Post Job Free
Sign in

Civil Engineering Engineer

Location:
Qibla, Kuwait City, Kuwait
Posted:
June 07, 2020

Contact this candidate

Resume:

Contact

********-******** (Work)

addn5f@r.postjobfree.com

www.linkedin.com/in/ahmed-

khamis-60a277103 (LinkedIn)

Top Skills

AutoCAD

Primavera P6

Tekla Structures

Languages

English

Certifications

Italian project

Ahmed khamis

Civil Engineer at The Bridge Company

Kuwait

Summary

I am 32 years old, working as a Civil resident engineer with a 10 year's experience in Egypt and Kuwait. I am a Kuwait resident. I have my Kuwait driving license. I am seeking a vacancy where I can implement my knowledge and experience, and ready for an interview in Kuwait.

I am available to traveling anywhere to working a civil engineer job I am a valuable worker. I have good experience in project management, site supervision, project coordination, and quantity surveying as I worked on several healthcare and residential projects. I also have a good experience working with the USA Army in Kuwait bases for more than 5 years.

Kindly find attached to this post a copy of my resume that details my qualifications, certificates, and my past experience. Best Regards,

Civil Engineer/ Ahmed Khamis

+965-********

Experience

The Bridge Company

5 years

Civil Engineer

September 2015 - Present (4 years 9 months)

Responsibilities as a site engineer:-

Page 1 of 10

• Executing work on as per approved drawings.

• Executing the project on time, within the approved budget and in accordance with the contract specifications.

• Arranging required permits and documents.

• Site visit & survey for new projects.

• Reporting daily progress report to the manager.

• Quantity surveying.

• Complete responsibility for the execution of the construction scopes for assigned projects.

• Coordinating and arranging with relevant company departments for timely allocation of labor, tools, equipment, machinery, material, and other resources.

• Attending regular meeting with the client to provide the update on project progress.

• Identifying construction risks and prepare action plans to mitigate exposure.

• Material and equipment management.

• Ensuring that the quality of material and installation of work is in accordance with the acceptable criteria identified for the project.

• Ensuring that the work is completed in accordance with the specified Project Quality and Health, Safety & Environment Plans.

• Controls and supervises through all phases of development to construction completion and project close-out.

• Responsible for ensuring safe construction practices in the storage and movement of tools, equipment, and material, adoption of safe work practices by all supervised levels & visitors, the implementation of safety policy as directed by the company’s safety plan

• Conducting daily/weekly meetings with site staff to organize work for the day/ next day.

• cost control

Civil Engineer

January 2020 - Present (5 months)

Kuwait

Project name: 1400 Blocks Stormwater Drainage, Camp Arifjan, Location: Camp Arifjan,

Client: U.S. military USAF.

Prime Contractor: Vectrus Co.

Subcontractor: The Bridge Co.

Description Works

Page 2 of 10

Experience obtained from this project, All works in this project Stormwater Drainage (Rip Rap).

How to get rid of water in case of heavy rains and drain it using a system called Rip Rap.

Use a special material to protect the soil from erosion ( Soil Stabilization ). laying layer from Gatch & Gravel before laying Rip Rap. filter system (V) Shape Channel.

submit a method statement for all construction and material installation. My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

Civil Engineer

September 2018 - January 2020 (1 year 5 months)

Kuwait

Project Name: Kennels with USFA

Major tasks and responsibilities in this project (Main points)

• Collaborate with engineers, architects, etc. to determine the specifications of the project

• Negotiate contracts in collaboration with Procurement with external vendors to reach profitable agreements

• Ensures full compliance for projects in accordance with Bayer Regulations

• Obtain permits and licenses from appropriate authorities

• Determine needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations

• Plan all construction operations and schedule intermediate phases to ensure deadlines will be met

• Acquire equipment and material and monitor stocks to timely handle inadequacies

• Hire contractors and other staff and allocate responsibilities

• Supervise the work of laborers, mechanics, etc. and give them guidance when needed

Page 3 of 10

• Evaluate progress and prepare detailed reports

• Ensure adherence to all health and safety standards and report issue Activities:

1-All civil work Include the following (concrete, foundations, subgrade, base course, sewage pipes, manholes, water pipes, drainage pipes...etc.) 2-Steel structure works include the following complete the construction of a new MWD Kennel with veterinary Clinic (All materials from KIRBY company 3-Executing electrical works include the following ( Lighting, MDP, DP, switches, wiring, ground eath, pole light around the building..etc.) 4-Executing mechanical works include the following (fire alarm system, HVAC etc.)

Civil Engineer

August 2018 - January 2020 (1 year 6 months)

Kuwait

Project name: Mina AL Zour (K 216) New refinery, ALGhanim company All works in this project Road works (Asphalt)

My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

This project consists of three main layers of executing : sub-grade preparations.

sub-Base 25 CM Gatch&Gravel

Base course 25 CM Gatch&Gravel

After Asphalt works

Spray MC70

AC Paving 7.5 CM Type iii

Spray Tack coat

AC Paving 5CM Type I

Page 4 of 10

Civil Engineer

November 2019 - December 2019 (2 months)

Kuwait

Project name: Manitniace All Parking in Ali Alsalem All works in this project Road works (Asphalt)

I working to three locations ( Quarry parking, Manitniace parking B315, Building 505 Parking)

My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

This project consists of three main layers of executing : sub-grade preparations.

Base course 15 CM Gatch&Gravel

After Asphalt works

Spray MC70

AC Paving 7.5 CM Type iii

Civil Engineer

October 2019 - December 2019 (3 months)

Kuwait

Paving Project

Italian project ( construction of complex )

January 2018 - September 2018 (9 months)

Kuwait

Project Name: Tender 850 Italian

Supply and install construction of complex from Italian ( G&G ) Company, all buildings assembling

Executing new building fo bathrooms ( all this building made from a steel structure with assembly...etc.)

patriot maintenance Bay with USF Army

October 2017 - February 2018 (5 months)

Kuwait

Company Industry: Construction/Civil Engineering

Page 5 of 10

Job Role: site Civil Engineering

owner: USAF

consultative: U.S. military USAF.

Ali Al Salem base US Air

The experience gained from the project

The work of

installing FABRIC STRUCTURE BUILDING by sprung tent company Poured concrete for footer ( sub base, Gatch&grave, Level, compact, shuttering, reinforcement wires, cubs for concrete, finishing surface, curing compound, inspection, etc )

Communication line ( install PVC Pipe, backfilling, install hand-hole and manhole, encasement concrete for pipes, dig a trench,.. etc) Water Line (install PVC Pipes, backfilling, testing pressure for pipe, gate valve, ...etc)

Septic Tank (casting concrete for slab, wall, sub base, backfilling, membrane .shuttering and steel work... etc)

RPA - Shelter

July 2017 - October 2017 (4 months)

Kuwait

Project descriptionLocation: Al Jahra, Kuwait

Company Industry: Construction/Civil Engineering

Job Role: site Civil Engineering

owner: USAF

consultative: U.S. military USAF.

Ali Al Salem base US Air

The experience gained from the project

The work of

Poured concrete for the airport ( sub base, Gatch&grave, Level, compact, shuttering, reinforcement wires, cubs for concrete, finishing surface, curing compound, inspection, etc )

Communication line ( install PVC Pipe, back filling, install hand-hole and manhole, encasement concrete for pipes, dig a trench,.. etc) Water Line (install PVC Pipes, backfilling, testing pressure for pipe, gate valve, ...etc)

Septic Tank (casting concrete for slab, wall, sub base, backfilling, membrane .shuttering and steel work... etc)

Utilities and Latrines with U.S. military

April 2017 - September 2017 (6 months)

Kuwait

Page 6 of 10

Project descriptionLocation: Al Jahra, Kuwait

Company Industry: Construction/Civil Engineering

Job Role: site Civil Engineering

owner: USAF

consultative: U.S. military USAF.

Ali Al Salem base US Air

The experience gained from the project

The work of

Communication line ( install PVC Pipe, backfilling, install handhole and manhole, encasement concrete for pipes, dig trench,.. etc) Water Line (install PVC Pipes, backfilling, testing pressure for pipe, gate valve, ...etc)

Septic Tank (casting concrete for slab, wall, sub base, backfilling, membrane .shuttering and steel work... etc)

Light Pole Foundation and Steel Pipes

Pole Light Foundations ( shuttering and steel works, cable, MDP, Feeder Panel, copper earth, manhole, lights etc)

Sewage work ( install PVC Pipe, Manhole, backfilling,..etc) Italian project

December 2016 - April 2017 (5 months)

Kuwait

Italian Project

Dec 2016 – April 2017

Project descriptionLocation: Al Jahra, Kuwait

Company Industry: Construction/Civil Engineering

Job Role: site civil Engineering

owner: Italian Army

consultative: Italian Army.

Ali Al Salem base US Air

The experience gained from the project

The work of

Sewage Line Pipes and Manholes

Water Line Pipes and Manholes

Gate Valve for Supply Water

Septic Tank Underground

Light Pole Foundation and Steel Pipes

Flag Pole Foundation and Steel Pipes

Installation PVC Pipes and Cable For Electrical

Installation Mani Distributions Panel For Electrical Page 7 of 10

Installation PVC Pipes for Communications

Concrete floors

Sub-base

Contraction and Expansion Joints

Foundation for Fence

Installation Column Fence and Gate

UAV Apron project with U.S. military

June 2015 - November 2016 (1 year 6 months)

Kuwait

UAV Apron American Army

Jun 2015 – Nov 2016

Project descriptionLocation: Al Jahra, Kuwait

Company Industry: Engineering

Job Role: Civil Engineering

owner: USAF

consultative: USAF.

Ali Al Salem base US Ai

. The experience gained from the project

Design and Drawing for Joints

The work of special breaks floors Airports

contraction and expansion Joints

Concrete floors

Sub- Base

AS-BUILT Drawing

Previous stress Concrete barriers and fences

Writing daily, weekly and monthly reports

Conducting daily / weekly meetings with site staff to organize work for the day / next day.

Universal Constraction Company

New Giza project

July 2014 - April 2015 (10 months)

Giza Governorate, Egypt

New Giza

Jul 2014 – Apr 2015

Project Description Universal General Contracting

Location: Cairo, Egypt

Company Industry: Construction

Job Role: Civil Engineering

I worked in A Universal General Contracting Project (New Giza). Page 8 of 10

Description of the project

The main building and mosque

The experience gained from the project

Concrete work (slanted ceilings and tiles) in the form of pyramids. Acts of walls at a height of more than 4 meters. Insulation of

all kinds work. Excavation and backfill. Business buildings. Decoration works

(Ceilings pending). Acts of external glass. Flower beds and Landscape.

Delta General Contracting

Alex West project

April 2014 - July 2014 (4 months)

Alexandria Governorate, Egypt

Alex West

Apr 2014 – Jul 2014

Project Description Delta General Contracting

Location: Alexandria, Egypt

Company Industry: Construction

Job Role: Civil Engineering

I worked in Delta General Contracting Company

Description of the project

Residential city a group of villas

The experience gained from the project Concrete work Painting and decorating.

Office of Civil Consulting Group

steel works in civil Paper Company

July 2011 - April 2014 (2 years 10 months)

Alexandria Governorate, Egypt

civil Paper Company in Alexandria

Jul 2011 – Apr 2014

Project Description Office of Civil Consulting Group Location: Alexandria, Egypt

Company Industry: Construction

Job Role: Civil Engineering

I worked in an Office of Civil Consulting Group. Created store Paper Products Project (civil Paper Company in Alexandria)

Kharafi Group, the owner.

Description of the project

Created store to store paper products on a flat 4200 meters Page 9 of 10

The experience gained from the project

Installation of metal elements

Concrete works

Work paving roads

Concrete floors

Ground storage tanks (reinforced concrete)

Mechanical works for the installation of fire alarms and sprinklers Testing and laboratory experiments and compare the results

with the recommended code

omitted contract

Landscape work

Follow-up work and ensure the implementation of the business matching with engineering

plans and the bid requirements and specifications

The work of the private limited mineral elements

The work of the business extract

Education

Alexandria University

Bachelor's degree, Civil Engineering · (2008 - 2012) Page 10 of 10



Contact this candidate