CURRICULUM VITAE
PERSONAL IDENTITY
Name : Muhammad Taufik
Place/Birthday : Balikpapan / 01 January 1976
Gender : Male
Status : Married
Religion : Moslem
Citizenship : Indonesian
Address : Perumahan Patraland Place Blok B3-5 Tasikmadu Lowokwaru Malang
Email Address : addopo@r.postjobfree.com
HP : +62-813********, +62-812********
EDUCATION BACKGROUND
1999 – 2000 Politeknik Perkapalan ITS Surabaya as Diploma 1 Industrial Electronic
1994 – 1998 Institut Teknologi Nasional Malang as Mechanical Engineering
1991 – 1994 Senior High School SMAN 1 Balikpapan
1988 – 1991 Junior High School SMP 1 Balikpapan
1982 – 1988 Elementary School SDN 004 Balikpapan
TRAINING AND COURSES
2014
Principle of Business Conduct at PT. Freeport Indonesia
UG Annual Refresher at PT. Freeport Indonesia
Underground Annual SHE Refresher at PT. Freeport Indonesia
Arc-Flash Awareness at PT. Freeport Indonesia
Electrocution (Elec Awareness) at PT. Freeport Indonesia
2013
Electical Control and Industrial Automation at Alfan Electronic
UG Incident Start Up at PT. Freeport Indonesia
LOTO Refresher at Pt. Freeport Indonesia
Principles of Business Conduct at PT. Freeport Indonesia
UG Annual Refresher at PT. Freeport Indonesia
Underground Annual SHE Refresher at PT. Freeport Indonesia
Fatality Prevention Program at PT. Freeport Indonesia
Awarness to OHSAS at PT. Freeport Indonesia
2012
Awarness to OHSAS at PT. Freeport Indonesia
Incident Investigation at PT. Freeport Indonesia
Planned JOB Observation at PT. Freeport Indonesia
Electrical & Machinery Safety at PT. Freeport Indonesia
FRESH at PT. Freeport Indonesia
JOB Safety Analysis at PT. Freeport Indonesia
HIRADC Staff at PT. Freeport Indonesia
Loss Causa Mdl & Nearmiss Rpt at PT. Freeport Indonesia
Finger Injury Prevention at PT. Freeport Indonesia
Working at Heights at Pt. Freeport Indonesia
First Aid & CPR at Pt. Freeport Indonesia
Safety Induction UG Mine at PT. Freeport Indonesia
SHE Induction Admin & Industrial at PT. Freeport Indonesia
2011
Toward Harmony at Workplace at PT. Freeport Indonesia
Awarness to OHSAS 18001 at PT. Freeport Indonesia
MASTER Observation Program at PT. Freeport Indonesia
Fatigue Management at PT. Freeport Indonesia
2005
CNC Training at BLKI Singosari Malang
2002
Diesel Motor Training for basic mechanic at PT. Boma Bisma Indra Surabaya
2001
English Profiency Test Score at BIEC Balikpapan (TOEFL Prediction Score 413)
1998
Autocad 2D & 3D Course at Wearness Education Centre Malang
1997
On Job Training at Unocal Indonesia Company Balikpapan
1996
English Course at Business Training Centre Malang
WORKING EXPERIENCES
2016 - 2017
Company Name : PT. Waspada Karsa
(PT. Freeport Indonesia Start Up & Commissioning)
Address : Jakarta/Tembagapura-Papua
Business Line : Manpower/Mining
Position : Mechanical Commissioning Engineering
Job Description :
To making schedule of Precommissioning and Commissioning
Clarify installation piping and mechanical drawing project at field
Clarify filed testing piping and mechanical work
Check and testing the pump, motor, compressor, conveyor system, over head crane, gear box, hydraulic and pneumatic etc before do start up and commissioning
Check the field condition to ensure the project drawings are matching with the actual field condition and specification including P&ID diagram
Doing test equipment and system at project as vibration test, temperature test, alignment, megger test, continuity, etc
Doing start up and commissioning and analyze project operable and safe able
Organize and perform field inspection for start up and commissioning to ensure the construction work comply with functional scope is operable
Coordinate with construction and QC department as per project to completed mechanical completion before do start up and commissioning
Collect report and check list as per project and documentation to hand
2011 – 2016
Company Name : PT. Inamco Varia Jasa
(PT. Freeport Indonesia Start Up & Commissioning)
Address : Jakarta/Tembagapura-Papua
Business Line : Manpower/Mining
Position : Mechanical Commissioning Engineering
Job Description :
To making schedule of Precommissioning and Commissioning
Clarify installation piping and mechanical drawing project at field
Clarify filed testing piping and mechanical work
Check and testing the pump, motor, compressor, conveyor system, over head crane, gear box, hydraulic and pneumatic etc before do start up and commissioning
Check the field condition to ensure the project drawings are matching with the actual field condition and specification including P&ID diagram
Doing test equipment and system at project as vibration test, temperature test, alignment, megger test, continuity, etc
Doing start up and commissioning and analyze project operable and safe able
Organize and perform field inspection for start up and commissioning to ensure the construction work comply with functional scope is operable
Coordinate with construction and QC department as per project to completed mechanical completion before do start up and commissioning
Collect report and check list as per project and documentation to hand over
2010,
Company Name : PT. Lawangmas Primapack Indonesia
Address : Randu Agung Industrial Park, Malang
Business Line : Packaging and Printing
Position : Production Leader (Blown Film Department)
Job Description :
To making, controlling, coordinating and ensuring production process
Production plan based on target plan
Control and monitor product and materials inventories
Coordinate with relevant departments for production planning
Active in making continues improvements in internal
Ensure planning is align with the schedule and on time delivery
2002 – 2009,
Company Name : PT. Usaha Teknik Grafika
Address : Malang
Business Line : Rubber Rollers and Technical Goods
Position : Production Assistant Manager
Jos Description :
To ensure that material needs are in accordance with the purchase order
Making drawing work for operator
Schedulling for CNC running and production
Coordinate with relevant departments for production planning
Control and monitor product and materials inventories
Ensure planning is align with the schedule and on time delivery
Making, controlling, coordinating and ensuring production process
2001 – 2002,
Company Name : PT. Pinaras Raya Abadi
Addres : Balikpapan
Business Line : Contractor – Supplier – Engineering
Position : Site Coordination and Draftman
Job Description :
As Site Coordinator
To controlling, coordinating and ensure drawing project as Alih Media Drawing
Coordinate for draftman task as skill person
Making progress report for project and ensure that align with the schedule
To assist the project manager in any kind report to getting assign report progress from a few manager department in Pertamina UP-V Balikpapan
As Draftman
To assist drawing for Alih Media Drawing Project
2001,
Company Name : PT. Kaltimex Energy
Address : Batakan – Balikpapan
Business Line : Power Plant
Position : Mechanical Supervisor
Job Description :
To scheduling maintenance preventive
Operation and overhaul Cummins Genset
Trainee to fill Sampit station
EXPERIENCES/PROJECT INVOLVED
List of Project Involved (As Mechanical Commissioning Engineering)
2017, RIDGE CAMP SUPERBLOCK
COMPRESSOR ROOM
Inspection evaporator, condenser
Inspection line and connection system
Testing compressor performance and balancing test
EXHAUST AND SUPPLY FAN
Inspection ducting line and connection
Inspection motor rotation
Inspection grill and diffuser
Testing motor fan
2016, OVER HEAD CRANE LINTECH 80/20 MT GBC CRUSHER 601
Inspection rail and rail clip
Inspection plumb and level of coloum
Load test crane with available load 125% SWL
Inspection girder surfaces and welded
Inspection and testing cross and traveling movement
Inspection and testing torque bolt as requirement
Inspection motor carried and hoist
Check oil level and specification as requirement
Check motor ampere
Testing pendant function
Testing brake hoist function
NDT and penetrant test hoist for crack
Load test at maximum load 125% SWL for deflection of girder
DMLZ FIX FACILITY UPPER & LOWER
FUEL BAY STATION
Inspection gun and hose rail
Inspection fuel metering
Inspection fuel filter
Inspection pipeline and leaking
Testing high and low level tank alarm
Testing fuel motor pump
Testing diffrensial pressure fuel motor pump
FAN DUCTING
Inspection motor fan
Inspection ducting connection
Testing fan flow
Testing fan vibration
CIP FUEL STATION
Inspection pipeline and connection
Inspection fuel motor pump
Inspection tightening bolt as requirement
Inspection fuel filter
Inspection gun and hose rail
Testing fuel motor pump
Testing high and low level tank
Testing diffrensial pressure fuel motor pump
Testing motorize valve open and close
Testing pressure relieve valve
GBC MAIN FAN 3 HOWDEN
Inspection shaft level
Inspection coupling alignment to shaft motor (Rotalign Ultra)
Inspection bolt connection and tightening torque as requirement
Inspection impeller clearance and run out
Inspection fan casing and radial vane control
Inspection parking brake and pin lock
Inspection discharge evasee and self closing doors
Inspection grouting and pedestal
Check oil level shaft bearing and spesification as requirement
Check air pressure and air flow measurement
Check motor lubrication, RTD connection
Solo run motor
Check motor vibration and temperature
Check motor ampere
Dry and Wet test commissioning
Check fan bearing vibration and temperature
OVER HEAD CRANE LINTECH 30/5 MT GBC CONVEYOR 601
Inspection rail and rail clip
Inspection plumb and level of coloum
Load test crane with available load 125% SWL
Inspection girder surfaces and welded
Inspection and testing cross and traveling movement
Inspection and testing torque bolt as requirement
Inspection motor carried and hoist
Check oil level and specification as requirement
Check motor ampere
Testing pendant function
Testing brake hoist function
NDT and penetrant test hoist for crack
Load test at maximum load 125% SWL for deflection of girder
2015, DMLZ CONVEYOR 514,512,511,510,508
Inspection and testing svendborg break and hydraulic unit
Inspection roller conveyor, modul square, belt tension, tracking belt, chute, scrapper etc
Inspection and testing motor drive (Toshiba, WEG, Hyundai), gearbox reducer (FALK Gearbox)
Testing pullcord, pullswitch, missalignment, belt rip, carryback sensor, tilt switch etc
Inspection and record vibration motor drive bearing, pulley bearing with vibration analyzer
Inspection pipeline installation according to P&ID diagram
Inspection gear reducer assembly
Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk
Inspection steelflex grid coupling and installation
Inspection conveyor
Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame
Inspection motor lubrication, RTD connection
Testing motor rotation direction
Inspection head and tail pulley lagging surface and bearing lubrication
Inspection discharge chute liner and bolt liner
Inspection curve chute liner and bolt liner, skirting rubber and elevation
Inspection primary, secondary, tertiary scrapper installation
Inspection v-flow blade bolt and surface of rubber curtain
Inspection tightening bolt as requirement
Inspection coupling alignment (Rotalign Ultra)
Inspection oil level and specification requirement
Solo run motor
Check motor vibration and temperature
Check motor ampere
AGGREGATE PLANT MP72
Inspection roller conveyor, modul square, belt tension, tracking belt, chute, scrapper etc
Inspection and testing Metso Jaw crusher C116
Inspection and testing hydraulic unit Metso Jaw crusher
Inspection and testing motor vibrator, counterweight vibrator of grizzily feeder
Setting gap moveable jaw crusher
Inspection and testing belt magnet
Inspection and testing Metso Cone crusher Nordberg
Inspection and testing lube and hydraulic system of Metso Cone crusher
Inspection hose connection, hose pressure and leakage
Setting gap adjusment ring
Inspection and testing hydraulic tramp release cylinder
Inspection and testing Metso Barmarg Crusher
Setting plate feeder tube, hydraulic gate, cascade, rotor feed
Solo run motor
Check motor vibration and temperature
Check motor ampere
2014, GBC VENTILATION DOOR INTAKE-6 (HYDRAULIC DIRECT MINING)
Inspection powerpack installation according to schematic diagram
Inspection hose working pressure, hose connection, hose layout, couplers connection
Inspection hydraulic cylinder, rod cylinder
Inspection and testing motor rotation direction
Inspection motor lubrication
Inspection hose line to rotary divider according inlet and outlet line
Inspection accumulator safety block
Inspection and testing bleeding hose and cylinder to make sure no air trap at line
Check oil level and specification as requirement
Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly
Inspection and testing door operation open and close and interlocking
APRON FEEDER CONVEYOR 508
Inspection motor lubrication
Inspection coupling alignment to motor shaft
Inspection grid coupling installation
Inspection chain bolt connection to flight
Inspection clearance flights to bump rail
Inspection sprockets, carry rollers, return rollers, flights, chains
Inspecton bearing lubrication head and tail shaft
Solo run motor
Dry test commissioning
Check motor vibration and temperature
Check head and tail shaft bearing temperature
LOAD TEST LINTECH BRIDGE CRANE 35/5 T
DMLZ CONVEYOR 511 MID DRIVE AREA
Inspection girder surfaces and welded
Inspection and testing cross and traveling movement
Inspection and testing torque bolt as requirement
Inspection motor carried and hoist
Check oil level and specification as requirement
Check motor ampere
Testing pendant function
Testing brake hoist function
NDT and penetrant test hoist for crack
Load test at maximum load 125% SWL for deflection of girder
DMLZ CRUSHER 503
Inspection motor crusher lubrication and RTD connection
Testing motor crusher rotation direction
Solo run motor crusher
Check motor crusher vibration and temperature
Check motor crusher ampere
Inspection oil circulation lubrication and hydraulic unit
Check pipeline according to P&ID diagram, oil filter, oil tank, oil level, oil temperature, oil pressure, breather, flow meter, directional control valve, motor rotation direction,
Inspection hydraulic cylinder and balancing unit
Bleeding air at balancing unit, check leakage, check pressure balance unit
Inspection spider fixing unit
Check oil level and specification as requirement, testing working pressure requirement, check working pressure hose, hose leakage, power pack unit
Inspection spider grease system
Check lubrication level and specification as requirement, testing motor rotation direction, check hose leakage
Inspection oil level of pinion gear, temperature sensor
Inspection bolt connection and tightening bolt as requirement
Inspection liner surface and bolt connection
Testing lifting up the main shaft and setting the maximum and minimum movement of main shaft
Inspection cooling fan motor, flange connection
ROCK BREAKER DMLZ CRUSHER 503
Check hoseline according to schematic diagram
Inspection boom cylinder, pivot cylinder, jib cylinder, pivot jib, pivot hammer
Inspection slew boom tightening bolt as requirement
Inspection hose connection and leakage
Inspection working pressure hoses as requirement
Inspection grease pump system and testing the motor grease rotation direction
Check grease level and specification as requirement
Check hammer grease pump and grease level
Check oil level and specification as requirement of Hydraulic Power Unit
Inspection motor HPU lubrication
Testing motor HPU rotation direction
Solo run motor
Check motor HPU vibration and temperature
Check motor HPU ampere
Testing rockbreaker movement
Testing hammer pressure
LOAD TEST LINTECH BRIDGE CRANE 30/5 T
DMLZ CONVEYOR 514 TAIL AREA
Inspection girder surfaces and welded
Inspection and testing cross and traveling movement
Inspection and testing torque bolt as requirement
Inspection motor carried and hoist
Check oil level and specification as requirement
Check motor ampere
Testing pendant function
Testing brake hoist function
NDT and penetrant test hoist for crack
Load test at maximum load 125% SWL for deflection of girder
DMLZ CONVEYOR 514
Inspection pipeline installation according to P&ID diagram
Inspection gear reducer assembly
Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk
Inspection steelflex grid coupling and installation
Inspection conveyor
Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame
Inspection motor lubrication, RTD connection
Testing motor rotation direction
Inspection head and tail pulley lagging surface and bearing lubrication
Inspection discharge chute liner and bolt liner
Inspection curve chute liner and bolt liner, skirting rubber and elevation
Inspection primary, secondary, tertiary scrapper installation
Inspection v-flow blade bolt and surface of rubber curtain
Inspection tightening bolt as requirement
Inspection coupling alignment (RotalignUltra)
Inspection oil level and specification requirement
Solo run motor
Check motor vibration and temperature
Check motor ampere
GBC FAN-2 (HOWDEN)
Inspection shaft level
Inspection coupling alignment to shaft motor (Rotalign Ultra)
Inspection bolt connection and tightening torque as requirement
Inspection impeller clearance and run out
Inspection fan casing and radial vane control
Inspection parking brake and pin lock
Inspection discharge evasee and self closing doors
Inspection grouting and pedestal
Check oil level shaft bearing and spesification as requirement
Check air pressure and air flow measurement
Check motor lubrication, RTD connection
Solo run motor
Check motor vibration and temperature
Check motor ampere
Dry and Wet test commissioning
Check fan bearing vibration and temperature
UPGRADE CYCLONE PUMP 2PC-8842 (NSGC MILLS 10&11)
Inspection motor skid
Inspection motor lubrication and RTD connection
Testing motor rotation direction
Solo run motor
Check motor vibration and temperature
Check motor ampere
Testing motor VFD
Inspection alignment pump to motor
Inspection sheave motor and sheave bearing housing
Inspection belt tension and belt surface from damage
Inspection bolt and flange connection
Inspection bearing housing
Inspection pump, mechanical seal, cooling water
Check oil level of bearing housing and specification as requirement
Check bearing temperature
Dry and wet test commissioning cyclone pump
GBC BATCHING PLANT 2830
Inspection and testing rollmaster mixer
Inspection and testing screw conveyor
Inspection silo cemen and testing the level of cement
Inspection and testing water meter an d admixture scale
Inspection and testing dust collector
Inspection and testing fiber dispencer
Inspection buffer hopper, receiver hopper bolt connection, air vibrator
Inspection and testing stacker conveyor
Inspection and testing aggregate conveyor
Inspection motor lubrication, motor rotation direction, solo run motor, check motor vibration and temperature
2013, UPGRADE CYCLONE PUMP 2PC-9201
Inspection motor skid
Inspection motor lubrication and RTD connection
Testing motor rotation direction
Solo run motor
Check motor vibration and temperature
Check motor ampere
Testing motor VFD
Inspection alignment pump to motor
Inspection sheave motor and sheave bearing housing
Inspection belt tension and belt surface from damage
Inspection bolt and flange connection
Inspection bearing housing
Inspection pump, mechanical seal, cooling water
Check oil level of bearing housing and specification as requirement
Check bearing temperature
Dry and wet test commissioning cyclone pump
UPGRADE CYCLONE PUMP 2PC-9202
Inspection motor skid
Inspection motor lubrication and RTD connection
Testing motor rotation direction
Solo run motor
Check motor vibration and temperature
Check motor ampere
Testing motor VFD
Inspection alignment pump to motor
Inspection sheave motor and sheave bearing housing
Inspection belt tension and belt surface from damage
Inspection bolt and flange connection
Inspection bearing housing
Inspection pump, mechanical seal, cooling water
Check oil level of bearing housing and specification as requirement
Check bearing temperature
Dry and wet test commissioning cyclone pump
GBC VENTILATION DOOR GVD-3 XC-6 (HYDRAULIC DIRECT MINING)
Inspection powerpack installation according to schematic diagram
Inspection hose working pressure, hose connection, hose layout, coupler connection
Inspection hydraulic cylinder, rod cylinder
Inspection and testing motor rotation direction
Inspection motor lubrication
Inspection hose line to rotary divider according inlet and outlet line
Inspection accumulator safety block
Inspection and testing bleeding hose and cylinder make sure no air trap at line
Check oil level and specification as requirement
Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly
Inspection and testing door operation open and close and interlocking
NORTH SOUTH GRAVITY CONCENTRATOR MILLS 10&11
Inspection and testing concentrate tank
Inspection and testing concentrate transfer pump
Inspection and testing concentrator feed screen
Inspection and testing knelson concentrator
Check pipeline according to P&ID drawing
Inspection motor lubrication
Inspection alignment motor to pump
Inspection belt tension, sheave pulley
Inspection HDPE line and pipeline leakage
Solo run motor
Check motor vibration and temperature
Testing motor VFD
FUEL STATION RELOCATION MP66
Check pipeline according to P&ID diagram
Inspection filter element
Inspection motor lubrication
Inspection alignment motor to pump
Testing and measuring fuel flow
Inspection pipeline leakage
CIP RUBBER TIRE MAINTENANCE SHOP
Inspection and load test Crane Demag Double Girder ZKKE 50T
Inspection and testing motor and air pump fuel tank
Inspection and testing motor and air pump lube tank
Inspection and testing Compressor Ingersoll Rand
Check pipeline installation according to P&ID diagram
Inspection and flushing fuel and lube line
Inspection pipeline leakage
Inspection and testing solenoid valve air pump
Setting regulator pressure fuel,lube and grease air pump according to working pressure as requirement
Inspection and testing motor and pump grease golden bag
GBC VENTILATION DOOR NED-5 XC-9 (AIRLOCK DOOR)
Inspection hose installation according to P&ID diagram
Inspection hose working pressure, hose connection, hose layout, flow meter
Inspection Air pressure unit system and tubing connection
Setting pressure regulator according to working pressure requirement
Inspection air cylinder, rod cylinder
Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly
Inspection and testing door operation open and close and interlocking
HVAC POWER PLANT-C
Check ducting installation according to drawing
Inspection ducting insulation
Inspection ducting bolt and connection
Inspection damper and fire smoke damper
Check freon level and spesification as requirement
Inspection and testing semi hermetic compressor
Inspection tubing connection and leakage
Inspection and testing motor blower, filter, evaporator, condensor, blower fan of Air Handling Unit
2012, HVAC AMOLE SUBSTATION
Check ducting installation according to drawing
Inspection ducting insulation
Inspection ducting bolt and connection
Inspection damper and fire smoke damper
Check freon level and spesification as requirement
Inspection and testing semi hermetic compressor
Inspection tubing connection and leakage
Inspection and testing motor blower, filter, evaporator, condensor, blower fan of Air Handling Unit
GBC VENTILATION DOOR GVD 5-6 (AIRLOCK DOOR)
Inspection hose installation according to P&ID diagram
Inspection hose working pressure, hose connection, hose layout, flow meter
Inspection Air pressure unit system and tubing connection
Setting pressure regulator according to working pressure requirement
Inspection air cylinder, rod cylinder
Inspection door hinge bolts, connection pad eye to rod cylinder, pull switch, door rubber install correctly
Inspection and testing door operation open and close and interlocking
WDD PORTAL (HEAD ROAD)
Inspection pipeline installation according to P&ID diagram
Inspection pipeline chain and support
Inspection HDPE working pressure specification
Inspection bolt support
Inspection valve, flange, elbow, pressure gauge, pressure switch
Inspection HDPE leakage
Check flow meter
GRASSHOPPER GHX-211 (LOWER WANAGON)
Inspection gear reducer assembly
Bevel gear, pinion gear, breather, dip stick, oil drain, shaft surface, cooling fan, hub and srink disk
Inspection drive assembly
Fluid coupling, filler and drain plug fluid coupling, floating shaft, back stop, high speed coupling, gear reducer
Inspection conveyor
Dimension of belt according drawing, belt surfaces from crack, tension belt, bearing roller and lubrication, connection lever hanger to bollard, bollard welding, adjustable of angle roller, self aligning roller, guide roller, impact roller, support roller frame
Inspection motor lubrication, RTD connection
Testing motor rotation direction
Inspection head and tail pulley lagging surface and bearing lubrication
Inspection discharge chute liner and bolt liner
Inspection curve chute liner and bolt liner, skirting rubber and elevation
Inspection precleaner and cleaner
Inspection v-flow blade bolt and surface of rubber curtain
Inspection rock diverter bolt and surface of rubber and plate
Inspection tightening bolt as requirement
Inspection coupling alignment (RotalignUltra)
Inspection oil level and specification requirement
Solo run motor
Check motor vibration and temperature
Check motor ampere
Dry test and wet test commissioning conveyor
INSTALL TEST CHAIN CONVEYOR GRS-51
Modify roller chain box
Modify servo and liveshaft roller
Inspection motor drive and setting brake
Check motor ampere
Check chain and bolt connection
Check chain roller position at weight scale
INSTALL TEST CHAIN CONVEYOR GRS-62
Modify roller chain box
Modify servo and liveshaft roller
Inspection motor drive and setting brake
Check motor ampere
Check chain and bolt connection
Check chain roller position at weight scale
DMLZ FAN-2 (HOWDEN)
Inspection shaft level
Inspection coupling alignment to shaft motor (Rotalign Ultra)
Inspection bolt connection and tightening torque as requirement
Inspection impeller clearance and run out
Inspection fan casing and radial vane control
Inspection parking brake and pin lock
Inspection discharge evasee and self closing doors
Inspection grouting and pedestal
Check oil level shaft bearing and spesification as requirement
Check air pressure and air flow measurement
Check motor lubrication, RTD connection
Solo run motor
Check motor vibration and temperature
Check motor ampere
Dry and Wet test commissioning
Check fan bearing vibration and temperature
DMLZ COMPRESSOR 2520 (ATLAS COPCO-ZR-750)
Inspection air filter
Inspection oil level, oil filter and oil pump of compressor
Inspection pipeline installation according to P&ID diagram
Inspection valve, flange, elbow, pressure gate
Inspection cooling and air system, intercooler, aftercooler, water separator
Inspection air receiver tank and electronic water drain
Inspection of compressor as low pressure, high pressure
Inspection safety valve according to setting pressure
Inspection of silencer
Check rotation direction of motor, temperature bearing and vibration
Check motor ampere
Dry and wet commissionig compressor
Inspection motor and cooling pump
BIGGOSSAN COMPRESSOR 2800 (ATLAS COPCO ZR-750)
Inspection air filter
Inspection oil level, oil filter and oil pump of compressor
Inspection pipeline installation according to P&ID diagram
Inspection valve, flange, elbow, pressure gate
Inspection cooling and air system, intercooler, aftercooler, water separator
Inspection air receiver tank and electronic water drain
Inspection of compressor as low pressure, high pressure
Inspection safety valve according to setting pressure
Inspection of silencer
Check rotation direction of motor, temperature bearing and vibration
Check motor ampere
Dry and wet testing compressor
Inspection motor and cooling pump
LIVE HOPPER BALL MILL 74
Inspection inflatable liners connection
Inspection inflatable leakage
Inspection inflatable buble
Inspection all cover liners
Inspection liner bolt and torque as requirement
Testing inflatable movement
2011, GBC FAN-1 (HOWDEN)
Inspection shaft level
Inspection coupling alignment to shaft motor (Rotalign Ultra)
Inspection bolt connection and tightening torque as requirement
Inspection impeller clearance and run out
Inspection fan casing and radial vane control
Inspection parking brake and pin lock
Inspection