Post Job Free
Sign in

Engineer Project

Location:
Indonesia
Salary:
30.000.000
Posted:
June 09, 2020

Contact this candidate

Resume:

Curriculum Vitae

Personal Statistics

Name : Bambang Hermanto, ST

Place / Date of Birth : Batam/December 28, 1977

Nationality : Indonesian

Religion : Moslem

Marital Status : Married

Passport No. : B6096934

Date of expiry: 20 March 2022

E-mail Address : addpd7@r.postjobfree.com,

addpd7@r.postjobfree.com

Contact Address : Tiban Koperasi Blok DA No. 4 Tiban – Batam, Riau Island - Indonesian 29426

Mobile Phone No. : +62-812-********

Education

Bachelor Degree of Industrial Engineering in The University Riau Kepulauan Indonesian

(UNRIKA).

Seminar / Course Attended

Radiographic Interpretation (RI) ASNT NDT Level II, Conduct Catur Training Centre. Certificate No.: RI-190030. Expiry: 16 June 2024.

Ultrasonic Testing (Plate & Pipe) (UT) ASNT NDT Level II, Conduct Catur Training Centre. Certificate No.: UT-170006. Expiry: 02 February 2022.

Magnetic Particle Testing (MT) ASNT NDT Level II, Conduct Catur Training Centre. Certificate No.: MT-160035. Expiry: 19 December 2021.

Penetrant Testing (PT) ASNT NDT Level II, Conduct Catur Training Centre. Certificate No.: PT-160035. Expiry: 19 December 2021.

Radiography Interpreter (PCN) Level II. Conduct by Intec Training & Certification Sdn. Bhd. Malaysia. Certificate No.: 331936. Expiry: 29 March 2021.

Attendance Welding Inspector (CSWIP 3.1) Conduct by TWI.

Pulse (Safety) Conduct by PT. Technip Indonesia.

Occupational Health and Safety Management System (OHSAS 18001:2007, ISO 14001: 2005, SMK3).

Operation Principles & Radiation Safety of X-Met 3000TX+, Start-up of Daily Measurements, Storing of Measurements and File Transferring Training Conduct by NDT Instruments / OXFORD Instruments.

Certified Welding Inspector Training Course for Oil & Gas and General Industry, Conduct by IKBAL M-YOS, APITINDO & MIGAS. Certificate No. 051/WI-III/V/2003.

Certified Developing & Implementing ISO 9001: 2000 Training Conduct by PT. TÜV International Indonesia.

Certified Elementary Conversation Class Conduct by Putra Batam English Course. Carrier History:

A progressive career which has developed professional experience as a QA/QC Engineer / Piping / Mechanical / Welding Inspector for the Civil, Structural, Petrochemical (Plants), Offshore, Onshore oil and gas industry more than 23 years. Involved in all aspects of fabrication and welding, Project inspection meeting, setting up quality control systems, developing weld maps, non-destructive test requirements, welder qualifications tests, Witnessed weld procedure & mechanical tested, checked Subsea Manifold, Subsea Piping Equipment, Pipeline and Hot Tap (TDW) (Intermediate Joint, Low and High Pressure Wellhead Housing Joint, Float Shoe Joint, Landing Sub Joint), Pipe in Pipe/Double Joint, Threaded Inspection. Interpretation, Anaerobic Reactor Tank, Neutralizer Tank, Oxidation Reactor Vessel, Turnaround (TAR) Petrochemical of code and standard (ASME, AWS D1.1, API 1104, API 5B, API 5L, API 650, DNV and EN Rules) and others, as applicable procedure, Reviewed client specification and approval drawing. Endorsed & compiling final documentation packages, Factory Acceptance Testing (FAT) and System Integration Testing

(SIT), as built drawing & liaison between contactor and client's inspectors, ensuring all work is carried out to client’s specifications and project specific procedures. Conversant with applicable codes, standards and specifications normally associated with offshore / onshore fabrication as well as methods and techniques applicable to this type of construction. Project Experience:

PT. TechnipFMC Indonesia

Period : December 2019 – June 2020

Position : QC Engineer / Inspector

Responsibilities:

The civil activities like Excavation, Backfilling, FDT (Field Density Test), Lean concrete, Reinforce concrete, Curing, Moisture test, Surface preparation, Concrete coating, DFT(Dry Film Thickness).

Witnessing of the testing of compressive strength of concrete at the third party laboratory.

Witnessing of field-testing like Compaction test FDT (Field Density Test) and Dry film thickness (DFT).

Inspection of concrete finishing, all formwork and reinforcement according to standard and specification.

Surveillance inspection of all civil & structural ongoing activities at project site.

Planned work activities ensuring that isometric drawings, P&ID’s, equipment and materilas were availables to execute project in a timely manner.

That work crews were knowledgeable of work procedures and specifications.

Supervised performance of hydro-testing, piping titanium, SS, CS installation in platforms, pipe racks, tank & vessel.

The inspection and testing jobs are planned, executed and completed, different disciplines such as material inspection, fit-up, dimension control, welding, NDT etc.

Monitor the quality of service provided for fabrication/contruction works in terms of discipline, compliance with drawings/project specs, prompt reporting etc.

Ensure that quality of the project is maintained as agreed in the contract, project quality plan, ITP.

Coordinate with QA engineer for improvement in procedures, ITP, any Work Instructions etc., based on field experience.

Liaise with client for timely completion of their role in clearing any hold points, witness points so that the fabrication/contruction activity continues without any hindrance.

Study and understand the project drawings, weld maps, NDT maps.

Be familiar with Inspection requirements, NDT requirements for the project.

Be familiar with fabrication/contruction codes, acceptance criteria for visual inspection, RT, UT & MPI/DPT.

Review UT, RT, MPI/DPT and any other NDT reports and approve the same.

Ensure that all the joints marked for repair in NDT are repaired and retested in NDT as per original acceptance criteria.

Develop knowledge of welding techniques, process variables affecting weld quality and monitor in process welding.

That all touch up points marked for rectifications are attended and MPI tested.

Issue NCRs on Fabrication department when the work quality is substandard or below the required quality and ensure that the corrective action is implemented before closeout of NCR.

Understand Isometric drawings released by Outfitting Engineering for the project.

Co-ordinate with Client in inspection and testing requirements such as hydro testing, pneumatic testing, leak testing etc. cleaning, draining and completion of reporting.

Co-ordinate with Fabrication/Contruction for all inspection and testing activities.

That all the measuring tools such as pressure gauges, temperature recorders etc. as applicable are under calibrated status during inspection & testing.

Quality of medium for hydro testing / pressure testing of pipe spools and pipelines such as chloride free water for SS, Titanium testing etc.

That piping spools are adequately protected during fabrication/contruction, installation by regular monitoring.

That any deviation in the piping line are recorded and are conveyed to the client for necessary approval.

Inspection for Static Equipment include Padding, Elevation, Position, Orientation, Levelness, Pre.shaft alignment, Run-out, Void, Surveillance inspection during erection and welding of Piping, Pipe Strain, EDG/GEG run, Final shaft alignment, P&ID Verification, Lube oil Flushing Inspection, Mechanical Running test, Completion of inspection records etc.

Verification of closed punch items and conduct walk through for each completed piping system prior to mechanical acceptance.

Understand and comply with HSE regulations in the contructions. Project:

Anaerobic Reactor Project (ARP), Cakra Donya Project (CDP) & Turnaround (TAR1 & TAR2) – BP Petrochemical Indonesia – Cilegon Banten. Joint Operation Colas Rail Iroda Mitra (JO CRIM)

Period : February 2018 – December 2019.

Position : Lead QA/QC Engineer

Responsibilities:

Perform Preparing RFI (Request For Inspection) for all civil activities like Excavation, Backfilling, FDT (Field Density Test), Lean concrete, Reinforce concrete, Curing, Moisture test, Surface preparation, Concrete coating, DFT(Dry Film Thickness).

Surveillance inspection of all civil ongoing activities at project site

Witnessing of the testing of compressive strength of concrete at the third party laboratory.

Witnessing of field-testing like Compaction test FDT (Field Density Test) and Dry film thickness (DFT).

Witnessing of Laboratory test results to suit client requirements and code requirements before preparing a formal report for Flash Butt Welding (FBW) & Aluminothermic Welding

(ATW) of the Rails.

Inspection of concrete finishing according to standard and specification.

Inspection of all formwork and reinforcement steel work as per standard.

Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works

Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Coordinate with the consultant’s representative and Site Engineer for inspection and meeting about quality problems including the closure of Non-Compliance Report.

Report to the QHSE Manager, control, and monitor all activities related to Quality Management System (QMS).

Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction.

Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, mechanical, electrical and Structural discipline interfacing the multidisciplinary operations.

Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

Carry out Internal Audit at the site as scheduled in the Project Quality Plan (PQP). Project:

The Accelerated Implementation of the intergraded “Light Rail Transit (LRT)” Project Jakarta, Bogor, Depok & Bekasi (JABODEBEK) – PT. Adhi Karya (PERSERO) Tbk - Indonesia. PT. TechnipFMC Indonesia

Period : January 2016 – May 2017

Position : QC Piping Inspector

Responsibilities:

Monitoring contruction activities to ensure quality and safety standards were adheres to while achieving maximum work edeciency.

Planned work activities ensuring that isometric drawings, P&ID’s, equipment and materilas were availables to execute project in a timely manner.

Ensured that work crews were knowledgeable of work procedures and specifications.

Supervised performance of hydro-testing, piping installation in platforms, pipe racks as well as underground.

Ensure that the inspection and testing jobs are planned, executed and completed, different disciplines such as material inspection, fit-up, dimension control, welding, NDT etc.

Monitor the quality of service provided for fabrication/contruction works in terms of discipline, compliance with drawings/project specs, prompt reporting etc.

Coordinate with QA engineer for improvement in procedures, ITP, any Work Instructions etc., based on field experience.

Liaise with client for timely completion of their role in clearing any hold points, witness points so that the fabrication/contruction activity continues without any hindrance.

Study and understand the project drawings, weld maps, NDT maps.

Be familiar with Inspection requirements, NDT requirements for the project.

Be familiar with fabrication/contruction codes, acceptance criteria for visual inspection, RT, UT & MPI/DPT.

Review UT, RT, MPI/DPT and any other NDT reports and approve the same.

Ensure that all the joints marked for repair in NDT are repaired and retested in NDT as per original acceptance criteria.

Develop knowledge of welding techniques, process variables affecting weld quality and monitor in process welding.

Ensure that all touch up points marked for rectifications are attended and MPI tested.

Prepare Interim release notes for various structural, piping, pipeline & hot tap (TDW) before painting and hydro testing.

Issue NCRs on Fabrication department when the work quality is substandard or below the required quality and ensure that the corrective action is implemented before closeout of NCR.

Understand project structural, piping, pipeline and hot tap (TDW) procedures, specifications.

Maintain structural, piping, pipeline and hot tap (TDW) fit-up and traceability records.

Understand Isometric drawings released by Outfitting Engineering for the project.

Co-ordinate with Client in inspection and testing requirements such as hydro testing, pneumatic testing, leak testing etc. cleaning, draining and completion of reporting.

Co-ordinate with Fabrication/Contruction for all inspection and testing activities.

Ensure that all the measuring tools such as pressure gauges, temperature recorders etc. as applicable are under calibrated status during inspection & testing.

Ensure quality of medium for hydro testing / pressure testing of pipe spools and pipelines such as chloride free water for SS testing etc.

Ensure that piping spools are adequately protected during fabrication/contruction, installation by regular monitoring.

Ensure that any deviation in the piping line are recorded and are conveyed to the client for necessary approval.

Inspection for Static Equipment include Padding, Elevation, Position, Orientation, Levelness, Pre.shaft alignment, Run-out, Void, Surveillance inspection during erection and welding of Piping, Pipe Strain, EDG/GEG run, Final shaft alignment, P&ID Verification, Lube oil Flushing Inspection, Mechanical Running test, Completion of inspection records etc.

Verification of closed punch items and conduct walk through for each completed piping system prior to mechanical acceptance.

Understand and comply with HSE regulations in the contructions. Project:

Jangkrik Complex Project “Onshore Receiving Facilities (ORF) – ENI Muara Bakau” Handil - Balikpapan – East Borneo Indonesia.

PT. Technip Indonesia

Period : February 2015 – December 2015

Position : QA/QC Structural/Piping/Welding Inspector Responsibilities:

Ensure that the inspection and testing jobs are planned, executed and completed, different disciplines such as material inspection, fit-up, dimension control, welding, NDT etc.

Monitor the quality of service provided for fabrication/contruction works in terms of discipline, compliance with drawings/project specs, prompt reporting etc.

Coordinate with QA engineer for improvement in procedures, ITP, any Work Instructions etc., based on field experience.

Co-ordinate with welding engineer in case of abnormal defects in welding or welders’ performance and recommend corrective action when necessary.

Liaise with client for timely completion of their role in clearing any hold points, witness points so that the fabrication/contruction activity continues without any hindrance.

Monitoring welding processes of CRA Clad Pipe as per Procedure / Specifications.

Monitoring of Factory Acceptance Testing (FAT) and System Integration Testing (SIT) as per Procedure / Specifications.

Study and understand the project drawings, weld maps, NDT maps.

Be familiar with Inspection requirements, NDT requirements for the project.

Be familiar with fabrication/contruction codes, acceptance criteria for visual inspection, RT, UT & MPI/DPT.

Review UT, RT, MPI/DPT and any other NDT reports and approve the same.

Ensure that all the joints marked for repair in NDT are repaired and retested in NDT as per original acceptance criteria.

Develop knowledge of welding techniques, process variables affecting weld quality and monitor in process welding.

Ensure that all touch up points marked for rectifications are attended and MPI tested.

Prepare Interim release notes for various structures, piping before painting and hydro testing.

Issue NCRs on Fabrication department when the work quality is substandard or below the required quality and ensure that the corrective action is implemented before closeout of NCR.

Understand project structural, piping, pipeline & hot tap procedures, specifications.

Maintain structural, piping, pipeline, hot tapping fit-up and traceability records.

Understand Isometric drawings released by Outfitting Engineering for the project.

Co-ordinate with Client in inspection and testing requirements such as hydro testing, pneumatic testing, leak testing etc. cleaning, draining and completion of reporting.

Co-ordinate with Fabrication for all inspection and testing activities.

Ensure that all the measuring tools such as pressure gauges, temperature recorders etc. as applicable are under calibrated status during inspection & testing.

Ensure quality of medium for hydro testing / pressure testing of pipe spools and pipelines such as chloride free water for Cladded Pipe testing etc.

Ensure that piping spools are adequately protected during fabrication/contruction, installation by regular monitoring.

Ensure that any deviation in the piping line are recorded and are conveyed to the client for necessary approval.

Blasting and painting application techniques & process control parameters.

The use of inspection and test equipment for blasting & painting inspection

Understand and comply with HSE regulations in the yards. Project:

Bangka Subsea Installation “Bangka SIC Project – Chevron Indonesia (IDD)” Plem

(Pipeline & Manifold), Gooseneck, Wet Parking Stand, Holdback Anchor, Pig Launcher & Hang off Platform, etc.

PT. Nippon Steel and Sumikin Batam Offshore Service (NSBatam Yard) Period : September 2001 – January 2015

Position : Welding Engineer

Responsibilities:

Ensure that NSBatam has sufficient and relevant qualified welding procedures and welding Specifications and qualified welders to handle a particular job in any project.

Ensure that the new welding procedures are established satisfying the requirements of International Fabrication standards and codes such as AWS D1.1/ASME / API 1104 / API 5L / DNV Rules and others, as applicable.

Qualify sufficient number of welders to carry out a particular welding operation.

Maintain records for both welding procedure qualification and welder qualification in formats as recommended by fabrication codes.

Interpret Laboratory test results to suit client requirements and Fabrication code requirements before preparing a formal report.

Establish productivity data for different welding processes in terms of meter length of welding.

Monitor welding and welder performance for a particular job in terms of weld repair data.

Create weekly / monthly data for welding repair in structural and piping welding and present to management for review.

Suggest any remedial measures when the repair percentage is observed to be high.

Co-ordinate with QC engineer in analyzing welding defects, production weld quality records and recommend changes for improvements.

To prepare welder identification cards and ensure that welders wear them regularly for identification during surveillance.

Carry out inspection of critical consumables such as welding electrodes, wires etc. and ability to interpret the certificates against consumable specifications.

Monitor the working of baking ovens, quivers at random and report the findings to respective functions.

Liaise with Fabrication Dept. to arrange for material and others to carry out welding and welder’s tests.

Co-ordinate with Asst. welding engineer to review certificates for welding consumables to meet project specific requirements.

Issue warning letters with the approval of QHSE Dept. Manager on welders whose repair rates exceed limits.

Responsible for display of the latest and relevant WPS at work locations. Project:

Yara Pilbara Nitrates Pty Ltd / Tecnicas Reunidas “Tan Burrup Project” 132 Modules Australia.

Cuu Long Joint Operating Company “Su Tu Trang LTPTP Welhead Paltform & Pipeline”.

Total E & P Indonesie “South Mahakam (SMK) Field Development Project Phase 1 & 2

“Main Stupa (SP1), West Stupa (SP2) & East Mandu (MD1)“ Wellhead Platform.

BP (MODEC Client) and / or Its Assigns. “PSVM FPSO Project (MODEC) – Flare & Embarkation Tower, Helideck, Pipe Rack” Angola.

Premier Oil Natuna Sea B.V. “Gajah Baru Project - Wellhead Platform JKT, Deck & CPP Jacket “.

Nippon Steel Engineering “DLB Kuroshio New Deck Living Quarters Project “Ship Building & Repair.

Conoco Phillips Indonesia Inc. Ltd “North Belut Development Project “WHP-C & WHP- D Wellhead Platform.

Total E & P Indonesie “Peciko Field Development Project Phase 5 (PCK5 / EPSCI)

“Satellite Wellhead Platform SWP-F.

Total E & P Indonesie “SN1-EPSC3 Sisi Nubi Field Development Project Phase I

“MWPN, WPN2, MWPS “Wellhead Platform.

Premier Oil Natuna Sea B.V. “West Lobe Wellhead Platform Project “.

Larsen & Tourbo Ltd. (L & T) / Oil & Gas Natural Corporation (ONGC) “9 Well Platform RS-4 & RS-5 Phase 2 Project”.

Sakhalin Energy Investment Company Ltd / Nippon Steel Corporation “Tanker Loading Unit (TLU) Phase II Project “.

Total E & P Myanmar “Yadana Field Facilities WP3 & Modification WP1 Development Project “.

PCJO (Petrosea Clough Joint Operation) “APN Development Project “3 Wellhead Platform.

Larsen & Tourbo Ltd. (L & T) / Oil & Gas Natural Corporation (ONGC) “9 Well Platform ZB, RS-11 & RS-2 Phase 1 Project”.

Clough Engineering Ltd. “Bassgas Project - Yolla A Platform".

Oil & Gas Natural Corporation (ONGC) “MNW PROCESS PLATFORM” Jacket & 8 Piles.

Conoco Phillips – Technip-Coflexip “Block-B Subsea Development Project “1 Plem.

Cairn Energy India Pty Ltd" Gauri A Gas Field Development Jacket & 4 Piles.

Technip-Coflexip Ocenia Pty Ltd. "Belanak Flexible Riser Supply Project" Buoyancy Tank

- 1 Unit.

Clough Engineering LTD – Unocal 76 “West Seno Field Production Facilities – Tendon Buoyancy Modules 32 Units”.

PT. Nippon Steel Batam Offshore Service (NSBatam Yard) Period : October 1997 up to August 2001

Position : QC Material Inspector

Responsibilities:

Review and recording of Customer specific requirements for materials in each project.

Attend to material Inspection calls as and when required.

Ability to review mill certificates for various materials and tallying them against Client specific requirements before acceptance of materials.

Ability to establish the linkage between materials, their certificates and maintain records accordingly.

Apply inspection criteria for any new incoming material, which was not dealt with before by NSBatam by referring to material standard.

Train assistant inspectors (Helper) regarding job functioning and requirements.

Monitor the performance of new recruits by questioning, verifying / reviewing the records generated by them.

Get material inspected and released by Client / Third party as per project requirements and obtain approval for the same.

Raise Non Conformity report if any anomalies are found in the inspection and ensure prompt corrective action by Materials Department.

Project:

Technip-Complexip – Conoco Indonesia “ADGF Subsea Protection (ST1, ST2, ST3) 15 Plems”.

Emtunga International AB Sweden “West Seno Living Quarter”.

Conoco Indonesia "Hangtuah Modifications Project".

Conoco Indonesia – Saipem Indonesia “ADGF Project 4 Plems”.

Cairn Energy India Pty Ltd. “Lakshmi LA & LB Wellheads Platform”.

Unocal Thailand (UCU Allience) “Phase 22/5, 22/6, 22/7, 22/8 Wellheads Platform”.

Clough Offshore “Ravva - RH Wellhead Platform”.

Clough Offshore “Ravva - RA, RB, RC, RD, & RG Modifications”.

Chevron Offshore Thailand Ltd “Benchamas Waterflood - BWA & BWB Modifications”.

Total Indonesie “Peciko Phase 2 (MWP-C) Wellhead Platform.

Premier Oil Natuna Sea Ltd “Anoa Gas Export Project (AGX) Well Platform”.

Oil & Natural Gas Corporation Ltd. (ONGC) “GS-15-4 & GS-23-1“Wellheads Platform.

Pogo Producing Company “Benchamas - A, B & C “Wellheads Platform.

Pogo Producing Company “Tantawan E Wellhead Platform”.

Total Indonesie “Peciko Phase 1 (MWP- A & B) Wellheads Platform”.

Premier Oil Myanmar Exploration “ Yetagun-A Wellhead Platform”. PT. Dwi Tunggal Intisakti

Period : October 1996 – September 1997

Position : Fitter II

Project:

Tank Repair # 106 HCT Dumai (Riau) – PT. Caltex Pacific Indonesia Project.

Tank Repair # 203 CPS – HCT North Duri (Riau) - PT. Caltex Pacific Indonesia Project. Reference:

Mr. Ved Parkash (QHSE Manager PT. Nippon Steel and Sumikin Batam Offshore Service)

Email: addpd7@r.postjobfree.com

Phone: +62-811-******.

Mr. Yudhistira Utomo (QHSE Manager) PT. TechnipFMC Indonesia. Email: addpd7@r.postjobfree.com

Phone: +62-816-*******.

Mr. Yudha Nasution (QA/QC Lead Inspector) PT. Eni Muara Bakau Indonesia. Email: addpd7@r.postjobfree.com

Phone: +62-812-********.

Mr. Barry Titus (QHSE Manager) Colas Rail Asia.

Email: addpd7@r.postjobfree.com / addpd7@r.postjobfree.com

Best regards

Bambang Hermanto, ST



Contact this candidate