Lawrence Albert L. Talaue
+63-977-***-****; +63-910-***-****
addohd@r.postjobfree.com
PERSONAL PROFILE:
Versatile, highly motivated, results-oriented individual possessing a proven record of achievement in
system analysis and design, computer assembly, training, main contractor and contractors relations. Extensive experience in
Primavera and Quantity Surveyor for Structural, Mechanical and Quantity Surveyor for Procurement (Mechanical and
Architectural finishing). Demonstrated ability to work independently or as an integral part of a team to achieves objectives
and goals.
JOB DESCRIPTION:
Sr. Quantity Surveyor / Estimator (Construction Department) for MUBARAK ABDULLAH
ALSUWAIKET SONS.CO.
July 24, 2016 – July 24, 2017
Attend Job-Ex to the clients and site surveillance prior for Bid submittal.
•
Assist and provide estimation of materials for preparation of MTO (Material Take
•
Off) based on provided General Plot drawings, detailed drawings & IFC (Issued for
Construction) drawings.
Assisting for the preparation of data submittal for work estimation per activity
•
mentioning the manpower & equipment for man hours computation as per activity and different
disciplines.
Quantity Surveyor (Construction Department) for SAUDI OGER LTD.
King Abdulazis Center for World Culture (KACWC 8483) ITHRA’A Project Aramco Dharan K.S.A
June 6, 2015 – March 24, 2016
Assist for preparation of OMM (Operation Maintenance Manual) packages for SA
•
approval.
Monitoring project progress and reporting deviations (minutes of meeting) for
•
MEP, Architectural finishing & external woks.
Procurement Status & pending delivery of material local & foreign.
•
Preparation progress reporting with S- Curve chart status, QA/QC weekly status,
•
and HSE weekly highlights.
Attend weekly construction meeting to confirm the schedules and to know which
•
areas or activities need of concern and which activities must be completed.
Quantity Surveyor / Material Expediter (Procurement Department) for SAUDI OGER LTD.
King Abdulazis Center for World Culture (KACWC 8483) ITHRA’A Project Aramco Dharan K.S.A
January 6, 2015 – April 29, 2015
• Check BOQ quantities for lighting fixtures comparison with the approved IFC
drawing in order to finalize the procurement for the remaining quantities.
• Coordination and follow up of the pending issues like approval of materials, NOL
status, engineering issues, manufacturers compliance and procurement updates.
• Follow up of schedule for delivery of materials from the suppliers for Lighting
fixtures.
• Preparing and submittal of Reports to the top management and proponent
regarding for the status for Lighting fixtures.
Planning Engineer (Project Control Department) for SAUDI OGER LTD.
King Abdulazis Center for World Culture (KACWC 8483) ITHRA’A Project Aramco Dharan K.S.A
November 29, 2014 – January 5, 2015
• Assist Planning Engineer in preparation of master & Detailed time schedules for
EPC (Engineering – Procurement – Construction) Projects.
• Assist in assigning detail resources (Manpower, Equipment’s & BOQ) for all
Divisions (Civil/Structural, Finishes, MEP & External Works) in order to assess
resource requirements & their leveling to optimize their needs within project
schedule requirements.
• Assist in assigning detailed activity codes, cost accounts, resources codes in the
Project Schedule to generate Earn Value Management & S-curves.
• Assist in providing reports on resource requirements (Direct & Indirect)
Manpower Histograms & Spreadsheets to PD/PM.
• Follow up with Engineering, Procurement & Construction teams to collect & verify
project progress and use them in updating project schedule to assess the project
milestones are achievable.
• Assist in preparation & issuance of Short Term Work Plans (such as 2-Weeks or
4-Weeks look ahead) & communicate these plans to various members of Project
Team.
• Assist in preparing periodic reports for PD/PM, Head Office Management &
Client/Consultant.
Quantity Surveyor / Material Expediter (Procurement Department) for SAUDI OGER LTD.
King Abdulazis Center for World Culture (KACWC 8483) ITHRA’A Project Aramco Dharan K.S.A
August 9, 2014 – November 27, 2014
• Material expediter for mechanical and architectural finishing.
• Following the MR (material request) as requested from site and comparing the
remaining works / quantities on site as per discipline and what materials are
needed as per MR request.
• Follow up MR from approval in store for requested quantities, follow up MR for
approval from Project Manager and Project Director, follow up MR going to
approval of quotation from cost controllers, follow up MR for issuing PO to the
suppliers, follow up acknowledgement of suppliers from submitted PO, follow up
purchasing for sending payment request to suppliers upon delivery of material.
• Coordinating suppliers for payment status. Follow up with the suppliers upon
exact ETA (early time of arrival) of the materials on site.
• Coordinate the store / ware house for the scheduled ETA of the materials and
informing purchasers and in charge personnel that the materials was received on
site exact ETA.
• Updating status and sending weekly reports for the MR status: partial deliveries,
pending deliveries and critical MR’s need to be received.
• Following the status of the material up to delivery date of the suppliers on-site.
Site Coordinator (Construction Department) for SAUDI OGER LTD.
King Abdulazis Center for World Culture (KACWC 8483) ITHRA’A Project Aramco Dharan K.S.A
April 17, 2014 – August 8, 2014
• Raise RFI (Raise for inspection) in QA/QC (Quality Assurance/Quality Control) if
the QA/QC approved then we will proceed for the job closure (Masonry finishing
for CMU wall and concrete wall, painting application of primer, patty and first coat
to the CMU wall and concrete wall, dry wall installation starting for installation of
framing, studs, insulation installation, installation of FCB (fiber cement board),
installation of gypsum board depends on the “wall type” & installation of
suspended panel ceiling.
• Site Surveillance for verification in finish architecture need to be done and
coordinate to other work discipline team if ready to proceed for the closure of
area.
• Prepare two weeks look ahead construction schedule to be submitted every
Thursday for next week subcontractors work schedule.
• Verify output of daily progress for Architectural finishing wall and floor tiles.
• Prepare and submit DPR for tiling works everyday including the man power of
direct and indirect main contractor and subcontractors.
• Prepare and submit WPR every Thursday cut-off date including weekly
highlights.
Planning Engineer (Project Control Department) for TECHNIP
Halobutyl Unit KEMYA Project Joint Venture of Saudi Elastomers and Exxon Mobil
July 30, 2013 – November 30, 2013
• Verify output of daily progress of all discipline and on-going activities on site.
• Prepare and submit DPR everyday including the man power of direct and indirect
main contractor and subcontractors.
• Prepare and submit WPR every Thursday cut-off date including weekly highlights
progress as per discipline, S-curve chart as per discipline, Overall progress
status, overall S-curve chart status, QA/QC weekly status, HSE weekly
highlights, photos submittal that provides proof weekly movement progress on
site.
• Attend weekly construction meeting to inform the schedules and to know which
areas or activities need of concern and which activities must be completed.
Reinstatement Coordinator (Test Pack Center) for SAIPEM. MCHF
Manifa Core Hydrocarbon Facilities
May 11, 2012 – March 30, 2013
• Line checking and Verification of Mechanical works for GOSP-1, GOSP-2
GOSP-3, Area 4 & Area 5.
• Line checking of lines for verification of correct installation of fabrication
materials.
• Line checking of lines for verification of correct installation of erection materials.
• Line checking for gathering and verification of punch Items for Reinstatement
closure.
Quantity Surveyor for Insulation Painting & Touch-up Painting for Spools and Pipe Supports
(Planning Control Dept.) for SAIPEM. MCHF – Manifa Core Hydrocarbon Facilities
April 5, 2012 – May 10, 2012
• Quantity Surveyor for Installation of Pipe support works GOSP-1, GOSP-2 and
GOSP-3. Painting Insulation works for WP-1 and WP-2 and Touch-up for GOSP-
3 and East Manifold for Saudi Aramco Mega Project Manifa Core Hydrocarbon
Facilities.
• Submittal of Daily progress report, Weekly summary report, keeping old data and
reports intact for future reference.
Quantity Surveyor for Structural, Painting & Piping (Planning Control Dept.) for SAIPEM.
MCHF – Manifa Core Hydrocarbon Facilities
April 27, 2011 – January 22, 2012
• Quantity Surveyor for Saudi Aramco Mega Project in Manifa Core Hydrocarbon
Facilities.
• Quantity Surveyor for Erection of Structural works, painting of fabrication spools,
elbows and flanges for GOSP-1, GOSP-2, GOSP-3, ATM/HP GAS, TEG/GAS
and East Manifold.
• Knowledge of Quantifying and Identifying Spools and Random length Pipes,
Bolts, Flange and Valves in Weld Map Drawing or Isometric drawings for
preparation of MTO.
• Monitoring for delivering of materials on site, Stringing of pipes, Fit-up, Welding,
Valve installation and Bolt tightening.
• Submittal of Daily progress report and Weekly summary report for Structural,
Piping & Painting.
• Submittal of Reports in Structural, Piping and Painting by Graph for Weekly Work
front Summary.
• Monitoring Sub contractors daily progress update and prepare of backup reports
for Sub contractors monthly invoice.
• Keeping old data and reports intact for future reference.
Quantity Surveyor (Planning Control Dept.) for TECHNICAS REUNIDAS GULF (TRG) YERP-
Yanbu Export Refinery Project (Temporary Facilities)
February 12, 2011 – April 12, 2011
• Quantity Surveyor for Construction of PMT Office, EPC-1, Client Office, Satellite
Office, Lay down Yard, Badging & Orientation Office.
• Quantity Surveyor for Civil works in fencing installation for PMT Office, EPC-1,
Client Office, Satellite Office, Lay down Yard, Badging & Orientation Office.
• Quantity Surveyor for cable installation for lighting poles for PMT Office, EPC-1,
Client Office, Satellite Office, Lay down Yard, Badging & Orientation Office.
• Quantity Surveyor for construction of sewer line, fire water line and portable
water line for PMT Office, EPC-1, Client Office, Satellite Office, Lay down Yard,
Badging & Orientation Office.
• Quantity Surveyor for installation of power cables (SDB/MDB) for PMT Office,
EPC-1, Client Office, Satellite Office, Lay down Yard, Badging & Orientation
Office.
• Quantity Surveyor for installation of electrical switches, electrical panel board,
lights, power output, telephone output, data/LAN cable output, fire alarms, smoke
detectors and furniture’s for PMT Office, EPC-1, Client Office, Satellite Office,
Lay down Yard, Badging & Orientation Office.
• Quantity Surveyor for erection of structural structures for Lay down area,
structural for parking areas in PMT offices, Badging area, Orientation and Client
offices.
• Quantity Surveyor for construction of asphalt road and asphalt parking lot for
PMT, Client, Badging and Orientation offices.
Quantity Surveyor / Scheduler (Project Control Dept.) FAYSAL M. QAHTANI SONS COMPANY
(FMQ) K.S.A for Khuff Gas Project Uthmania/Shedgum & Fencing in Haradh
BI/JO 10-03006
July 19, 2010 – October 21, 2010
• Quantity Surveyor for Saudi Aramco Khuff Gas Project in Uthmania & Aindar.
• Scheduler for Khuff Gas Project in Uthmania-2004 & Aindar-600 using primavera.
• Preparing invoice for Saudi Aramco Khuff Gas Project Uthmania-2004, Aindar-
600 & OMP Fencing Projects Uthmania, Udhaliyah & Haradh.
• Quantity Surveyor for Saudi Aramco Oil Maintain Potential Project (OMP) in
Udhaliyah, Haradh & Uthmania.
• Quantity Surveyor for Saudi Aramco Oil Maintain Potential Project (OMP) in Civil,
mechanical, structural, electrical & Instruments.
• Quantity Surveyor for Saudi Aramco Fencing Projects for Oil Maintain Potential
Project (OMP) in Haradh, Hawiyah & Uthmania.
• Cost Estimation in materials for Saudi Aramco (OMP) Project flow lines, well
head pipings, pre-casting foundations, rebars for formworks, electrical &
instruments.
• Creating Work Breakdown Structure for Saudi Aramco (OMP) Project & Fencing
Projects.
• Scheduling the weekly project activities and assigning target completions for
construction.
• Update and maintain reports for submittal and backup documentation for weekly
and monthly progress.
• Generating and computing monthly invoice for Saudi Aramco (OMP) Project and
fencing Projects.
Quantity Surveyor / Cost Engineer (Project Control Dept.) FAYSAL M. QAHTANI
SONS COMPANY (FMQ) for SWCC EPWTS-2 Project at Jubail K.S.A
September 15, 2009 – May 23, 2010
• Quantity Surveyor for SWCC EPWTS – 2 Project at Jubail to Dammam.
• Update reports for civil works and mechanical works.
• Maintain reports and updates for submittal and backup documentation.
• Creating organizational breakdown structure, enterprise project structure and
important project details.
• Assigning and allocating resources.
• Create new calendar for the project, add activities in the project and importance
of the activity and details.
• Define resource codes, project codes, assigning and organizing of the codes.
• Define and assign work products and documents.
• Adding new currency and setting the exchange rate.
• Organize work breakdown and organizational breakdown structures into one
common structure.
• Manage multiple projects from highest levels of organization to the individuals
that perform specific project task.
• Implement coding standards for flexible reporting.
• Cost Engineer and compute monthly invoice for SWCC EPWTS -2 Project.
Quantity Surveyor / Cost Engineer (Project Control Dept.) FAYSAL M. QAHTANI
SONS COMPANY (FMQ) for Khurais Upstream Facilities (KCPF) BI/JO 10-03004
May 23, 2008 – September 14, 2009
• Quantity Surveyor for Saudi Aramco Mega Project in Khurais Upstream Facilities
North and South.
• Quantity Surveyor for Khurais, Abujifan and Mazalij Water Wells, Oil Wells and
Observation Wells.
• Update Civil works, mechanical works, structural works, electrical & instruments.
• Compute gather data in Primavera 3 and version 6.
• Run data for weekly submittal reports and monthly reports.
• Make backup, summary and documentation for weekly and monthly reports.
Sales Engineer / Field Technician (HYTECH INTEGRATED PRODUCTS)
September 2006 – August 2007
• Telephone presence and effective interpersonal skills.
• Experienced in maintaining accurate records and reports.
• Strong attention to detail and trained in workplace safely.
• Handled outbound sales duties, such taking, processing and filling orders.
• Experienced work in the field working in corporate and end user’s client.
• Knowledge in set up of Cisco and IBM servers.
• Knowledge in assemble, troubleshooting and repairs of branded and clown
computers.
Helpdesk / Technical Support Staff (JST ENTERPRISES)
November 2004 – July 2005
• PC troubleshooting both software and hardware for desktops and notebook.
• Local Area Network installation and maintenance.
• Provides technical support to common users and customers.
• Cisco Routers configuration.
• Store for internet café.
OIC / Sales Representative (360 Hush Puppies)
November 2002 – December 2003
• Provide leadership to team to accomplish department goals and monitor work
flow.
• Managed and processed all orders and sales contracts.
• Performed employee training and evaluation.
• Monitoring for inventory levels to ensure on-time delivery of products.
TRAININGS & SEMINARS:
Primavera 6 Version 8.1 & 8.2
(Stanford Training Center) Eton Cyberpod Corinthian Ortigas Avenue Cor. Edsa
Quezon City Philippines (December 2014)
Basic Course on Magnetic Particle Inspection
(Faysal M. Qahtani Sons Co.) Training Room # 3 C9 – Khurais Camp K.S.A
AutoCad 2008
(Microcadd Technologies Co.,Inc.) Araneta Center, Cubao Quezon City. Philippines
Basic Customer Service Training
(Hytech Integrated Products) N. Domingo St. San Juan Metro Manila. Philippines
HP Final Tier Aspire Academy Level 2 & 3
(People Ignite Organizational Development and Training Inc.) Philippines
Computer Technician
(E4.Com Training Center) V.V.Soliven Ave. Cainta, Rizal. Philippines
Database Concepts: MS ACCESS
(La Consolation College Manila) Philippines
Standardization and ISO 9000
(Polytechnic University of the Philippines)
Fundamentals of Linux Administration
(ICCT Colleges Foundation, Inc.) Philippines
Basic Systems Administration
(ICCT Colleges Foundation, Inc.) Philippines
SAUDI ARAMCO PROJECTS CERTIFICATE OF APPRECIATION
Reinstatement Coordinator for Manifa Core Hydrocarbon Facilities January 29, 2013
(Contract No. – 660******* IK)
Quantity Surveyor for Manifa Core Hydrocarbon Facilities January 22, 2012
(Contract No. – 660******* IK)
Quantity Surveyor for Utmaniah – 2004 (Jauf / Khuff Gas Wells) October 5, 2010
(BI-10-03006)
Quantity Surveyor for Khurais Mega Project September 8, 2009
(BI-10-03004)
CISCO CERTIFICATE OF COURSE COMPLETION
CCNA1 Networking Basics ICCT Colleges
CCNA2 Routers and Routing Techniques ICCT Colleges
CCNA3 Switching Basics and Intermediate Routing ICCT Colleges
CCNA4 WAN Design and Scan ICCT Colleges
EDUCATIONAL BACKGROUND
Bachelor of Science in Computer Engineering
Institute Of Creative Computer Technology Inc. (ICCT Colleges) (2003 – 2007)
Secondary Education: Isabela State University, (1992 – 1996)
Elementary Education: Marikina Boystown Complex, (1986 – 1992)
PERSONAL INFORMATION:
Age: 40 Height: 5’7” 1/2
* *
Date of Birth: July 21, 1979 Weight: 161 lbs.
* *
Place of Birth: Marikina City SSS No: 338-***-****
* *
Religion: Roman Catholic TIN No: 926-724-899
* *
Citizenship: Filipino Phil Health No: 03-050280371-5
* *
Civil Status: Married Passport No: P9594312A
* *
REFERENCES:
Eng'r. John Elmer Ceqeña (966-*********
Mechanical Welding Inspector
Mr. Romeo Sumargo +966-*********
Construction Rigger 1 addohd@r.postjobfree.com
Eng’r. Joel Mones +966-*********
Coating Inspector addohd@r.postjobfree.com
Dr. Bong L. Cabansag +63-917*******
Anesthesiologist
Reference Certificate available upon request