Construction Manager/ Electrical Engineer

Location:
Dammam, Eastern Province, Saudi Arabia
Salary:
Negotiable
Posted:
June 11, 2020

Contact this candidate

Resume:

Page * of *

DANTE MARQUEZ APOSTOL ELECTRICAL EL

PROJECT MANAGER

E-mail : addq6u@r.postjobfree.com

Current Address : Al- Tobaishi St.,Dammam, KSA

Mobile : +966 - 058*******

Summary of Experience

Over 30 year experience in Electrical & Instrument, Mechanical, Operation /Maintenance

& Construction. Project Management, Execution & Implementation. Electrical Installation, Inspection, Testing, Pre-comm. & Commissioning, Start-Up, Turn-Over

(Preliminary Acceptance PAC & Final Acceptance FAC), includes project documentation, close out but not limited to QA/QC & Safety Administration for all projects handled in various sectors such as SWCC, ZABIC, Royal Commission for Jubail & Yanbu, Saudi Aramco projects, includes Civil Structural, site preparation & construction, Cross-Country Pipelines for Oil, Gas & Water Facility, Electrical Over Head/Transmission Lines, Sub- stations from Upstream to Downstream Electrical Power System (MV,HV & LV).Ensure projects are executed in compliance to Saudi Aramco Standard & International standard

& Design/specification up to completion with the satisfaction of Clients & Company profits & return of investment. Includes cement plant operation & maintenance, design & construction & modification.

Career Profile

Worked with SWCC EPC project for Yanbu Madinah Water Transmission III for E & I Mechanical, Inspection, Testing, Pre-commissioning & Commissioning, Start-Up & Initial Operation & Maintenance of the project in Yanbu-Madinah KSA.

Worked with Saudi Aramco projects such as Manifa Well Heads Pipeline Gathering/Cross Country oil & water injection project includes E & I works for Manifa, Safaniya & Al-Khafji Refinery.

Worked with Saudi Aramco project Khursaniyah/Abuhadriyah Refinery Well Heads Pipeline Gathering/Cross Country oil & Maintain potential project includes E & I works.

Worked with Saudi Aramco Riyadh/Wasea Bulk Plant project for Gasoline, Crude Oil steel tank storage includes pipeline, construction & tie-in to Cross Country pipeline,

Worked with Saudi Aramco Rabigh Refinery Cathodic protection project of the entire facility of refinery.

Worked with Saudi Aramco Khurais Refinery for oil & water with 600 well heads & 900km Cross country & pipeline gathering includes E & I construction for oil & water injection mega project

Worked with Saudi Aramco Bulk Plants project in Dharan, Al-Hasa, Safaniyah, Al-Jouf & Turaif, KSA.

Worked with several Cement Plants, Power Plant Operation & Maintenance, in KSA Saudi Kuwaiti Cement & (2) cement plants in Philippines.

Worked with (3 line 330TPD) Cement Plant expansion project tested/commissioned & operation in Philippines

Worked with design/construction & operation/production of (6x250C.M.) concrete ready mix plants in KSA.

Worked with design/construction & operation/production of (4x150TPH) asphalt plants in KSA.

Page 2 of 9

Worked with design/construction & operation/production of (6x150TPH) aggregate crushing plants in KSA.

Worked with (3 line 330TPD) Cement Plant expansion project in Philippines Work Experience

SINOPEC International Petroleum Service Corporation: Position : Dy Commissioning Manager

SWCC- Yanbu-Madinah Water Transmission System (EPC Project Completed) January 11, 2015 to January 21, 2020

Responsible for the complete Electrical, Instrumentation, Mechanical piping & rotating equipment testing, pre-commissioning & commissioning/energization, includes start-up

& turn-over of the project. Attend regular weekly/progress meeting with Client & Consultant, Plan & collaborate with vendors & construction team includes interface work to ensure all testing activities are complaint to standard & norm practices. Coordinate with SEC for all electrical system energization.

MV & LV Switchgears (13.8kV) & individual equipment such as CTs, PTs, CVTs, Circuit Breakers (SF6 & Vacuum), Isolators, Earth Switches, Lightning Arrestor, and Protection relays in 110KV, 13.8KV and 33KV Outdoor Substations.

Power Transformers 2x50MVA, 110Kv/13.8kV with OLTC schemes, protection schemes, various protection tripping, interlocks, inter tripping /stability test including reactors.

Distribution Transformers 8x2500Kva, 13.8Kv/400V, 8x1500Kva, 13.8Kv/400V with OLTC schemes, protection schemes, various protection tripping, interlocks, inter tripping/stability test.

Pad Mounted Distribution Transformers 8x1500Kva, 13.8kV/400V, 50x200Kva, 13.8kV/400V with protection schemes, various protection tripping.

Main Pump Induction Motors,48x10.2MWx13.8kV with Auto Transformer Starter

Booster Pump Induction Motors,28x600kWx13.8kV with Auto Transformer Starter

Diesel Engine Generator 20x300Kw for standby electrical power system

UPS Panels 20kV, 400V/230V (24 Units)

Package Type Air Compressor System (30 Units) motors with Automatic Control panel.

Trouble shooting of all electrical circuits, control and protection circuits

MV,HV & LV cable testing/Hi-Pot

HVAC system & Fire Alarm System

VARIOUS TYPE OF MOV’s – Motor Operated Valve 400V(100 Units)

HPU – Hydraulic Power Units for MOV

Page 3 of 9

SINOPEC International Petroleum Service Corporation: Position : Project Advisor/Site Manager

Wasea Bulk Plant Project- Saudi Aramco (EPC Project Completed) Date : December 14, 2014 to January 11, 2015

Responsible for the complete Electrical, Instrumentation, Mechanical piping & rotating equipment testing, pre-commissioning & commissioning/energization, includes start-up

& turn-over of the project. Plan & collaborate with vendors & construction team includes interface work to ensure all testing activities are complaint to standard & norm practices. Coordinate with Saudi Aramco for the energization of sub-station.

SF6 MV & LV Switchgears (13.8kV/440V) & individual equipment such as CTs, PTs, CVTs, Circuit Breakers (SF6, Vacuum, MCB & ACB), Isolators, Earth Switches, Lightning Arrestor, and Protection relays.

Power Transformers 2x5000Kva, 13.8kV/440V with OLTC schemes, protection schemes, various protection tripping, interlocks, inter tripping /stability test.

Switch Rack Shelter (Out Door) 6x440V/230V/110V.

Main Pump Induction Motors,30x150Kw,440V with Direct Online Starter

MOV- Motor Operated Valves (30 Units)

Oil Separator Package 2 Units (Switzerland Vendor)

UPS Panels 20kV,400V/230V (10 Units) with dual battery bank

Package Type Air Compressor System (10 Units) motors with Automatic Control panel.

Trouble shooting of all electrical circuits, control and protection circuits

MV,HV & LV cable testing/Hi-Pot

HVAC system & Fire Alarm System

SINOPEC International Petroleum Service Corporation: Position : Construction Manager/Project Advisor

Manifa/Tanajib/Safaniyah Pipeline Gathering Project- Saudi Aramco

(EPC Project Completed) K.S.A.

January 18, 2012 to December 14, 2014

Responsible for the complete Electrical, Instrumentation, Mechanical piping & rotating equipment testing, pre-commissioning & commissioning/energization, includes start-up

& turn-over of the project. Plan & collaborate with vendors & construction team includes interface work to ensure all testing activities are complaint to standard & norm practices.

SF6 MV & LV Switchgears (2x13.8kV/440V) & individual equipment such as CTs, PTs, CVTs, Circuit Breakers (SF6, Vacuum, MCB & ACB), Isolators, Earth Switches, Lightning Arrestor, and Protection relays.

Power Transformers 2x1500Kva, 13.8kV/440V with protection schemes, various protection tripping, interlocks, inter tripping /stability test.

Switch Rack Shelter (Out Door) 15x440V/230V/110V. Page 4 of 9

Lighting System

MOV- Motor Operated Valves (50 Units)

Trouble shooting of all electrical circuits, control and protection circuits

MV,HV & LV cable testing/Hi-Pot

Pipeline inspection/NDT testing, flashing Hydro testing

MOV hydro testing/leak testing

Fire Fighting system water & foam

Pump/dispensing Skid for (6) Gasoline, (6) Crude Oil & (6) Bunker Oil Over all Responsibility:

Serve as Industry Department advisor/Consultant in all EPC project aspect but not limited to project management, Implementation, Construction, Procurement, Engineering, Safety & QA/QC administration, testing, pre-commissioning, commissioning Start-Up.

Assist design dept. & construction strategies to support successful project planning & providing consultation expert gesture & overseeing construction project team.

Meeting with Client-Saudi Aramco PMT’s to assist resolve project issues in good track to avoid delay impact to schedule citing advance recommendation to fast track activities & major deliverables. As well as to maintain good rapport with project team member & Client side.

Over all function as company team leader providing management work direction to guide less experience employees as required.

Al –Zoman Al-Hajri Partners & Company (Saudi Arabia): Position : Technical Division/Construction Manager Date : February 14, 2009 to December 20, 2011

Over all responsible for all existing projects – Civil & Structural, Electrical & Mechanical Construction includes testing & commissioning and operation & production. Job-Ex & bid preparation/submittal to Client.

Project management/implementation/execution for road construction, site preparation, development ensure project are within budget control advance schedule to obtain early completion of the project.

Job-expedition for estimation/Bid preparation & submittal for Municipality, Royal Commission Jubail, Zabic & other private companies.

Constructed/Installed (4) Units 150TPD Stationary Asphalt Plant & (2) Mobile Asphalt Plant to cater project under execution at remote areas. (8) Stone Crushing Plant for aggregate material to sustain high demand in road /bridge construction & other private sector infrastructure projects.

Constructed (4) Stationary Batching Plants (Concrete Ready Mix 250C.M/hr. associated with Reverse Osmosis Plant to maintain water demand in the plant.

Constructed Ice Flake Plant & Water Chiller – for Batching Pant & Blocks Factory

Constructed Concrete Interlock Block Factory with Automatic feeding system & Drying System.

Constructed Concrete Kerbstone Plants.

Page 5 of 9

Construction of School Building (4) story/level in Deffi in Jubail, (3) Level 16 rooms in Dammam School,

Constructed various private Villas in Khobar, Dammam Rastanura, Jubail, Al Hassa with Polyethylene wall/slab insert for more cooler dwelling.

All projects includes electrical & mechanical works.

ISO application of Saudi Aramco certification of the plants own by the company

Prepared QA/QC manuals for each plant operation & maintenance

Prepared/Approved by Saudi Aramco QA/QC Manual

Prepared/Approved by Saudi Aramco HSE Manual

Review project scope works & IFC drawing prior to execution & highlight quantities of work which are not clearly included in pay items & reflect items as change order.

Prepared construction method of statement & technical statement each project for implementation.

Faysal M. Al-Qatani & Sons C0. Pipeline Specialist (Saudi Arabia): Position : Project Manager

Khurais Refinery Saudi Aramco, Pipeline for Oil & Water Injection System Date : June 2007 to October 26, 2008

Direct and oversee the pipe line construction of Oil & Water Well (Injection System) heads piping/welding installation, main pipeline trunk lines, Overhead pole transmission for Electrical Power lines to Switch Rack & Control System & Instrumentation and Civil & Structural works, fabrication of concrete foundation, pipe spool, painting & coating with FBE, site installation of pipe spool including external coating application, holiday testing, pipeline DNT testing, Pipeline cleaning/flushing & hydro testing. Ensure QA/QC function are administered in accordance with Saudi Aramco standard requirements & Safety matters are implemented on site, ensure all works are being executed with RFI’s test reports are witness by Client representative & proper documentation are filed accordingly for project close-out & turn-over. Ensure construction are compliance with Saudi Aramco standard/specified in project specification to achieve ECC, MCC prior to Testing, Pre-commissioning & Commissioning with the satisfaction of Client or Saudi Aramco representative.

Saudi Aramco Khurais Oil & Gas/Water Injection System for Refinery, Construction of (8”10”,16”,24” & 30” Piping System for Oil and Water Injection System (330 Oil Well Heads & 150 Water Well Heads) 800 kms radius pipelines, Installation of Electrical Equipment, Over Head Transmission Lines & Cathodic Protection System & Instrumentation.

Bin Quraya Est. Pipeline Specialist (Saudi Arabia): Position : Project Manager

Khursaniyah/Abuhadriyah Refinery Saudi Aramco, Maintain Potential - Pipeline for Oil & Water Injection System

Date : December 24, 2005 to March 08, 2007

Responsible for the project construction, execution, implementation, effective planning, organizing, leading and project control. Review plans / IFC drawings. Direct oversee the implementation of all endorsed project. Attended to all major key accounts projects during management / coordination meetings. Review and evaluate all works plans, official cost estimates, cumulative costing, work progress and accomplishment reports gathered for invoice preparation. To ensure project implementation a tune to the milestone within the allocated budget. Ensure quality control and assurance are in compliance to Saudi Aramco Standards or project specification. Attend project job – ex, site visit for all bid invitation for estimation, review tender documents and coordinate with Engineering Dept. to formulate best cost/estimate for final approval of General Manager and preparation of Bid proposal & submittal. Enhance cultivate continuously Page 6 of 9

manage strong internal relationship with people in all levels of the company and stablish good rapport with the clients for a view to level up good foundation for the overall success of the business.

Saudi Aramco, Maintain Potential, Abu-Hadriyah, Oil & Water Injection Pipelines Saudi Aramco

Construction of 16”, 20”, 30” Oil & Water Injection Pipeline System 300 (Site Well Oil Heads), (60 Site Water Well Heads) Including Electrical and Instrumentation and Civil & Structural Works, Testing & Commissioning.

Fuel Gas Pipeline (16”) & gas Metering Station for Yamama Saudi Cement Co. tie-in with Saudi Aramco, Gas Pipeline includes Testing & Commissioning.

Construction of 42” Pipeline QTR Offshore for Crude Oil Ship Loading Facility, Saudi Aramco (Qatif).

Construction & tie-In of 16” Gas Pipeline for Yamama Cement & Al Turki Steel Factory.

Asian Construction & Development Corporation (Philippines) Position : Operation Manager – Engineering & Construction Division Date : December 05, 2003 to July 18, 2005

Manage the overall operation of construction with multi-discipline engineers in the installation, erection, testing & commissioning in accordance with approved design specification, QA / QC and contracts.Review bid documents, specification and approved drawings prior to construction implementation, execution and recommendation for any revision and alteration.Review & approve all local & imported materials conformance to specification and standards to ensure compliance & fitness in the installation.Expedite & pre-qualification / approval of bids for package subletting, equipment rentals & manpower.

Projects Handled:

Construction of four (4) Story Building Shopping Mall, Including Electrical & Telecommunication, HVAC System & Plumbing, Fire Protection with Solar Energy System for Park & Walk Ways Lighting includes testing & Commissioning & Turn- Over (Legaspi City, Philippines)

Construction of Pulp & Paper Abacca Processing Plant (Capacity 250T)

(Monetary Raw Material) Alendeco, Tabaco Albay, Philippines, major equipment install – (4) Units 1500KVA MAK CM32 Diesel Engine,(6) Units Water Chiller, Water Treatment process with Four (4) Stage Water Cooling Tower,(4) 700 HP Steam Boiler,(4) Globe Digester,(2) Stainless Water tank I Million Liters, (2)Line Pulp dryer Machine, HVAC System for Building & Processing Area.

Geothermal Power Plant – Tiwi Albay, Philippines – Upgrading Steam Outlet

& Inlet Pipe line from well site Sumps Lining Phase II NagO8 to NagO71 Injection Pipeline, Brine Injection Line and Upgrade WSO1 to WSO3 road Spillway.

Review evaluate Bid Proposal – Extension of Metro Rail Terminal (MRT) Santolan, Pasig to Junction Cainta Rizal and 60 Story Building Roxas Blvrd. Manila, Philippines, Proposed Project.

U.S Military Airbase for Iraq proposed project.(Budgetary Purposes) M.S. Al- Suwaidi Industrial Services (Jubail Industrial City, K.S.A) Position : Construction Manager/Senior Project Engineer – Construction Division Date : March 25, 2002 to November 30, 2003

Responsible for the project operation and construction, Installation, erection, testing, commissioning and turn over. Ensure project implementation are in accordance with specified Saudi Aramco standard. Review IFB / IFC construction drawings for material Page 7 of 9

take-off & estimates. Prepare budget cost prior to implementation of projects assigned. Prepare manpower, equipment & materials and temporary facility for mobilization upon receipt of NTP. Ensure all material are technically evaluated & in compliance

(SAMMS)with Saudi Aramco Engineering standard (SAES) and construction phases adhere with Safety Procedures and high level of Quality Assurance & Standard. Maintain the construction phase & properly monitored, planned by meeting schedules & milestone. Highlight potential problem & resolve issues accordingly (i.e - Changes Orders)Attend regular site weekly progress meeting with (SAPMT) Saudi Aramco Project Management Team and other project technical meetings, Musadia Jeddah, DOB Dammam & Dharan Head Offices for Saudi Aramco projects. Project Handled:

Saudi Aramco (5) Bulk Plant Projects (Al-Jouf, Turaif, Safaniyah, Al Hassa & Dharan) Upgrading of Pipeline Facilities, Storage Tank (1 M liters/tank capacity) for Gasoline/ Diesel / Merox and Electrical Power System, Fire Alarm Foam Protection, Automatic Gauging Transmitters, TMS –Terminal Management System

(PLC Siemens Control) other Related instrumentations, testing & Commissioning but not limited to Civil & Structural works.

Construct & Install Magnesium Anodes & Related Power & Controls System, Cathodic Protection System, testing & Commissioning (Saudi Aramco Rabigh Refinery & several Short form contracts, Oil & Gas Piping Maintenance, Electrical & Instrumentation & HVAC maintenance.

Refurbish (2) Units 500 MW Gas Turbine Generator, including cooling towers, chillers and Water Treatments Plant.

Review / Design, Electrical Power / HVAC System for Insulation Factory – MS Al Suwaidi Co. Jubail Indusrial City.

Design Electrical Power / HVAC System for Steel Forming Factory MS Al Suwaidi Co. Dammam KSA.

IBN Hayan Plastic Company Jubail Industrial City, Installation of Electro Mechanical System.

Supply & Install of (2) Boiler Desalter – Yanbu Petro Chemical K.S.A. Triump Development Corporation:

Position : Maintenance Manager/Electrical Superintendent Continental Cement Corporation (Norzagaray, Bulacan-Philippines, K.S.A) Date : August 07, 1995 to June 25, 2002

Take Charge the Operation and Maintenance (O & M) of Two Line Dry Process Cement Plant (3,300/900TPD) & Power Plants. Master trouble shooter, fault finding of all malfunctioning Electrical Mechanical equipment as time need arise when duty Engineers

& Technicians not able to rectify problem within time frame in order not to hamper the operation and prevent production losses. Maintain flow level of spare parts and keen technical evaluation, selection of material replacement or equivalent. Prepare/ review daily maintenance report and collate major issues affecting plant operation and discuss to the board of Management for necessary improvements, innovate requires solution in the system for smooth operation of the plant. Member of Board of Committee for the implementation of “ISO” Certification of the plant. Expansion Project In Plant Handled:

Designed Electrical Power Supply/Sub-station, Constructed & Install (3) Line Semi Automated Dry Process Cement Plant (3,300 TPD) and tested & Commissioned.

Installed, Tested & Commissioned (3) Units 15 MW Gas Turbine Generator for independent power supply for each Cement Line from National power Corporation

(NPC Phil.)

Constructed / Installed of (4) Units 240 TPH Limestone Crushing Plant Page 8 of 9

Modified (8) Units Dust Collecting to Electrostatic Precipitator (FL Smith Co.) to obtain zero/minimal dust emission to increase dust collection system & enhance compliance of environmental pollution control.

Install additional (4) line Crushing Aggregate Plant to support concrete mixture demand for the construction of (3) Cement Plant Expansion Program.

Construct / Install of 115KV Electrical Tower Transmission line connecting NPC grid source (20KM),Sub-Station (2)60MVA 115kV/34.5kV,(4)25MVA,34.5kV/440V Power Transformer Test & Pre-commissioned & Commissioned

Installed tested MV/LV Switchgear with UPS 25kV

Eastern Province Cement Co. (Khursaniyah, Dammam K.S.A) Position : Inspection/Planning & Scheduling Engineer Date : December 24, 1989 to July 16, 1995

Report to the Maintenance Manager, conduct routine ocular inspection of all install plant electrical/mechanical equipment, monitor all motor bearing performance (temperature, vibration & physical conditions record in the plan index and data base system (PC) for schedule maintenance and replacement if necessary. Issue work orders to respective cost centers for works execution and recommended solution and further analyze fault & problems and rectify to avoid recurring maintenance work. Evaluate materials, spare parts durability and recommend alternative proven performance to enhance better operation of machinery. Supervise/Collaborate with the Technician / Mechanic in trouble shooting, fault finding, repair & over haul equipment, related Instrumentation & Calibrations.

Major Equipment Handled:

Heavy Duty Compressors( Rotary, Screw & Piston Type)

High Volume Air Fans & Blowers for de dusting system, cooling & handling material storage.

Large motors .75 to 250 HP (ABB / Siemens/ Dodge etc)

Synchronous Motors 500 HP( Rap Around DC)

Over Head Cranes Double / Single Girdle

Package Type Air Conditioner, A/C Split / W Type, Humidifier & Chiller

Hot Gas Generator

D.C motors kiln drive, Asynchronous motors for Mill Drives

Centrifugal Pumps

Turbine Pumps for Water Treatment System

D.C Thyristor, Speed Drive Controllers

60 MVA 13.8KV Power Transformers & 25 MVA Distribution Transformers

SF6 Circuit Breakers / Medium & Low Voltage

Electro-Static Precipitator zero dust emitting Controls System

Dust Collector Filter Bags System

Rizal Cement Company (Binangonan Rizal, Philippines) Position : Power Plant Engineer/Asst. Operator)

Date : April 12, 1982 to November 20, 1989

Take Charge Operation & Maintenance of (7) Units 1250 KVA Diesel Engine At Power House Section for standby Generating Power, Lubrication, Overhauling of diesel engine, centralized air compressor system, water utility & pumping station.

Implementation of Cost Effective, Planned & Predictive Maintenance Program & prepare inspection ad hoc report to General Superintendent.

Participated in various in house training and seminars related to Power Plant Operation & Maintenance, Waste Water Handling System, Human Relation & Manpower Supervision & Leadership Training.

Page 9 of 9

Estimating / Drafting / Assist Senior Electrical Engineer for the design modification of Power & Lighting Load calculation and Motor Controls Diagram.

Electrical Trouble Shooting and Overhaul & Maintenance of various type Air Compressors Heating, Ventilating & Air Conditioning System, Centrifugal pumps, water pumps in the Plant, motor overhauling, rewinding & controllers.

Prepare daily operation report

Professional Details

Professional Qualification : Bachelor of Science in Electrical Engineering

(Graduated-1988)

: Bachelor of Science in Mechanical Engineering (Graduated)

: Registered Electrical Engineer – Philippines Regulation & Commission

Institute/University : FEATI UNIVERSITY – Sta. Cruz Manila, Philippines Registration / License No : 0008926 (1989)

Member : IIEE - Institute of Integrated Electrical Engineer of the Philippines

Computer Literacy : Microsoft, Excel, Power Point

Personal Details

Home Address : A. Bonifacio St. Libid Binangonan Rizal,Philippines Date of Birth : 22 – 10 - 1965

Passport No : EC7550873

Sex : Male

Nationality : Filipino

Marital Status : Married

Languages known : English, Tagalog, Arabic

Declaration

I hereby declare that the information furnished above is true to the best of my knowledge.

Date : Yours Faithfully,

Place :

Dante Marquez Apostol

Electrical Engineer - 8926

PRC - Philippines



Contact this candidate