployment of man power and construction machinery,-claims processing. Also conversant with IS Codes, IRC Standard, MORT&H Specification for quality control of road projects.
Employment Record:
S.No.
Name of Employer
Post Held
Project Name
Period
Assignment in the Project
Client of the Project
Remarks
From
To
1.
Egis India Consulting Engineers Pvt. Ltd.
Quantity Surveyor
Consultancy Services for Authority’s Engineer for Supervision of “6 Laning of LUCKNOW- SULTANPUR Road from (i) Design Km 00+000 To Km 40+000 in state of UP under SARDPNE on EPC basis, Project Length :40.00 km,6/lane;Funded By : UPRIDA; Project Cost : Rs. 12000 Crore.
.
7th Mar 2019
Till Date
As Quantity Surveyor, responsible for preparation of Interim Payment Certificates (IPC), Make Area & Volume Sheet of Granular Sub Base, Water Bond Macadam, Bituminous Macadam, Dense Bituminous Macadam, Bituminous Concrete, Paved Shoulder & Earthen Shoulder etc., Make Grade Sheet, Layer Chart & Strip Chart, Prepare Daily Progress Report, Weekly Progress Report, Monthly Progress Report, Daily Stock Report Etc., Responsible for Letter dispatching and maintenance in files & System, Weekly Bill Prepared For Labour Contractor, Make RFI and Measurement Sheet, Entry All Type Data in Computer.
India
UPRIDA
UP
2.
M/s LN Malviya Infra Projects Pvt. Ltd. (In Assn. with) Agnitio Infrastructure Projects Pvt. Ltd.
Quantity Surveyor
Consultancy Services for Authority’s Engineer for Supervision of “4 Laning of Dimapur- Kohima Road from (i) Design Km 123.840 To Km 138.775 (Existing Km 124.100 to Km 140.000) (ii) Design Km 138.775 to Km 152.490 (Existing Km 140.000 to Km 156.000) (iii) Design Km 152.490 to Km 166.700 (Existing Km 156.00 to Km 172.900) in state of Nagaland under SARDPNE on EPC basis, Project Length :42.86 km,4/lane;Funded By : NHIDCL; Project Cost : Rs. 975 Crore.
1st Mar 2017
3rd May 2019
As Quantity Surveyor, responsible for preparation of Interim Payment Certificates (IPC), Make Area & Volume Sheet of Granular Sub Base, Water Bond Macadam, Bituminous Macadam, Dense Bituminous Macadam, Bituminous Concrete, Paved Shoulder & Earthen Shoulder etc., Make Grade Sheet, Layer Chart & Strip Chart, Prepare Daily Progress Report, Weekly Progress Report, Monthly Progress Report, Daily Stock Report Etc., Responsible for Letter dispatching and maintenance in files & System, Weekly Bill Prepared For Lab our Contractor, Make RFI and Measurement Sheet, Entry All Type Data in Computer.
India
NHIDCL
NAGALAND
3.
M/s
MBL, Udaipur, Rajasthan.
Quantity Surveyor
Construction of Udaipur Bypass Road Km from 244+000 to 263+000 in the State of Rajasthan ;Project Length : 19 km, Funded By : NHAI, Project Cost : Rs. 380. Crore.
1st Mar.
2016
21st Feb 2017
As Quantity Surveyor, responsible for Make Grade Sheet, Layer Chart & Strip Chart.Prepare Daily Progress Report, Monthly Progress Report, Daily Stock Report Etc. Responsible for Letter dispatching and maintenance in files & System. Weekly Bill Prepared For Labour Contractor. Entry All Type Data in Computer.
India
NHAI
RAJASTHAN
4.
M/s Engineering Project (India) Pvt. Ltd.
Quantity Surveyor/ Tech. Officer
Construction of ADB Assisted Dry Zone Urban Road Project Surface Water Development Project at Chilaw&Puttalam in the State of Srilanka, Funded By :ADB, Project Cost : SLR 610,042,323.23/.
3rd Jan. 2015
28th Feb. 2016
As Quantity Surveyor, responsible for Make Grade Sheet, Layer Chart & Strip Chart. Prepare Daily Progress Report, Monthly Progress Report, Daily Stock Report Etc. Responsible for Letter dispatching and maintenance in files & System. Weekly Bill Prepared For Labour Contractor. Entry All Type Data in Computer
Srilanka
NHA (RDA)
LANGUAGES:
Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Good
Bengali Excellent Excellent Excellent
Summary of Qualification & Experience vis-à-vis the requirements as per TOR
Requirements as per TOR (Enclosure-B)
Possessed by the Staff Member
Breakup of experience
Brief Description of Project
Man-months provided
1.Essential Qualifications
a.Graduate in Civil Engineering with 5 years for B Tech Civil
BACHELOR OF TECHNOLOGY (CIVIL), from DR. A.P.J. ABDUL KALAM TECHNICAL UNIVERSITY in 2015
He has more than 5 years of experience in highway projects
b.Quantity Surveyorresponsible for Make Grade Sheet, Layer Chart & Strip Chart. Prepare Daily Progress Report, Monthly Progress Report, Daily Stock Report Etc. Responsible for Letter dispatching and maintenance in files & System. Weekly Bill Prepared For Lab our Contractor. Entry All Type Data in Computer
He has conversant with modern survey equipment, total stations auto level, digital levels
From Nov, 2015 to till date
c.Quantity Surveyorshould have worked in atleast one major Highway Project
He has worked in 4 major highway projects
1 Consultancy Services for Authority’s Engineer for Supervision of “6 Laning of LUCKNOW- SULTANPUR Road from (i) Design Km 00+000 To Km 40+000 in state of UP under SARDPNE on EPC basis, Project Length :40.00 km,6/lane;Funded By : UPRIDA; Project Cost : Rs. 12000 Crore.
2.Consultancy Services for Authority’s Engineer for Supervision of “4 Laning of Dimapur- Kohima Road from (i) Design Km 123.840 To Km 138.775 (Existing Km 124.100 to Km 140.000) (ii) Design Km 138.775 to Km 152.490 (Existing Km 140.000 to Km 156.000) (iii) Design Km 152.490 to Km 166.700 (Existing Km 156.00 to Km 172.900) in state of Nagaland under SARDPNE on EPC basis, Project Length : 42.86 km, 4/lane;Funded By : NHIDCL; Project Cost : Rs. 325 Crore.
3.Construction of Udaipur Bypass Road Km from 244+000 to 263+000 in the State of Rajasthan ;Project Length : 19 km, Funded By : NHAI, Project Cost : Rs. 380. Crore.
d. Not more than 60 years of age Less than 60 years
Less than 60 years
4.Construction of ADB Assisted Dry Zone Urban Road Project at Chilaw & Puttalam in the State of Srilanka, Funded By : ADB, Project Cost : SLR 610,042,323.23By : World Bank, Project Cost : Rs. 57. Crore.
CERTIFICATION BY THE CANDIDATE:
I, the undersigned, Shri.Papan Bhattacharya, Plot No. 66, Sector 32, Gurgaon undertake that this CV correctly describes myself, my qualifications and my experience and Authority would be at liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have neither been debarred by NHAI or any other central/stage government organization nor left any assignment with the consultants engaged by Authority/ contracting firm (firm to be supervised now) for any continuing work of Authority without completing my assignment. I will be available for the entire duration of the current project (Consultancy Services for acting as Authority's Engineer for Supervision of PurvanchalExpressway Project (Package I to Package IV) on EPC Basis). If I leave this assignment in the middle of the work, Authority would be at liberty to debar me from taking any assignment in any of the Authority works for an appropriate period of time to be decided by the Authority. I have no objection if my services are extended by the Authority for this work in future.
I further undertake that my CV is being proposed for this project by Egis India Consulting Engineers Pvt. Ltd. and I have not given consent to any other consultant(s) to propose my CV for any position for this project.
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to which consultant’s firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake any employment in Authority’s projects during the period of assignment of this project and Authority shall consider my CV invalid till such time. I undertake that I have no objection in uploading/hosting of my credentials by Authority in public domain.
Date:
(Signature of Personnel) (Day/Month/Year)
CERTIFICATION BY THE FIRM:
The undersigned on behalf of Egis India Consulting Engineers Pvt. Ltd. certify that the qualification and experience details of Shri. Papan Bhattacharya, Plot No. 66, Sector 32, Gurgaon as described in the CV has been checked and found to be correct. It is also certified that Shri. Papan Bhattacharya to the best of our knowledge has neither been debarred by NHAI or any other Central/State Government organization nor left her/ his assignment with any other consulting firm engaged by the Authority/ Contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information about leaving the past assignment is known to the Authority, Authority would be at liberty to remove the personnel from the present assignment and debar him for an appropriate period to be decided by theAuthority.
Date:
(Signature of authorized representative of the Firm) (Day/Month/Year)