Mr. Kalunga Kisitu
Lynchburg, Virginia, USA 1-567-***-****
addn4i@r.postjobfree.com
Professional profile
A skilled, innovative worker who stays determined and perseveres through new challenges, staying cool under pressure. Ability to work independently or as part of a team, adhering to a sense of organization and responsibility. A good communicator with a history of diplomacy and developing interpersonal relationships in order to meet company goals. An enthusiastic leader who can coach, motivate, and stimulate a team through multiple disciplines. A demonstrated ability to discern proprieties in order to handle multiple projects at once and adapt to new situations and environments.
Objective
To obtain a position in Electrical Engineering, Project Engineer, Automation: Integration & Commissioning (PLC/CNC), Power electricity, switchgear, or Maintenance.
Career summary
July 2018–April 2020
: American Hofmann Corporation, Lynchburg, Virginia, USA
Universal Balancing Machines, Unbalance Measuring Systems,
Automatic Integrated Balancing Solutions
https://www.hofmann-global.com/en/home.html
Ref: Simon Lott /CEO: 434-***-**** or Steven Prance /Eng. Manager 434-***-****
Controls Engineer; PLC Lead.
Experience with Ford Engine Plant in Windsor-Canada and Romeo-USA
Siemens Step7 & TIA Portal, Allen Bradley: RS Logix 5000, Omron PLC, Ladder Logic
Siemens Servo Drive: Sinamics S120 & Starter
Banner & Pilz Safety Controller
Kinetix Servo Systems, PowerFlex VFDs
Vision system: Kenyence, Laser displacement sensor LK-G5000 series
Conveyors system
Troubleshooting, Monitoring and Support
Write logic sequences and steps & verify the PLC codes consistency
June 2018–July 2018
: Corning Inc, Wilmington, NC 28405, USA
Optical Communications / Optica Fiber: Corning Advanced Optics is a global leader in providing cutting-edge solutions, offering a diverse set of optical products from materials to full systems.
https://www.corning.com/worldwide/en.html
Ref: Mr. Rodney /Manager 910-***-**** or Syed Kashif Raza Abidi: 508-***-****
Controls Engineer:
Beckhoff PLC, Allen Bradley: RS Logix 5000, Network System Analyser.
(STL) Structured Text Language
Optimization of the Fiber Optic Roller Distribution System
Communication Between PLCs
Troubleshooting, Monitoring and Support
Jan 2017–April 2018
: Fives DyAG Corp & Technosoft Engineering & REAutomated, USA
Automotive Company Experience: Short Term contracts
Integration, Troubleshooting, Monitoring and Support
A-Tesla Motors Plant, Fremont, CA 94538, USA: Sept 2017 to April 2018
Model S3 GA-Lines: Doors-Lines / Body manufacturing: Respot-2 Assembly Process, RFID Configuration (Hardware & Software), Hand Scanner configuration (Hardware & Software) // Data Man, conveyors system, VFD, vision system, PlantPAx & TeslaMultiSCADA & DCS.
Siemens TIA Portal & Allen Bradley, RS Logix 5000, PLC ladder
Allen Bradley: 1756-L83E ControlLogix 5580 & Safety Controller
PlantPAx & TeslaMultiSCADA & DCS
Troubleshooting, Monitoring and Support
Monitoring, Verify and Improve the logic sequences of the PLC / Door-Line
Improve the logic sequences of handshaking between PLC and Robots (Kuka) / Respot-2.
B-Faurecia Emissions Control Technologies, Columbus, IN 47201, USA: June 2017 to July 2017
Emissions control technologies, Automotive seating
Allen Bradley: 1756-L72S ControlLogix 5570 & Safety Controller
Allen Bradley, RS Logix 5000, PLC ladder
Improve and Monitor the logic sequences between the PLC and Robots (Fanuc).
Troubleshooting, Monitoring and Support
C-Vehtek Systems (COSMA), Bowling Green, OH 43402, USA: May 2017 to June 2017
Integration Sensor Infrared Temperature, w/IO-Link, Balluff BTS0002
Integration: Balluff Module BNI-PNT-508-105-Z015
Siemens plc & step7: CPU 319F-3 PN/DP, connection with Profinet network
Siemens Step 7 & TIA Portal experience
Troubleshooting, Monitoring and Support
D-Eberspaecher, Novi, MI 48377, USA: April 2017
Innovative Eberspächer exhaust gas technology
Siemens plc & step7
Troubleshooting IP address, reorganization of IP address
Monitoring and Support
E-Faurecia Automotive seating, Simpsonville, KY 40067, USA: Jan 2017 to March 2017
Faurecia Automotive Seating
ISD: Integrated System Design for material handling systems
Ultra Rail Pallet Rail-Shuttle System
Siemens PLC & step7 : CPU315F-2PN/DP
TIA Portal experience
Troubleshooting, Monitoring and Support: Ultra Rail Pallet, RFID, Communication,
ASi Networks, VFD_G110D
F-US Engineering Corporation, Wyoming, MI 49519, USA: August 2017
Emissions control technologies, Automotive seating
Allen Bradley: 1769-L30ER CompactLogix 5370 Controller
Integration: Keyence Camera System:
IV-G10 Sensor Module
IV-G500MA Ultra Compact Vision Sensor
Integration, Troubleshooting, Monitoring and Support
G-Ventra Flex-N-Gate & Allegiant, Sandusky, OH 44870, USA: July 2017
Automotive Lighting Manufacturer, Headlamp Supplier
Analyse and Improve production line
Allen Bradley: 1756-L72S Guard Logix 5370 Safety Controller
Collect Data, Monitoring, Troubleshooting and Support
RACER MACHINERY INTERNATIONAL INC.
Aug 2015 – Nov 2016
Control Systems Engineer (CNC machine with Siemens & Fanuc Control)
Project management, Acceptance testing: HAT, SAT, FAT, AutoCAD drawing
PLC and CNC control start-up and Commissioning: Siemens, Fanuc, ABB, Allen Bradley
Languages: Ladder, (STL) Structured Text Language and Macros(Fanuc)
Customer Services, PLC, Robots, Servo drives, CNC control, Troubleshooting
Market interests: Manufacturing, Mining/Petroleum/Gas, Automotive, Plastics and Rubber Products
GENERAL ELECTRIC CANADA
June 2010 – Aug 2015
Project Engineer (Power Engineering, Bus Duct, and Switchgear)
Determining project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors.
Experience with ISO 9001, CSA, and UL Certification.
Preparing project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates
Carry out the acceptance testing: HAT, SAT, FAT, and the after-sale customer care.
Major Projects:
Grand Coulee Dame (Washington USA)
Poste Charland (Montreal Canada)
GTE: MegaDeal-Algeria
GTE: PP14-Saud Arabia
Siemens switchgear breaker 4000A
ABB Low/medium voltage switchgear
PT-Cubicle and NGT: MegaDeal-Algeria
ABB Automation/Protection equipment
GLAC and GNAC: MegaDeal-Algeria
GLAC and GNAC: IPEX-Australia
GLAC and GNAC: Fort Hills USA
Key Products:
ISO-Phase Bus Duct
Segregated Phase Bus
Generator Terminal Enclosure (GTE)
Generator Line Accessory Compartment
Generator Neutral Accessory Compartment (GNAC)
PT Cubicle, Neutral Grounding Cubicle
Indoor & Outdoor Switchgear (600V-15kV, 5kV-125kv BIL)
Circuit Breaker up to 6000Amps
3 Phases Disconnect Switch (18kV-95BIL)
Neutral Disconnect Switch (18kV-95BIL)
Line Machines-Outils Inc (FIVES LINÉ MACHINES)
1995 – 2009
Automation Engineer (Engineering, Automation, Control)
1992 – 1995
Electrical Engineer (Automation Specialist)
Planned and coordinated activities related to the management of various electrical design projects and applied technical specifications of each project in order to meet compliance with standards of quality, cost, and productivity
Designed, manufactured, assembled, integrated, and calibrated electrical systems and determined the best choice of technology and supplier
Good general working knowledge on HMIs, PLCs, CNC and I/Os,
Experience with Simodrive 611 series Power module 611 series, Fanuc AC Servo Motor αi-B series
Experience with Siemens Spindle 1PH7 series, Fanuc Spindle Ai & βi series and HS_Fisher Spindle (120**-***** rpm)
Used programming applications such as PLC and CNC in order to find the optimal operational methods of the machine tool languages: Ladder, STL(Structured Text Language) and wrote macros for performing specific tasks (automatic tool changer, etc.)
Frequently travelled around the world to ensure the assembly, installation, and start-up of machine tools on the production sites themselves
Experience with Aerospace industry such as Boeing, Lockheed-Martin, Airbus, BAE system
Handled key systems and products including servo systems, axis drives, commissioning settings, input/output, hydraulic systems, and pneumatic.
Renishaw Laser Axis feedback system (High precision laser interferometer feedback systems)
Renishaw Measurement control system (Direct measurement of positioning error, repeatability, )
Renishaw Ballbar control System & Touch Probe Controls System
Major Projects:
Boeing / Seattle (WA)
Wichita (Kansas)
Premac / Stellex Precision Machining Inc. / Wellington (Kansas)
Héroux Defteck / Montreal (Quebec)
Lincoln Park Boring / Romulus, MI
Inc. Cincinnati / Cincinnati (Ohio)
Coast Composite / Irvine (California)
Precision Die / Chippewa Falls (WI)
Airbus / Chester (UK)
Lockheed Martin / Camden (Arkansas)
Major Tools / Indianapolis (Indiana)
Marmen / Trois-Rivières (Québec)
VAE / Zeltweg (Austria)
Education and qualifications
Bachelors (B.Sc.)
Bachelor of Science (Electrical Engineering)
Laval University, Québec, Canada
Bachelor's Degree
Training and memberships:
GE-Crotonville Leadership Program
Member of Ordre des ingénieurs du Québec
Member of the Coaching Association of Canada
CNC Acramatique
GE Fanuc CNC
CNC Siemens - 840D / 840Dsl
Skills
Microsoft Office (Word, Excel, PowerPoint)
AutoCAD
Ladder (GE-Fanuc CNC and PLC)
Programming languages: Pascal, C++, Macro
Servo Drive: Sinamics S120 & Starter
Siemens TIA Portal
Siemens S7
Factory Talk View
Wonderware
Renishaw Laser Axis feedback system: High precision laser interferometer feedback systems
Renishaw Ballbar control system
Banner & Pilz Safety Controller
VFD: Variable frequency Drive
Allen Bradley PLC, Studio 5000
Vision System: Keyence, Cognex
Allen Bradley RS Logix 5000
SCADA, PlantPAx, DCS
Kinetix Servo Systems, PowerFlex VFDs
Renishaw Measurement control system (Measurement of accuracy, repeatability)
Renishaw Touch Probe Controls System
Troubleshooting
Additional Information
Languages:
English (working proficiency),
French (fluent),
Swahili (fluent)
Driving:
Driver; full clean license