Timothy M. Rutledge

251-***-****

Timothy Rutledge has more than 34 years of experience as a project manager. Mr. Rutledge has an extensive background in mill and plant operations, maintenance, process engineering and project installation. He has also worked extensively as a project manager on heavy industrial projects and major capital investment.

Education

MBA in General Business, University of South Alabama; Mobile, AL

BS in Mechanical Engineering, University of South Alabama; Mobile, AL; graduated cum laude

Registrations

Registered Professional Engineer in Alabama, Mississippi, Florida, South Carolina, Georgia, Tennessee, Arkansas, and Louisiana

Experience

International Paper, Pine Hill

Project Manager

Project manager for all projects executed as part of the IP/KBR alliance. Managed multiple small projects including but not limited to the below.

Managed an upgrade to the cold blow pump and digester piping systems on two separate continuous digesters. Larger motors, pump and upgraded controls were included.

Managed installation of new and upgraded condensate dumping systems to meet a recovery boiler audit item. The new dumping system was calculated to confirm no contaminated condensate could reach the collection system and would be fully clear before reset.

Managed replacement of several bodies for two separate sets of evaporators. The bodies were nearing end of life as shown by NDT testing and the bodies were set up so that the process would call for installation of the new body and demolition of the old bodies during the year and only have tie ins made during the mill outages.

Managed upgrade and replacement of one of the major mill electrical busses. The modification required new MCC space and HVAC equipment plus major wire runs.

Managed design of new mill air dryer designed to replace multiple local units. A new structure was installed above an existing transformer yard to minimize major piping runs and provide adequate operator access. Controls and monitors were added for operator control and troubleshooting.

Managed cost and scope development for replacement of existing DC paper machine drives with new AC drives. New motors, cable runs, MCC including HVAC plant were included in the project.

Managed replacement of a debarking drum. Hydraulics and conveyor systems were modified to feed the upgraded drum.

Managed installation of a new ASB aerator anchoring system. The anchors were installed in the pond levee and made provisions for running new power cabling.

Managed project to replace black liquor mix tank and install new direct liquor heater. This project included new pumps, controls and piping modifications.

Managed a project to install an indirect black liquor heater surplused from another IP mill that was shut down. The project included supports for the heater, new piping, a new circulation pump, steam piping and controls.

Managed project to replace existing mill gas lines that were replaced due to corrosion. Included in this project was not only piping but control upgrades and flow measurements.

Managed a project to install a new Mark VI TG control package along with a new exciter and hydraulic system. This project required not only the new controls but upgrades to mill MCC to accept the new equipment and provide a proper environment.

Managed a project to replace the front stand and install a new chipper. Conveyor modifications along with new controls were installed for the new unit.

Managed several projects to upgrade mill starters and MCC to replace obsolete equipment and provide proper environmental conditions for their continued safe and reliable operation.

Managed a project to provide for new platforms and supports for caustic rail car unloading. Also provided a new foundation and containment area for a replacement sulfuric acid tank

Managed a project to replace an outdated DCS controls on the Power Boiler and associated equipment. This included replacement of the existing operator interfaces and communications to the existing controls equipment.

Managed a project to install a new DCS on a recovery boiler. The existing single loop controllers were removed and new cabling and controls were required for most operating and monitoring points on the boiler.

International Paper, Multiple Locations

Project Manager

Project manager for all projects executed as part of the IP/KBR alliance. Projects include PB TR replacements, Air Dryers, DCS replacements, PLC replacements, Indirect BL heaters, digester downflow cooking revision, winder safety systems, Lime kiln controls systems, cold blow pumping systems, refiner systems, BFW heater systems, headbox actuators, Bark burring systems, chipper system upgrades, debarking drum replacements, TG exciter and control systems.

International Paper Company, Moss Point, MS*

Power and Recovery Area Manager

Moss Point Mill—Responsibilities included day to day operations and maintenance as well as long term planning of capital and repair projects. Regulatory compliance in the area was stressed as well as maintaining high standards of safety, cost control and employee training and qualification.

International Paper Company, Moss Point, MS*

Power Group Leader, Process Engineering

Moss Point Mill—Responsibilities included process analysis and improvement studies including energy, chemical and process costs. Duties also included tracking of operational costs, justifications of improvements and modifications and daily manufacturing support.

International Paper Company, Moss Point, MS*

Foreman, Power Department

Moss Point Mill—Daily operations and maintenance coordination of ongoing operations. Technical liaison between operation departments, technical departments, vendors, staff and service groups. Shift Foreman of operating crews on relief basis. Worked strike duty as recovery and DI plant operator including training of replacement workers.

International Paper Company, Corporate Engineering, Mobile, AL*

Design Engineer, Power Department

Detailed design projects and development of detailed scope and cost estimates for the power and utilities areas of various paper mills. Worked strike duty as recovery plant operator.

Non-Metallic Resources, Mobile AL*

Engineering Manager

Responsibilities included design of piping systems including supports and installation details. Estimation of projects for bidding and troubleshooting of client issues and operational problems. Management of shop production and securing labor for field work.

International Paper Company, Camden, AR*

Led a project to develop a detailed scope and estimate for modification of two recovery boilers including replacement of walls, superheaters and other pressure parts. Structural modifications to the boiler building including new roof, walls, asbestos removal and new ventilation were included.

Boise Cascade, Jackson, AL*

Project Manager

Managed replacement of the gearing for one of the sections of an uncoated free sheet machine.

Boise Cascade Jackson, AL*

Project Manager

Managed a study and cost estimate to upgrade the ventilation in the paper machine building including addition of new fans and sealing of the building openings.

Occidental Chemical, Mobile, AL*

Project Manager

Managed a project to develop documentation for 122 relief devices including those for chlorine and other hazardous materials.

Gulf States Paper, Demopolis, AL*

Project Manager

Managed a project to convert a coal boiler to burn bark including new feed systems, ash handling system modifications, installation of new scrubbers and pollution control equipment. Also included in this project was the migration of the balance of the power boiler, turbine, BFW and condensate systems from single loop controls to DCS.

International Paper Company, Pine Hill, AL*

Project Manager

Managed recovery boiler maintenance and capital projects for every year except one since 1999 to provide capital improvements and annual maintenance projects. Capital projects include new superheater sections, wall panels, steam vent system, maintenance beams, fuel systems and other pressure parts.

International Paper Company, Pine Hill, AL*

Project Manager

Managed a project as the client’s PM to replace the hot side of a power boiler generating section. A total of 632 tubes were replaced.

Occidental Chemical, Mobile, AL*

Project Manager

Managed a project to replace the HCL feed system including new storage tanks, unloading facilities, pumping system, distribution and feed systems and controls.

Occidental Chemical, Mobile, AL*

Project Manager

Managed a project to specify and replace an ion exchange column and a new brine feed skid system. These new systems were specified and the construction package to permit the replacements during plant outages was developed.

International Paper Company, Pine Hill, AL*

Project Manager

Managed a project to provide safe loading for the paper machine floor and developed the permissible layout for storage of parent reels from the machine.

Georgia-Pacific Corporation (Formerly Smurfit Stone Container), Brewton, AL*

Project Manager

Managed a project to redirect the drainage from the ash pond, new lift pumps and other mill sewer systems to meet modified SPCC requirements. New fuel oil storage tanks, containment and pumping systems were also installed. Emergency power systems were included with the new MCCs to provide emergency power for increased reliability of the mill effluent systems.

Gulf states Corporation (RockTenn Corporation), Demopolis, AL*

Project Manager

Managed two projects to provide for additional cooling towers for the mill water system. The first phase installed the second tower cell and the final project provided for one additional cell. Both projects included new pumps, piping, controls, and basin and support structures.

Boise Cascade, Jackson, AL*

Project Manager

Managed a project to provide for a new lime mud washer. The new washer was installed such that only tie ins had to be made during a mill outage allowing the new system to be placed in service when the mill came back up.

Boise Cascade, Jackson, AL*

Project Manager

Managed a study to modify the white water system throughout the mill. The purpose was to maximize white water use and to minimize fresh water make up. Modifications to the existing system including new tankage, pumps, controls and piping to redirect the white water balance and utilization.

Boise Cascade, Jackson, AL*

Project Manager

Managed a project to replace the white liquor clarifier. The study phase of the project looked at means to reduce the total downtime for the mill including building the new vessel at a remote location and moving it whole to the existing site.

RockTenn Corporation, Demopolis, AL*

Project Manager

Managed a project to install a used cutter layboy for use on a pulp machine. Engineering included the structural modifications required but also new controls and MCCs to handle the new system.

Georgia-Pacific, New Augusta, MS*

Project Manager

Managed two phases of a project to permit the mill to produce fluff pulp. New equipment installed in the first phase included a new headbox, new pulper (including excavation of a new pulper pit, new winder, roll handling plus controls and utilities for the new system. The existing bale line was relocated to a new building to the side of the original building to permit the pulp drier to continue operation while the fluff equipment was being installed. The second phase of this project installed additional roll handling, roll wrap and conveying systems.

RockTenn Corporation, Demopolis, AL*

Project Manager

Managed a project to provide No. 5 fuel oil for the lime kiln in place of natural gas. The new system included burner and control modifications, new tankage, unloading systems, containment and drainage systems, pumping, and piping and utilizes system.

Occidental Chemical Corporation, Mobile, AL*

Project Manager

Managed a project to install a new brine filter system. The new system included new controls, pressure vessels, regeneration systems, pumping, piping and controls.

BP Corporation, Pascagoula, MS*

Project Manager

Managed a project to develop a cost and estimate for an alternate sales outlet for NGL liquids. In response to the problems caused by Hurricane Katrina to various pipelines and the interruption this caused to GOM oil production, a study was undertaken to provide for a new storage sphere, new railroad and truck loading systems and utilities and controls to provide maximum flexibility to maintain natural gas processing.

Lenzing Fibers, Axis, AL*

Project Manager

Managed a project to install a new WESP system on an existing fiber line. The project included new controls, utility and structural systems.

RockTenn Corporation, Demopolis, AL*

Project Manager

Managed a project to provide for a new control room, rack room and office building for the board machine area. The new building was installed and various projects took responsibility to relocate various systems to the new area over time.

Boise Cascade, Jackson, AL*

Project Manager

Managed a project to provide for the installation of a new sheeter line at the converting facility. The new sheeter was relocated from a facility that was shut down and the engineering challenges including determination of the actual requirements, orientation, dimensions and control points for existing equipment with the existing documentation that was available. Much time was spent in field investigation and field engineering to facilitate installation when data was not available before the equipment showed up on site.

Lenzing Fibers, Axis, AL*

Project Manager

Managed a project to provide engineering for restart of an idled fiber line in an existing facility. Using a combination of both in plant and office engineering staffs, engineering design packages were developed to have existing equipment inspected and restored and then new equipment installed as required. Much of the work was based upon field work and development of the scopes of work based upon field investigations. A new WESP system and emissions stack that was called for by NAAQS requirements was installed.

Boise Cascade Jackson, AL*

Project Manager

Managed a project to provide for a new 30 million GPD raw water clarifier including a new clearwell, pumping systems, fire systems, sand filters and chemical feed systems.