FRANCIS KEVEN U. FALQUEZA
Electrical Engineer
Registration/License No. 0051950
Brgy Cadlit Buenavista Quezon
Mobile Number: +63-929-***-****
Email address: addnwo@r.postjobfree.com
Seeking for an opportunity where I can best utilize my skills and knowledge in the field of electrical engineering to contribute in reaching the goals of an organization.
A competent electrical engineer with a comprehensive knowledge of developing and maintaining electrical systems and components to required specifications, focusing on economy, safety, reliability, quality and sustainability.
Professional with more than 5 years in the Field of Construction Works, Quality Assurance and Quality Control for Residential Buildings, Hotel, Restaurants, Casino, Petrochemical and Power Plant. A consistent track record of successfully completing projects from the concept and detail of the design through to implementation, testing and handover.
Good communication and organization skills.
Highly trainable and willing to work under pressure.
Demonstrates the ability to make competent decisions in emergency situations.
Capable of writing operating procedures, work requests, and purchase requisitions.
Demonstrates the ability to read and interpret mechanical drawings, electrical drawings / single-lines, technical manuals and P&ID's, write routine reports, solve practical problems.
Microsoft Office (Word, Excel, Power point, & Visio Presentation), AutoCAD, and Java programming
PLC maintenance in manufacturing.
Generate reports for construction and manufacturing
Menasco Electro-Mechanical Contracting (L.L.C.)
P.O. Box 19086, Dubai, United Arab Emirates
March 2017 – Present
Projects Handled:
The Hills (EMAAR) Project, Emirates Hills, Dubai – UAE.
Town Square Residences Plot-35, Dubai – UAE.
The Deyaar Midtown Afzan (Zone 2) & Midtown Dania (Zone 3), Dubai – UAE.
MEP QA/QC Engineer
Responsibilities:
Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.
Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.
Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.
Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS.
Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents.
Responsible for the closure of Non-conformance report, NCR and Site observation report, SOR.
Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Mechanical, Electrical, Plumbing and Fire Protection discipline interfacing the multidisciplinary operations.
Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.
Liaise the Technical Engineer for submission of material submittals to Consultant.
Ensure the Mechanical, Electrical, ELV, Plumbing and Fire Protection work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.
Ensure that the installation, inspection and testing of all the Mechanical, Electrical, Plumbing and Fire Protection equipment, fittings and work implemented meets the specification and the consultant requirements.
Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.
Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.
Conduct Continuity and Insulation (Megger) test of TTHN/THWN and XLPE Cables.
Conduct Ground Earth Resistance Test for individual and interconnection of Earth Rod.
Conduct Internal Inspection in testing of Low Voltage Switch Board, Capacitor Bank, Main Distribution Panel, ATS, Generator, Sub-Main Distribution Board and Distribution Board.,
Internal Inspection in testing of ELV System such as Fire Alarm System, Central Battery System, Lighting Control System, Intercom System, UPS System, Access Control, Gate Barrier, Structural Cabling, CCTV and BMS System.
Review Testing, Adjusting and Balancing Procedure [Air & Water] prior to commencement at site.
Review Testing Procedure of Pneumatic, Hydro & Duct Leak prior to execution at site.
Review Chemical Dosing Procedure for Chilled Water Piping prior to execution at site.
Witness Start-up, Testing & Commissioning of Mechanical, Electrical, ELV, Plumbing and Fire Protection systems.
Conduct Punch Listing/ Snag list.
Prepare and maintain the QC Dossier.
QA/QC Electrical Engineer – Crosslink Electric Construction Corp.
(Transasia Construction Development Corp.)
Okada Manila – Sakura Project
Paranaque, Philippines
April 27, 2016 to February 2017
Responsibilities:
Generate Inspection Request to the Client before Testing.
Day-to-day coordination with client inspectors for site inspections and ensures that every inspection item meets the minimum requirements.
Material Inspection and Receiving of Delivered Electrical Equipment and Materials.
Conduct visual inspections and monitoring on installation of electrical equipment’s and materials, which includes. Underground and Aboveground Conduits, Cable trays, Cables, Transformer, MVSG, LVSG, MDP, Panel Boards, Bus Duct, Grounding and Lightning Protection.
Preparing the Documents of Test Packages/ISTO for Testing and Commissioning of Electrical Equipment.
Conduct Insulation Resistance and Continuity Test for Electrical Cables and Bus Ducts in Heavy Engineering and Podium Area.
Conduct Bolt Torqueing/tightening of XLPE/THHN cables termination and Bus Ducts.
Ground Earth Resistance Test for individual and interconnection of Grounding Rod.
Inspection in testing and commissioning of Transformer, Medium Voltage Switch Gear, Low Voltage Switch Gear, Main Distribution Panel and Panel boards.
Inspecting of High Potential Test of XLPE Cables.
Conduct/Witness Energizing and Testing and commissioning of High Voltage and Low Voltage Electrical Equipment’s.
Conduct Punch listing
Al Rushaid Const. Co. –EEI
P.O. Box 31688, Al Khobar, Saudi Arabia
September 2014 – February 2016
Projects Handled:
Rabigh 2 Independent Power Plant, Rabigh II Industrial City, Kingdom of Saudi Arabia
Rabigh II Refining and Petrochemical Project, Naptha & Aromathics Package Petro Rabigh, Kingdom of Saudi Arabia.
QA/QC Engineer - Al Rushaid Const. Co.-EEI
Responsibilities:
Prepares Request for Inspection and Testing (RFIT), Monitoring and checking RFIT status to ensure proper standard operation was followed.
Day-to-day coordination with client inspectors for site inspections and ensures that every inspection item meets the minimum requirements.
Conduct visual inspections on installation of electrical equipment’s, which includes Underground and Aboveground Conduits, Cable trays, Cables, Cathodic Protection System, Grounding and Lightning Protection, Lightings and Fire Fighting System at Combined Cycle Power Plant.
Conduct Bolt Torqueing/tightening of XLPE/THHN cables termination.
Conduct Ground Earth Resistance Test for individual and interconnection of Grounding Rod.
Inspection in testing and commissioning of Transformer, Medium Voltage Switch Gear, Low Voltage Switch Gear, Main Distribution Panel and Panel boards.
High Potential Test of XLPE Cables.
Conduct Punch Listing
Maintenance Engineer -Honda Parts Manufacturing Company
101 North Science Avenue
Binan, Laguna, 4024 Philippines
January to May 2014
Responsibilities:
Troubleshooting and monitoring of PLC controlled machines like Die Casting machine.
Daily monitoring of Die casting Machine.
Generate Preventive maintenance to ensure machine’s quality and production.
Bachelor of Science in Electrical Engineering
Southern Luzon State University
Lucban Quezon,Philippines
Registered Electrical Engineers
Professional Regulation Commission of the Philippines
License No. 0051950
UAE Driver’s License
Automatic Transmission (Light Vehicle)
License No. 3958119
Basic of ISO 9001: 2000 Awareness on Quality Management System Requirement.
Electrical Inspection Seminar (Sponsored By: ARCC-EEI )
Instrumentation Inspection Seminar (Sponsored By: ARCC-EEI )
EDCC (Engineering Development Crash Course) Training (Sponsored By EEI)
Age: 27 y/o
Civil Status: Single
Nationality: Filipino
Known Languages: English, Tagalog
Visa Status: Employment visa
Height: 5’8’’
Engr. Nestor Arevalo
QA/QC Manager
Cross Link Electric Construction Corp.
Engr. Bayan Shaath
QA/QC Manager
Menasco Mechanical Contracting (L.L.C)
I hereby certify that the above mentioned information is true and correct to the best of my knowledge.
ENGR. FRANCIS KEVEN U. FALQUEZA
Career Objective
Skills/Knowledge
Work Experience
Educational Attainment
Licenses and other Certifications
Training and Seminars Attended
Other Information
Information:
Character References