Apu Kundu
Mobile: +974-****-**** Email Address: ***.**********@*****.***
Date of Birth:5th October 1973,Language:English,Hindi,Bengali
LinkedIn Profile: linkedin.com/in/apu-kundu-3583a732
Nationality-Indian/:Work Visa: Qatar Work-Permit-I.D NO:27335632874l Availability: 45 days
Professional Summary
Senior Land Surveyer with 24years proven experience in industries relating but not limited to Construction, infrastructure, hydropower, irrigation, highway, expressway and transmission lines.
Diverse professional exposure in international settings across India, Sri Lanka, Iraq, UAE, Saudi Arabia and Qatar.
Notable successes in operating various instruments such as Total station, GPS, level instrument and strong expertise in software such as AUTOCAD, MS excel and MS word.
Proven abilities in working with high-performing and cross-functional teams in the delivery of multiple concurrent projects in fast-paced and dynamic environments.
An effective communicator with an excellent ability to engage stakeholders across all levels and a robust track record in implementing systematic processes that ultimately brings about sustainable business growth and achieve organizational KPIs.
Areas of Expertise
AutoCad
MS Excel
MS Word
Land Surveying Works
GPS
Level Instruments
Total Station
Stakeholder Management
Strategic Leadership
Team Supervision & Development
Detail-oriented
Effective Communication
Career History
QATAR BUILDING COMPANY (Q.B.C), DOHA, QATAR Feb 2014 – Present
Senior Land Surveyor
Projects:
GTC 299 AND GTC 269 (Al Wukair RPS Pipeline / Water Reservoir)
oWater Reservoir (4 nos), 8 km Road, 35 km Pipe line& Substation
Doha Metro Rail Major Stations Project, (Green Line)
oConstruction of Education City under Ground Metro Station
Road and Infrastructure in Al Saliiya-North of Salwa Road (DW013)
oConstruction of 28 Km Road with 6 no's Roundabout and median barrier, kerb stone, Drain etc.
oConstruction of 9.4 km Sewer Line, 11 km Ground Water line & 5.050 km TSE Line with Manholes etc.
oReporting to the Project Manager
Responsibilities:
Survey terrain, prepare accurate schematic sketches and reviewed collected data
Plan, monitor and coordinate ground surveys, operate and maintain map reading equipment and tools
Being in charge of making standards for special project to improve QA/QC survey works and as built drawings
Supervise setting out works to construct as per construct ability drawings incorporate with site work instruction
Site investigation for existing underground and ground services and giving proper solution to progress and approve service clearance inspection report for construction
Supervise the establishment of control point from the primary control points for project and site survey works as per shop drawing & specifications
Check the alignment & elevation of road setting out & other service lines
Alignment to excavation, formation, pipelaying (sewer storm-potable-irrigation water) manholes short pieces level installation, chambers (house connection catch basin, art works cut fill. Road base & Sub-base & Asphalt works-crab stone works
Evaluation and substantial experience in volume calculations with profaned design & site data
Provide consultancy and getting inspected and approvals for survey inspections for various activities before concrete pour
Deliver surveying works and technical assistance for infrastructure utilities, pump station, substations, road works and Qatar rail project
Manage CAD technician, survey team
Selected Achievements and Career Highlights:
Achieving targets and finishing works on time
ARABUILCO CONSTRUCTION, BAGDAD, IRAQ, ERBIL, IRAQ Jun 2013 – Feb 2014
Land Surveyor
Projects:
Arbill mass city project
o10 nos Residential Buildings (G+5)
oInfrastructure and roads works the infrastructure work executed Potable water, Gravity Sewerage lines, storm water, Firefighting, irrigation and Electrical works and Electrical substations and land landscaping
Responsibilities:
Site execution and arrangements and Co-ordination with the Engineers, QA/QC, and getting inspected and approvals for survey inspections for various activities before concrete pour
Reviewing of all Construction – Concrete body plans, Architectural drawings etc. to clarify if any missing or conflicting details. To solve the issues and provide the correct, approved details and drawings to the construction team and ensure job is performed in smooth and approved manner
Transferring Levels and Co-ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Control, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels
Important Grid & coordinates marking for the building & foundation using Total Stations
Review blueprints & legal deeds survey area detail. Marked columns, footing, Grade beams, piles cap, retaining walls and roof slabs
Surveying works and technical assistance for high rise building works
Supervise 1 assistant
Selected Achievements and Career Highlights:
Completion of project on time and independently handled the complete project
KEC INTERNATIONAL, COLOMBO, SRILANKA Dec 2012 – Jun 2013
Survey Officer
Projects:
New Galle Transmission Development Project
oConstruction of 40Km Ambalangoda to Galley 132kv (DC) Transmission Line
Responsibilities:
Surveyed terrain, prepared accurate schematic sketches and reviewed
Performed alignment surveys, detail surveys, and profile drawings
Checked surveys and fixed tower locations, and Tower Spotting; determined angle points and marked pits; supervised foundation work
Performed primary and final topographical surveys for partition of transmission lines; prepared comparative route alignments and determined most economic route; prepared ground profile after detail survey to finalize tower quantities; checked survey according to profile and spotted towers prior to initiation of civil work
Handled contouring in hilly terrain by finalizing leg/chimney extensions
Surveying works and technical assistance for high voltage transmission line
Supervised 1 assistant
Selected Achievements and Career Highlights:
Handled work independently and assisted in selecting the more economical route for laying of high voltage transmission line by reducing the cost
SHAPOORJI PALLONJI INTERNATIONAL FZE, RIYADH, KSA Feb 2011 – Dec 2012
Land Surveyor
Projects:
King Abdullah Financial District (KAFD)/SAUDI ARABIA
oThe Project calls for Construction of four mixed used Buildings. The maximum height of building is 12 & 22 story and located in KAFD Parcel 4.11 & 4.12 at king Abdullah Financial District. And 4 Basement level below grade level contain 300,000 sf and accommodate approximately 673 cars above grade the building contains 375000sqf. And includes office, residential and retail function. The building Maxima height 70 meters /160 meters
Responsibilities:
Transferring Levels and Co-Ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Controls, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels, vertical and horizontal curves, fixing of embedment plates, bolts, dowels, nibs for the steel and concrete structures
Setting out of all vertical and horizontal elements of sub and super structure of the building
Setting out for Pile points, columns, Retaining walls, Beams, Slabs sump pits, etc
Setting out for Curve wall, grid Line etc
Leveling for Blinding, Raft, Suspended Slabs, Retaining walls, etc
Benchmark carrying and Verticality checks
Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, QA/QC
Consultants and getting inspected and approvals for survey inspections for various activities
Preparation and submittal of Pre pour & Post Pour As built Drawings to department clients
Verify and ensure the survey measurements & dimensions for concrete outline rebar works
Preparation & dispute of Pre pour and Post pour as built drawings, *Create & submission of Volumes-Quantities for Earthworks (Deep and large Excavation & Backfilling & Stockpiles
Surveying works and technical assistance for high rise buildings, each building consisted of 12 and 22 floors and handled the entire project independently
Selected Achievements and Career Highlights:
Assisted the project team in finishing the project as per the target date by working on both the buildings simultaneously
AL HAMRA CONSTRUCTION COMPANY, RAS AL KHAIMAH, UAE Jun 2010 – Feb 2011
Land Surveyor
Projects:
The Mina Al Arab Residential Building Project (Ras Al Khaimah)
o16 Residential Buildings (G+5)
oThe works including Construction of the above number of building along with all related infrastructure and roads works the infrastructure, Potable water, Gravity Sewerage lines, storm water, Firefighting, irrigation and Electrical works and all related substations
Responsibilities:
Transferring Levels and Co-Ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Controls, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels, vertical and horizontal curves, fixing of embedment plates, bolts, dowels, nibs for the steel and concrete structures
Setting out of all vertical and horizontal elements of sub and super structure of the building
Leveling for Blinding, Raft, Suspended Slabs, Retaining walls, etc
Setting out for Pile points, columns, Retaining walls, Beams, Slabs sump pits, etc
Surveying works and technical assistance for housing complex which consisted of 16 residential buildings (ground + 5 floors ) including infrastructure and road works
Selected Achievements and Career Highlights:
Independently handles the entire project
CONTINENTAL CONSTRUCTION LTD, BAGHDAD, IRAQ Nov 2009 – May 2010
Land Surveyor
Projects:
Al Rusafa Water Treatment Plant (Baghdad)
oConstruction of 3 storage tank & 200m X 200m reservoir below ground level
Responsibilities:
Topographical supervision for site installations and boundary limits, *Automatic Monitoring system for full control of deep excavation movements, *Review and execution of structural & Architectural guide drawings, *Auto Drafting and creation of digital terrain models for design surfaces, *Coordination and presentation between design setting out drawings & guide drawings,
Surveying works and technical assistance for water reservoir project which consisted of three huge underground storage tanks
Selected Achievements and Career Highlights:
Working in harsh conditions and assisting the project team to complete project on time
AL NABOODAH/GROUP FIVE CONSTRUCTION(UAE), DUBAI, UAE Jun 2008 – Sep 2009
Land Surveyor
Projects:
Aluminum Smelter Complex (EMAL)/ UAE
oConstruction of Anode Storage Building, Anode Baking Furnace Building and Fume Treatment Centre
Responsibilities:
Marked columns, slab edges and walls at every stage of work; handled layouts, levels, and take out points of concrete piles, structure columns, footings, grade beams, piles caps, retaining walls, and roof slabs
Established elevations for structural elements and controlled leveling of earthwork; controlled layout of concrete blocks walls, electrical and plumbing utilities points, etc
Supervised construction, assisted with inspections; prepared as-built drawings, marked them after casting, and ensured civil works were as per drawings
Checked HCM and shifted coordinates to TBM pillars
Conducted topographical surveys; handled line out for grading activities; located workshops as per drawings; performed layout for footing excavations; set out anchor bolts with micrometer accuracy
Calculated excavation quantities with AutoCAD and Excel; prepared subcontractor excavation bills
Surveying works and technical assistance for worlds largest aluminium smelter complex, area of works included anode baking furnace building and fume treatment center
Selected Achievements and Career Highlights:
Provided high accuracy (micro milli accuracy ) setting out for fixing of anchor bolt as per the exact requirement with zero error
PIONEER SURVEYOR(INDIA), KOLKATTA, INDIA May 2000 – Jun 2008
Survey Team Leader
Projects:
Durgapur Express-way (N.H-2) in West-Bengal, 48 km
2000 mw Subansiri Lower Hydroelectric Project
Survey Report for Dam Break Study of Brahmaputra River (650 km)
DPR For NW-1, Patna to Farakka on river Ganjas
Responsibilities:
Surveying works and technical assistance for 48 KM expressway project, 2000 Mega Watt hydro electric power project
Selected Achievements and Career Highlights:
Assisted team in completing the project on time and as per the schedule
Professional Certifications/ Courses/ Training
1996 National trade certificate(I.T.I), Siliguri ITI college
Education
1994 West Bengal Board Higher Secondary Education (10+2)