Post Job Free

Resume

Sign in

Power Plant Mechanical Engineer

Location:
Malang, East Java, Indonesia
Salary:
10000000
Posted:
June 08, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL IDENTITY

Name : Muhammad Taufik

Place/Birthday : Balikpapan / 01 January 1976

Gender : Male

Status : Married

Religion : Moslem

Citizenship : Indonesian

Address : Perumahan Patraland Place Blok B3-5 Tasikmadu Lowokwaru Malang

Email Address : addopo@r.postjobfree.com

HP : +62-813********, +62-812********

EDUCATION BACKGROUND

1999 – 2000 Politeknik Perkapalan ITS Surabaya as Diploma 1 Industrial Electronic

1994 – 1998 Institut Teknologi Nasional Malang as Mechanical Engineering

1991 – 1994 Senior High School SMAN 1 Balikpapan

1988 – 1991 Junior High School SMP 1 Balikpapan

1982 – 1988 Elementary School SDN 004 Balikpapan

TRAINING AND COURSES

2014

Principle of Business Conduct at PT. Freeport Indonesia

UG Annual Refresher at PT. Freeport Indonesia

Underground Annual SHE Refresher at PT. Freeport Indonesia

Arc-Flash Awareness at PT. Freeport Indonesia

Electrocution (Elec Awareness) at PT. Freeport Indonesia

2013

Electical Control and Industrial Automation at Alfan Electronic

UG Incident Start Up at PT. Freeport Indonesia

LOTO Refresher at Pt. Freeport Indonesia

Principles of Business Conduct at PT. Freeport Indonesia

UG Annual Refresher at PT. Freeport Indonesia

Underground Annual SHE Refresher at PT. Freeport Indonesia

Fatality Prevention Program at PT. Freeport Indonesia

Awarness to OHSAS at PT. Freeport Indonesia

2012

Awarness to OHSAS at PT. Freeport Indonesia

Incident Investigation at PT. Freeport Indonesia

Planned JOB Observation at PT. Freeport Indonesia

Electrical & Machinery Safety at PT. Freeport Indonesia

FRESH at PT. Freeport Indonesia

JOB Safety Analysis at PT. Freeport Indonesia

HIRADC Staff at PT. Freeport Indonesia

Loss Causa Mdl & Nearmiss Rpt at PT. Freeport Indonesia

Finger Injury Prevention at PT. Freeport Indonesia

Working at Heights at Pt. Freeport Indonesia

First Aid & CPR at Pt. Freeport Indonesia

Safety Induction UG Mine at PT. Freeport Indonesia

SHE Induction Admin & Industrial at PT. Freeport Indonesia

2011

Toward Harmony at Workplace at PT. Freeport Indonesia

Awarness to OHSAS 18001 at PT. Freeport Indonesia

MASTER Observation Program at PT. Freeport Indonesia

Fatigue Management at PT. Freeport Indonesia

2005

CNC Training at BLKI Singosari Malang

2002

Diesel Motor Training for basic mechanic at PT. Boma Bisma Indra Surabaya

2001

English Profiency Test Score at BIEC Balikpapan (TOEFL Prediction Score 413)

1998

Autocad 2D & 3D Course at Wearness Education Centre Malang

1997

On Job Training at Unocal Indonesia Company Balikpapan

1996

English Course at Business Training Centre Malang

WORKING EXPERIENCES

2016 - 2017

Company Name : PT. Waspada Karsa

(PT. Freeport Indonesia Start Up & Commissioning)

Address : Jakarta/Tembagapura-Papua

Business Line : Manpower/Mining

Position : Mechanical Commissioning Engineering

Job Description :

To making schedule of Precommissioning and Commissioning

Clarify installation piping and mechanical drawing project at field

Clarify filed testing piping and mechanical work

Check and testing the pump, motor, compressor, conveyor system, over head crane, gear box, hydraulic and pneumatic etc before do start up and commissioning

Check the field condition to ensure the project drawings are matching with the actual field condition and specification including P&ID diagram

Doing test equipment and system at project as vibration test, temperature test, alignment, megger test, continuity, etc

Doing start up and commissioning and analyze project operable and safe able

Organize and perform field inspection for start up and commissioning to ensure the construction work comply with functional scope is operable

Coordinate with construction and QC department as per project to completed mechanical completion before do start up and commissioning

Collect report and check list as per project and documentation to hand

2011 – 2016

Company Name : PT. Inamco Varia Jasa

(PT. Freeport Indonesia Start Up & Commissioning)

Address : Jakarta/Tembagapura-Papua

Business Line : Manpower/Mining

Position : Mechanical Commissioning Engineering

Job Description :

To making schedule of Precommissioning and Commissioning

Clarify installation piping and mechanical drawing project at field

Clarify filed testing piping and mechanical work

Check and testing the pump, motor, compressor, conveyor system, over head crane, gear box, hydraulic and pneumatic etc before do start up and commissioning

Check the field condition to ensure the project drawings are matching with the actual field condition and specification including P&ID diagram

Doing test equipment and system at project as vibration test, temperature test, alignment, megger test, continuity, etc

Doing start up and commissioning and analyze project operable and safe able

Organize and perform field inspection for start up and commissioning to ensure the construction work comply with functional scope is operable

Coordinate with construction and QC department as per project to completed mechanical completion before do start up and commissioning

Collect report and check list as per project and documentation to hand over

2010,

Company Name : PT. Lawangmas Primapack Indonesia

Address : Randu Agung Industrial Park, Malang

Business Line : Packaging and Printing

Position : Production Leader (Blown Film Department)

Job Description :

To making, controlling, coordinating and ensuring production process

Production plan based on target plan

Control and monitor product and materials inventories

Coordinate with relevant departments for production planning

Active in making continues improvements in internal

Ensure planning is align with the schedule and on time delivery

2002 – 2009,

Company Name : PT. Usaha Teknik Grafika

Address : Malang

Business Line : Rubber Rollers and Technical Goods

Position : Production Assistant Manager

Jos Description :

To ensure that material needs are in accordance with the purchase order

Making drawing work for operator

Schedulling for CNC running and production

Coordinate with relevant departments for production planning

Control and monitor product and materials inventories

Ensure planning is align with the schedule and on time delivery

Making, controlling, coordinating and ensuring production process

2001 – 2002,

Company Name : PT. Pinaras Raya Abadi

Addres : Balikpapan

Business Line : Contractor – Supplier – Engineering

Position : Site Coordination and Draftman

Job Description :

As Site Coordinator

To controlling, coordinating and ensure drawing project as Alih Media Drawing

Coordinate for draftman task as skill person

Making progress report for project and ensure that align with the schedule

To assist the project manager in any kind report to getting assign report progress from a few manager department in Pertamina UP-V Balikpapan

As Draftman

To assist drawing for Alih Media Drawing Project

2001,

Company Name : PT. Kaltimex Energy

Address : Batakan – Balikpapan

Business Line : Power Plant

Position : Mechanical Supervisor

Job Description :

To scheduling maintenance preventive

Operation and overhaul Cummins Genset

Trainee to fill Sampit station

EXPERIENCES/PROJECT INVOLVED

List of Project Involved (As Mechanical Commissioning Engineering)

2017, RIDGE CAMP SUPERBLOCK

COMPRESSOR ROOM

Inspection evaporator, condenser

Inspection line and connection system

Testing compressor performance and balancing test

EXHAUST AND SUPPLY FAN

Inspection ducting line and connection

Inspection motor rotation

Inspection grill and diffuser

Testing motor fan

2016, OVER HEAD CRANE LINTECH 80/20 MT GBC CRUSHER 601

Inspection rail and rail clip

Inspection plumb and level of coloum

Load test crane with available load 125% SWL

Inspection girder surfaces and welded

Inspection and testing cross and traveling movement

Inspection and testing torque bolt as requirement

Inspection motor carried and hoist

Check oil level and specification as requirement

Check motor ampere

Testing pendant function

Testing brake hoist function

NDT and penetrant test hoist for crack

Load test at maximum load 125% SWL for deflection of girder

DMLZ FIX FACILITY UPPER & LOWER

FUEL BAY STATION

Inspection gun and hose rail

Inspection fuel metering

Inspection fuel filter

Inspection pipeline and leaking

Testing high and low level tank alarm

Testing fuel motor pump

Testing diffrensial pressure fuel motor pump

FAN DUCTING

Inspection motor fan

Inspection ducting connection

Testing fan flow

Testing fan vibration

CIP FUEL STATION

Inspection pipeline and connection

Inspection fuel motor pump

Inspection tightening bolt as requirement

Inspection fuel filter

Inspection gun and hose rail

Testing fuel motor pump

Testing high and low level tank

Testing diffrensial pressure fuel motor pump

Testing motorize valve open and close

Testing pressure relieve valve

GBC MAIN FAN 3 HOWDEN

Inspection shaft level

Inspection coupling alignment to shaft motor (Rotalign Ultra)

Inspection bolt connection and tightening torque as requirement

Inspection impeller clearance and run out

Inspection fan casing and radial vane control

Inspection parking brake and pin lock

Inspection discharge evasee and self closing doors

Inspection grouting and pedestal

Check oil level shaft bearing and spesification as requirement

Check air pressure and air flow measurement

Check motor lubrication, RTD connection

Solo run motor

Check motor vibration and temperature

Check motor ampere

Dry and Wet test commissioning

Check fan bearing vibration and temperature

OVER HEAD CRANE LINTECH 30/5 MT GBC CONVEYOR 601

Inspection rail and rail clip

Inspection plumb and level of coloum

Load test crane with available load 125% SWL

Inspection girder surfaces and welded

Inspection and testing cross and traveling movement

Inspection and testing torque bolt as requirement

Inspection motor carried and hoist

Check oil level and specification as requirement

Check motor ampere

Testing pendant function

Testing brake hoist function

NDT and penetrant test hoist for crack

Load test at maximum load 125% SWL for deflection of girder

2015, DMLZ CONVEYOR 514,512,511,510,508

Inspection and testing svendborg break and hydraulic unit

Inspection roller conveyor, modul square, belt tension, tracking belt, chute, scrapper etc

Inspection and testing motor drive (Toshiba, WEG, Hyundai), gearbox reducer (FALK Gearbox)

Testing pullcord, pullswitch, missalignment, belt rip, carryback sensor, tilt switch etc

Inspection and record vibration motor drive bearing, pulley bearing with vibration analyzer

Inspection pipeline installation according to P&ID diagram

Inspection gear reducer assembly

Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk

Inspection steelflex grid coupling and installation

Inspection conveyor

Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame

Inspection motor lubrication, RTD connection

Testing motor rotation direction

Inspection head and tail pulley lagging surface and bearing lubrication

Inspection discharge chute liner and bolt liner

Inspection curve chute liner and bolt liner, skirting rubber and elevation

Inspection primary, secondary, tertiary scrapper installation

Inspection v-flow blade bolt and surface of rubber curtain

Inspection tightening bolt as requirement

Inspection coupling alignment (Rotalign Ultra)

Inspection oil level and specification requirement

Solo run motor

Check motor vibration and temperature

Check motor ampere

AGGREGATE PLANT MP72

Inspection roller conveyor, modul square, belt tension, tracking belt, chute, scrapper etc

Inspection and testing Metso Jaw crusher C116

Inspection and testing hydraulic unit Metso Jaw crusher

Inspection and testing motor vibrator, counterweight vibrator of grizzily feeder

Setting gap moveable jaw crusher

Inspection and testing belt magnet

Inspection and testing Metso Cone crusher Nordberg

Inspection and testing lube and hydraulic system of Metso Cone crusher

Inspection hose connection, hose pressure and leakage

Setting gap adjusment ring

Inspection and testing hydraulic tramp release cylinder

Inspection and testing Metso Barmarg Crusher

Setting plate feeder tube, hydraulic gate, cascade, rotor feed

Solo run motor

Check motor vibration and temperature

Check motor ampere

2014, GBC VENTILATION DOOR INTAKE-6 (HYDRAULIC DIRECT MINING)

Inspection powerpack installation according to schematic diagram

Inspection hose working pressure, hose connection, hose layout, couplers connection

Inspection hydraulic cylinder, rod cylinder

Inspection and testing motor rotation direction

Inspection motor lubrication

Inspection hose line to rotary divider according inlet and outlet line

Inspection accumulator safety block

Inspection and testing bleeding hose and cylinder to make sure no air trap at line

Check oil level and specification as requirement

Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly

Inspection and testing door operation open and close and interlocking

APRON FEEDER CONVEYOR 508

Inspection motor lubrication

Inspection coupling alignment to motor shaft

Inspection grid coupling installation

Inspection chain bolt connection to flight

Inspection clearance flights to bump rail

Inspection sprockets, carry rollers, return rollers, flights, chains

Inspecton bearing lubrication head and tail shaft

Solo run motor

Dry test commissioning

Check motor vibration and temperature

Check head and tail shaft bearing temperature

LOAD TEST LINTECH BRIDGE CRANE 35/5 T

DMLZ CONVEYOR 511 MID DRIVE AREA

Inspection girder surfaces and welded

Inspection and testing cross and traveling movement

Inspection and testing torque bolt as requirement

Inspection motor carried and hoist

Check oil level and specification as requirement

Check motor ampere

Testing pendant function

Testing brake hoist function

NDT and penetrant test hoist for crack

Load test at maximum load 125% SWL for deflection of girder

DMLZ CRUSHER 503

Inspection motor crusher lubrication and RTD connection

Testing motor crusher rotation direction

Solo run motor crusher

Check motor crusher vibration and temperature

Check motor crusher ampere

Inspection oil circulation lubrication and hydraulic unit

Check pipeline according to P&ID diagram, oil filter, oil tank, oil level, oil temperature, oil pressure, breather, flow meter, directional control valve, motor rotation direction,

Inspection hydraulic cylinder and balancing unit

Bleeding air at balancing unit, check leakage, check pressure balance unit

Inspection spider fixing unit

Check oil level and specification as requirement, testing working pressure requirement, check working pressure hose, hose leakage, power pack unit

Inspection spider grease system

Check lubrication level and specification as requirement, testing motor rotation direction, check hose leakage

Inspection oil level of pinion gear, temperature sensor

Inspection bolt connection and tightening bolt as requirement

Inspection liner surface and bolt connection

Testing lifting up the main shaft and setting the maximum and minimum movement of main shaft

Inspection cooling fan motor, flange connection

ROCK BREAKER DMLZ CRUSHER 503

Check hoseline according to schematic diagram

Inspection boom cylinder, pivot cylinder, jib cylinder, pivot jib, pivot hammer

Inspection slew boom tightening bolt as requirement

Inspection hose connection and leakage

Inspection working pressure hoses as requirement

Inspection grease pump system and testing the motor grease rotation direction

Check grease level and specification as requirement

Check hammer grease pump and grease level

Check oil level and specification as requirement of Hydraulic Power Unit

Inspection motor HPU lubrication

Testing motor HPU rotation direction

Solo run motor

Check motor HPU vibration and temperature

Check motor HPU ampere

Testing rockbreaker movement

Testing hammer pressure

LOAD TEST LINTECH BRIDGE CRANE 30/5 T

DMLZ CONVEYOR 514 TAIL AREA

Inspection girder surfaces and welded

Inspection and testing cross and traveling movement

Inspection and testing torque bolt as requirement

Inspection motor carried and hoist

Check oil level and specification as requirement

Check motor ampere

Testing pendant function

Testing brake hoist function

NDT and penetrant test hoist for crack

Load test at maximum load 125% SWL for deflection of girder

DMLZ CONVEYOR 514

Inspection pipeline installation according to P&ID diagram

Inspection gear reducer assembly

Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk

Inspection steelflex grid coupling and installation

Inspection conveyor

Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame

Inspection motor lubrication, RTD connection

Testing motor rotation direction

Inspection head and tail pulley lagging surface and bearing lubrication

Inspection discharge chute liner and bolt liner

Inspection curve chute liner and bolt liner, skirting rubber and elevation

Inspection primary, secondary, tertiary scrapper installation

Inspection v-flow blade bolt and surface of rubber curtain

Inspection tightening bolt as requirement

Inspection coupling alignment (RotalignUltra)

Inspection oil level and specification requirement

Solo run motor

Check motor vibration and temperature

Check motor ampere

GBC FAN-2 (HOWDEN)

Inspection shaft level

Inspection coupling alignment to shaft motor (Rotalign Ultra)

Inspection bolt connection and tightening torque as requirement

Inspection impeller clearance and run out

Inspection fan casing and radial vane control

Inspection parking brake and pin lock

Inspection discharge evasee and self closing doors

Inspection grouting and pedestal

Check oil level shaft bearing and spesification as requirement

Check air pressure and air flow measurement

Check motor lubrication, RTD connection

Solo run motor

Check motor vibration and temperature

Check motor ampere

Dry and Wet test commissioning

Check fan bearing vibration and temperature

UPGRADE CYCLONE PUMP 2PC-8842 (NSGC MILLS 10&11)

Inspection motor skid

Inspection motor lubrication and RTD connection

Testing motor rotation direction

Solo run motor

Check motor vibration and temperature

Check motor ampere

Testing motor VFD

Inspection alignment pump to motor

Inspection sheave motor and sheave bearing housing

Inspection belt tension and belt surface from damage

Inspection bolt and flange connection

Inspection bearing housing

Inspection pump, mechanical seal, cooling water

Check oil level of bearing housing and specification as requirement

Check bearing temperature

Dry and wet test commissioning cyclone pump

GBC BATCHING PLANT 2830

Inspection and testing rollmaster mixer

Inspection and testing screw conveyor

Inspection silo cemen and testing the level of cement

Inspection and testing water meter an d admixture scale

Inspection and testing dust collector

Inspection and testing fiber dispencer

Inspection buffer hopper, receiver hopper bolt connection, air vibrator

Inspection and testing stacker conveyor

Inspection and testing aggregate conveyor

Inspection motor lubrication, motor rotation direction, solo run motor, check motor vibration and temperature

2013, UPGRADE CYCLONE PUMP 2PC-9201

Inspection motor skid

Inspection motor lubrication and RTD connection

Testing motor rotation direction

Solo run motor

Check motor vibration and temperature

Check motor ampere

Testing motor VFD

Inspection alignment pump to motor

Inspection sheave motor and sheave bearing housing

Inspection belt tension and belt surface from damage

Inspection bolt and flange connection

Inspection bearing housing

Inspection pump, mechanical seal, cooling water

Check oil level of bearing housing and specification as requirement

Check bearing temperature

Dry and wet test commissioning cyclone pump

UPGRADE CYCLONE PUMP 2PC-9202

Inspection motor skid

Inspection motor lubrication and RTD connection

Testing motor rotation direction

Solo run motor

Check motor vibration and temperature

Check motor ampere

Testing motor VFD

Inspection alignment pump to motor

Inspection sheave motor and sheave bearing housing

Inspection belt tension and belt surface from damage

Inspection bolt and flange connection

Inspection bearing housing

Inspection pump, mechanical seal, cooling water

Check oil level of bearing housing and specification as requirement

Check bearing temperature

Dry and wet test commissioning cyclone pump

GBC VENTILATION DOOR GVD-3 XC-6 (HYDRAULIC DIRECT MINING)

Inspection powerpack installation according to schematic diagram

Inspection hose working pressure, hose connection, hose layout, coupler connection

Inspection hydraulic cylinder, rod cylinder

Inspection and testing motor rotation direction

Inspection motor lubrication

Inspection hose line to rotary divider according inlet and outlet line

Inspection accumulator safety block

Inspection and testing bleeding hose and cylinder make sure no air trap at line

Check oil level and specification as requirement

Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly

Inspection and testing door operation open and close and interlocking

NORTH SOUTH GRAVITY CONCENTRATOR MILLS 10&11

Inspection and testing concentrate tank

Inspection and testing concentrate transfer pump

Inspection and testing concentrator feed screen

Inspection and testing knelson concentrator

Check pipeline according to P&ID drawing

Inspection motor lubrication

Inspection alignment motor to pump

Inspection belt tension, sheave pulley

Inspection HDPE line and pipeline leakage

Solo run motor

Check motor vibration and temperature

Testing motor VFD

FUEL STATION RELOCATION MP66

Check pipeline according to P&ID diagram

Inspection filter element

Inspection motor lubrication

Inspection alignment motor to pump

Testing and measuring fuel flow

Inspection pipeline leakage

CIP RUBBER TIRE MAINTENANCE SHOP

Inspection and load test Crane Demag Double Girder ZKKE 50T

Inspection and testing motor and air pump fuel tank

Inspection and testing motor and air pump lube tank

Inspection and testing Compressor Ingersoll Rand

Check pipeline installation according to P&ID diagram

Inspection and flushing fuel and lube line

Inspection pipeline leakage

Inspection and testing solenoid valve air pump

Setting regulator pressure fuel,lube and grease air pump according to working pressure as requirement

Inspection and testing motor and pump grease golden bag

GBC VENTILATION DOOR NED-5 XC-9 (AIRLOCK DOOR)

Inspection hose installation according to P&ID diagram

Inspection hose working pressure, hose connection, hose layout, flow meter

Inspection Air pressure unit system and tubing connection

Setting pressure regulator according to working pressure requirement

Inspection air cylinder, rod cylinder

Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly

Inspection and testing door operation open and close and interlocking

HVAC POWER PLANT-C

Check ducting installation according to drawing

Inspection ducting insulation

Inspection ducting bolt and connection

Inspection damper and fire smoke damper

Check freon level and spesification as requirement

Inspection and testing semi hermetic compressor

Inspection tubing connection and leakage

Inspection and testing motor blower, filter, evaporator, condensor, blower fan of Air Handling Unit

2012, HVAC AMOLE SUBSTATION

Check ducting installation according to drawing

Inspection ducting insulation

Inspection ducting bolt and connection

Inspection damper and fire smoke damper

Check freon level and spesification as requirement

Inspection and testing semi hermetic compressor

Inspection tubing connection and leakage

Inspection and testing motor blower, filter, evaporator, condensor, blower fan of Air Handling Unit

GBC VENTILATION DOOR GVD 5-6 (AIRLOCK DOOR)

Inspection hose installation according to P&ID diagram

Inspection hose working pressure, hose connection, hose layout, flow meter

Inspection Air pressure unit system and tubing connection

Setting pressure regulator according to working pressure requirement

Inspection air cylinder, rod cylinder

Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly

Inspection and testing door operation open and close and interlocking

WDD PORTAL (HEAD ROAD)

Inspection pipeline installation according to P&ID diagram

Inspection pipeline chain and support

Inspection HDPE working pressure specification

Inspection bolt support

Inspection valve, flange, elbow, pressure gauge, pressure switch

Inspection HDPE leakage

Check flow meter

GRASSHOPPER GHX-211 (LOWER WANAGON)

Inspection gear reducer assembly

Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk

Inspection drive assembly

Fluid coupling, filler and drain plug fluid coupling, floating shaft, back stop, high speed coupling, gear reducer

Inspection conveyor

Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame

Inspection motor lubrication, RTD connection

Testing motor rotation direction

Inspection head and tail pulley lagging surface and bearing lubrication

Inspection discharge chute liner and bolt liner

Inspection curve chute liner and bolt liner, skirting rubber and elevation

Inspection precleaner and cleaner

Inspection v-flow blade bolt and surface of rubber curtain

Inspection rock diverter bolt and surface of rubber and plate

Inspection tightening bolt as requirement

Inspection coupling alignment (RotalignUltra)

Inspection oil level and specification requirement

Solo run motor

Check motor vibration and temperature

Check motor ampere

Dry test and wet test commissioning conveyor

INSTALL TEST CHAIN CONVEYOR GRS-51

Modify roller chain box

Modify servo and liveshaft roller

Inspection motor drive and setting brake

Check motor ampere

Check chain and bolt connection

Check chain roller position at weight scale

INSTALL TEST CHAIN CONVEYOR GRS-62

Modify roller chain box

Modify servo and liveshaft roller

Inspection motor drive and setting brake

Check motor ampere

Check chain and bolt connection

Check chain roller position at weight scale

DMLZ FAN-2 (HOWDEN)

Inspection shaft level

Inspection coupling alignment to shaft motor (Rotalign Ultra)

Inspection bolt connection and tightening torque as requirement

Inspection impeller clearance and run out

Inspection fan casing and radial vane control

Inspection parking brake and pin lock

Inspection discharge evasee and self closing doors

Inspection grouting and pedestal

Check oil level shaft bearing and spesification as requirement

Check air pressure and air flow measurement

Check motor lubrication, RTD connection

Solo run motor

Check motor vibration and temperature

Check motor ampere

Dry and Wet test commissioning

Check fan bearing vibration and temperature

DMLZ COMPRESSOR 2520 (ATLAS COPCO-ZR-750)

Inspection air filter

Inspection oil level, oil filter and oil pump of compressor

Inspection pipeline installation according to P&ID diagram

Inspection valve, flange, elbow, pressure gate

Inspection cooling and air system, intercooler, aftercooler, water separator

Inspection air receiver tank and electronic water drain

Inspection of compressor as low pressure, high pressure

Inspection safety valve according to setting pressure

Inspection of silencer

Check rotation direction of motor, temperature bearing and vibration

Check motor ampere

Dry and wet commissionig compressor

Inspection motor and cooling pump

BIGGOSSAN COMPRESSOR 2800 (ATLAS COPCO ZR-750)

Inspection air filter

Inspection oil level, oil filter and oil pump of compressor

Inspection pipeline installation according to P&ID diagram

Inspection valve, flange, elbow, pressure gate

Inspection cooling and air system, intercooler, aftercooler, water separator

Inspection air receiver tank and electronic water drain

Inspection of compressor as low pressure, high pressure

Inspection safety valve according to setting pressure

Inspection of silencer

Check rotation direction of motor, temperature bearing and vibration

Check motor ampere

Dry and wet testing compressor

Inspection motor and cooling pump

LIVE HOPPER BALL MILL 74

Inspection inflatable liners connection

Inspection inflatable leakage

Inspection inflatable buble

Inspection all cover liners

Inspection liner bolt and torque as requirement

Testing inflatable movement

2011, GBC FAN-1 (HOWDEN)

Inspection shaft level

Inspection coupling alignment to shaft motor (Rotalign Ultra)

Inspection bolt connection and tightening torque as requirement

Inspection impeller clearance and run out

Inspection fan casing and radial vane control

Inspection parking brake and pin lock

Inspection



Contact this candidate