Post Job Free

Resume

Sign in

Engineer Civil

Location:
Cairo, Cairo Governorate, Egypt
Posted:
June 14, 2020

Contact this candidate

Resume:

Personal Information

Name: Ramez Talaat Garas Asaad

Date of Birth: 01 January 1978

Marital Status: Married

Nationality: Egyptian

Military Service: Finally Exempted

Address

Address: * ******* **rad St. - Thalathiny - Omrania Gharbia -Giza

Phone: 02-35609344

Mobile: 012********

Email: adds7g@r.postjobfree.com

Qualification

Member of Egyptian Syndicate of Engineering.

B.Sc. of Civil Engineering, Graduation Year 2003.

Graduation Project "Very Good" Surveying.

Faculty of Engineering "Assuit University".

Courses

&

Computer skills

Inspection Quality Control, Quality Assurance and Total Quality Management of Materials in Construction Projects.

Location : The American university in Cairo( Engineering and Science Service) at December 2017

Cost control of Engineering Projects Location : The American university in Cairo( Engineering and Science Service) at february2014

Microsoft Word, Excel, Windows XP, Windows7, internet, AutoCAD.

1)Vinci Construction :

Project: Greater Cairo Metro Phase 3 line 3.

Position: Senior Quality Control Engineer

Working Period: From May 2018 TO Now.

Owner: National Authority For Tunnels(Ministry of Transport).

Owner consultant: Systra consulting Engineers.

Experience

2)Orascom construction

Project: Hotel 6000 New El Alamein

Position: Senior Quality Control Engineer

Working Period: From May 2017 TO March 2018

Owner: Engineering Authority of the Armed Forces

Owner consultant: ECG consulting Engineers

Description of work:

The project consists of foundations Piles, Reinforcement Raft (Cap), a five star hotel building, 12 floors, 6 towers, a mall and service buildings. And All Finishing External, Internal Landscape.

3) Orascom construction

Project: (Ministry of defiance) New Capital.

Position: Senior Quality Control Engineer

Working Period: From 1 September.2016 to 30 April 2017.

Owner: Engineering Authority of the Armed Forces

Owner consultant: Sabbour Consulting.

Description of work:

The project consists of building, 07 floors And All Finishing External, Internal & Landscape.

Experience

4)Orascom construction

Project: (Golf Views project) 6th of October City

Position: Senior Quality Control Engineer

Working Period: From 10 May. to 30 August 2016

Owner: Palm Hills Development

Owner consultant: AAW consulting Engineer

Description of work:

The project consists of Villas And All Finishing External, Internal & Water Supply and Sewage & Manholes &Internal Roads Consist of curbs & interlock (Landscape.)

5)Contrack Watts(Orascom).

Project : El Maliz Civilization Airport Project,

Sinai Egypt

Position: Senior Quality Control Engineer

Working Period: From 1September. 2015 until 08 May 2016

Owner: Engineering Authority of the Armed Forces

Owner consultant: ECG consulting Engineers

Description of work:

Consists of the main hall, the control tower building, service buildings, roads,& infrastructure For water Supply and Sewage electricity Works.

6)Orascom construction industries and Hassan Allam(JV) :

Project : Potable water,Purification Plant(intake) and Row Transmission Lines from Nile River to 6th of October City by power (1.7million)m3/day

Owner: the Executive Authority of the potable water and sewage water(sanitation)

Owner consultant: consulting center for civil and Environmental Engineering(Enviro civec)

Working Period: From 13 Feb. 2013 to 01 Feb. 2015

Position: Quality Control (Civil Engineer)

Description of work:

Infrastructure:

Excavation and Alignment,Levels, All axes, dimensions, and pipe lines,locations should be checked with the basic hydraulic and Basic civil drawings, soil Replacement and (compaction Test)According to the report of the consultant.

Consist of the pipelines from 3 lines(Basic, spare, future)

Back filling between the pipe by layers every 25cm(compaction Test) and around the chambers

The pipe lines consist of chambers(flow meter chamber, Air valve chamber, Wash valve chamber)and pump station, thrust Block for Elbow by specific Angle

The chamber Rooms Reinforcement section(Raft, Wall Slab) and Precast Slab(covers the slab)Moving

7)Orascom Development Holding Egypt :

Project :Orascom Housing Communities (Haram Life

6th October)

Working Period: From 1 April 2008 to 30 August 2012

Position: Senior Quality Control (Civil Engineer)

Description of work:

Infrastructure:

Follow up surveying works in the location and leveling the pipe lines of PVC (Sewage water, Potable water, Fire fighting), Polyethylene pipes (water supply) inside the buildings (sanitary work),Excavation by levels, Soil replacement according to the report of the consultant, Receive the works according of the project specifications .

Reinforced Concrete works:

Foundation (Raft, spread footings) and Pre-Cast concrete (Fence)

Finishing works:

Building works, Plaster works, Painting works, Tiles (ceramic) works

Landscape:

Installing Curb and paving blocks by levels

Check the quantities according to the contract clauses and receiving requests.

Consultant of the Project: Hamza Associates

8)Orascom Trading:

Project: Orascom Telecom (Mobinil)

Working Period: From 1 April 2007 to 31 march 2008

Position: Civil Engineer

Description of work:

Check of the station location by GPS,

Excavation by levels,

Soil replacement according to the report of the consultant, Casting the Raft,

Installation of the steel structure,

Casting the station fence spread footing,

The station contains shelter (power and the cables which connected to antennas).

9)Master Line touristic projects:

Working Period: From December 2005 to February 2007

Project: (STEIGENBERGER) AL DAU Beach Hotel RED SEA in Hurghada.

Description of work:

Landscape works including backfilling works, Deck around the pool consist of Random marble, Stamped concrete, finishing works of machines chamber and Erection precast slabs of building stores..

10)Elsalam Construction Company:

Working Period: From April 2005 to November 2005

Project: The reparation and Recent (Sharm Life Hotel) in Hurghada.

Description of work:

Finishing of works Consist of plaster works, Painting works, Block works, raised floor tiles, cladding works and false ceiling.

11)ARCHIRODON CONSTRUCTION (OVERSEAS) CO.S.A Company

Project: Suez Canal Container Terminal Co. (S.C.C.T) (Port Said East Port)

Working Period: From April 2004 To March 2005

Position: Civil Engineer

Description of work :

a.Infrastructure work:

Follow up all surveying works in the level, location, Excavation, Back Filling, Soil Layers Replacement, Alignment & Location of pipe lines (Axes & Levels of concrete pipes, UPVC, HDPE, PRE – cast Manhole

Installation of Block Paving, sand Cement works and Road Marking Used for Platform

b.Reinforcement concrete works for foundation with Rafts, Walls, Columns, and Beams.

Steal Structure Works

Work shop Building:

Purpose: Facilitating the work of maintenance and lubrication supply of the trucks, cars from fuel feeders.

Description of all works:

Erection of frames and joints, nuts, bolts, splices and (steel, Concrete) Together in the building such stairs, ceiling (composite section).

Reefer(refrigerator-the container)

Consist of frame including the greating and stairs of steel to be conjunctive with other by connection, bolts, nuts and erection upon the frame outside, electrical switches till can the supervisor contact this cable with the container during he is resident on harbor