Post Job Free

Resume

Sign in

Engineer Safety Officer

Location:
Ludhiana, Punjab, India
Posted:
June 13, 2020

Contact this candidate

Resume:

Saujanay Sharma

B*/****, Telian Wala Mohalla, Old Rajpura

+91-988*******

addspf@r.postjobfree.com

EDUCATION:

Qualification/Degree School/College University or Board Year MBA (Operations & HR) LOVELY PROFESSIONAL UNIVERSITY LPU ( DISTANCE LEARNING) 2019 -Pursuing B. E. (M.E)

Chitkara School Of Engg. & Tech.,

Punjab

Chitkara University 2014-2018

Class XII Mukat Public School, Rajpura C.B.S.E 2013-2014 Class X Mukat Public School,Rajpura C.B.S.E 2011-2012 JOB: IUNDUSTRIAL ENGINEERING / MANUFACTURING

Engineer at Wittur Elevator Components India Pvt Ltd. ( Permanent – 01 August 2018 to till now )

Engineer at Wittur Elevator Component India Pvt Ltd. (TEMPORARY –1st JUNE,2018 –1st AUGUST,2018)

One year Industrial Training at Wittur Elevator Component India Pvt. Ltd (May,2017-May,2018) PROJECTS HANDLE IN JOB:-

Engineering Change Request / Engineering Change Note coordinator (1st Jan 2020 to till date) Mistake proofing coordinator (6th JUL 2019 to till date) PALLET PROJECT (4th June 2019 – 22nd DEC2019)

Before setting full-fledged production line worked in that line for one month as a carpenter, as a Engineer, as a safety officer, As a trainer, As a buyer to get overall feedback from other teams

Carpenters Identification, Selection, trials, Interview, Training.

Layout as per 5S, Layout validation, feasibility test

Tools & Cutting machine procurement

6 M concept application, PPE, Skill Matrix

Time study, Daily demand, safety emergency plan, HIRA, Work Instruction, Takt Time.

Fixture development, concept readiness, Supplier identification, PR, PO.

Milk run concept, Trolleys & rack design, Supplier identification

Cost saving Kaizen: - 1 no., Time saving kaizens :-3

No. of fixture design developed :-3

No. Of trolleys designed:-5 No.

Material flow, Manpower Handling, Manpower distribution,

Drawing study, Bom Audit, Lux intensity, supplier visits,

PFMEA, Work Flow, Material flow.

Design own pallet as per product requirement

People handling

No. Of Mistake Proofing :2

Shed Extension Activity : 3.2 Lacks

Business Case., Budget Monitoring sheet, SWOT Analysis, Risk Assessment

PPAP Submission with CFT Approval.

CSGB SPM 126 TESTER INDUSTRALISATION :- ( 4th Oct 2018 to 2nd Feb 2019) CSGB is the critical component used in pair in any lift .It is the device which protect the lift during free fall condition. Hence also known as safety gear of the lift.

Tester Industrialization with help of Wittur Austria Team, Tester Calibration support.

Layout & its implementation, Work Instruction, Skill matrix, Line capacity, Shift capacity, Time study, PPE.

Safety emergency plan, CTQ preparation, Manpower Handling, Process flow, Material flow from end to end.

Milk run concept for raw material trolley, Prepare trolley design as per line capacity.

No. of Process / Quality & cost related Kaizen:- 1

PFMEA, HIRA, Risk Assessment, Takt Time

No. of trolley designed :-1 total, quantity used in line :18

Layout Modification, Supplier Visit for calibration, Supplier identification, PR, PO, Budget expensive sheet: Capex monitoring

Replenishment cycle for store commissioners, Work Instruction: Fabrication, Assembly, Packing.

Skill Matrix, Risk Assessment, HIRA, Cycle Time, Safety emergency plan, CTQ preparation, Manpower Handling, Process flow, Material flow from end to end.

PFMEA, PFC, Budget expensive sheet: Capex monitoring. SLING 1:1 INDUSTRALISATION: - (10th August 2017 to 13th Oct 2018) Sling is a device in which elevator sits and its sling which moves up and down with the help of motor and the guide rail.

Drawing Study, Raw material sheet availability, Fabrication – Validation, Fabrication time study.

Layout Readiness, PPE, Manpower Distribution, Packing design, packing validation.

Tools Selection, work station readiness, Bom Audit Drawing Vs actual, Kanban Set up,

No. Of kaizen:-1, R&D & Quality Product Validation Support, Fabrication and assembly trails, 5S implementation.

Replenishment cycle for store commissioners, Work Instruction: Fabrication, Assembly, Packing.

Skill Matrix, Risk Assessment, HIRA, Cycle Time, Safety emergency plan, CTQ preparation, Manpower Handling, Process flow, Material flow from end to end.

PFMEA, PFC, Budget expensive sheet: Capex monitoring. SLING 2:1 INDUSTRALISATION: - (17th Oct 2018 to 3rd March 2019) The difference between sling 1:1 & 2:1 is one additional component Pulley in 2:1.

Implented in a same line additional separate work table.

Design new packaging within target cost

No. Of safety Kaizen:-1

WINLINE INDUSTRALISATION: - (16th August 2017 to 20th Dec 2018) Win line is the name of the product. Components include in win line are Lift panels, Floor, Ceiling, platform

Drawing Study, Raw material sheet availability, Fabrication – Validation, Fabrication time study.

Layout Readiness, PPE, Manpower Distribution, Packing design, packing validation.

Tools Selection, work station readiness, Bom Audit Drawing Vs actual, Kanban Set up,

Replenishment cycle for store commissioners, Work Instruction: Fabrication, Assembly, Packing.

Skill Matrix, Risk Assessment, HIRA, Cycle Time, Safety emergency plan, CTQ preparation, Manpower Handling, Process flow, Material flow from end to end.

PFMEA, PFC, Budget expensive sheet.

PPAP Submission with CFT Approval.

WINLINE BLOWER VESRSION: - Advance version of Basic win line

Industrialization in same layout

WINLINE ATLANAT PANEL WITH FALSE CEILING:- Aesthetic wise this product is advance model of win line .

Industrialization in same layout

Packing method designed

WINLINE FRAMED GLASS PANEL - Win line version with Glass fitted panel

Industrialization in same layout

Packing method designed

Drawing study, Bom Audit, Material flow, 5S, Kanban Set up, Emergency Plan, PPE, Fabrication validation

Work Instruction, Time Study, HIRA, PFMEA, Risk Assessment, lux Intensity. ROPE CUTTING INDUSTRALISATION:- (3rd Sep 2017 to 5th Nov 2018)

Machine procurement, Machine set up, Work station, Manpower training, Emergency layout, PFMEA, HIRA

Critical spare parts procurement, PPE

No. Of kaizen:-1

FG trolley design, Material flow from end to end, Process flow chart

PPAP.

SILL CUTTING INDUSTRALISATION: - (1st June 2017 to 10th Dec 2017)

Drawing study, Scrap Handling, Line set up, Work Instruction, Layout & its implementation, PFMEA, HIRA.

No. of raw material trolley design:-3

No. of kaizen filed: 2

Ensured process flow, material flow.

OTHER ACTIVITIES:-

Engineering change request & Engineering change note process implementation.

First time mistake proofing audit in Wittur (Documentation) score 34%.

Time study of each product.

No. Of Bom Audits (As per assembly)-63 Nos.

No. Of Bom Audits (As per drawing)-77 Nos.

PROJECTS HANDLE IN UNIVERSITY

Project made: Modification of Crank Link Slider (March,2016-April,2016) In this project simple Crank Link Slider was modified into Power Filer and Power Hacksaw. Manufacturing Skills used: Welding, Forging, Sheet Metal

Project made: Crank Link Slider (March, 2015-April, 2015) This mechanism is used to transform rotational motion into translational motion by means of rotating driving beam a connecting rod and a sliding body.

Manufacturing Skills used: Welding, Sheet Metal, Forging

Presentation Delivered: Sensors and Transducers (October, 2014-November,2014) ACHIEVEMENTS:

Academic

Got 2nd prize in safety Kaizen competition ( 8th March 2019 )

Secured 3rd position in 4thsemester and scored 9.12 SGPA.

Received best student award in 10th class.

Cultural

Participated in marching contingent on Republic Day in 2013

Awarded Active Voting certificate by Block election officer in 2017. Sports

Awarded best skipper award in school sports meet in 2012.

Won a 100 meter Sack race in school sports meet in 2012. PROFESSIONAL SKILLS:

Application Software: Draft Sight, Visio, Excel, Outlook, Power point., Microsoft Word,Microsoft Team LANGUAGES KNOWN:-

ENGLISH

HINDI

PUNJABI

(Saujanay Sharma)



Contact this candidate