Post Job Free
Sign in

Project Water Treatment

Location:
Fereej Ibn Dirhem, Qatar
Salary:
10000
Posted:
June 07, 2020

Contact this candidate

Resume:

Apu Kundu

Mobile: +974-****-**** Email Address: addn4c@r.postjobfree.com

Date of Birth:5th October 1973,Language:English,Hindi,Bengali

LinkedIn Profile: linkedin.com/in/apu-kundu-3583a732

Nationality-Indian/:Work Visa: Qatar Work-Permit-I.D NO:27335632874l Availability: 45 days

Professional Summary

Senior Land Surveyer with 24years proven experience in industries relating but not limited to Construction, infrastructure, hydropower, irrigation, highway, expressway and transmission lines.

Diverse professional exposure in international settings across India, Sri Lanka, Iraq, UAE, Saudi Arabia and Qatar.

Notable successes in operating various instruments such as Total station, GPS, level instrument and strong expertise in software such as AUTOCAD, MS excel and MS word.

Proven abilities in working with high-performing and cross-functional teams in the delivery of multiple concurrent projects in fast-paced and dynamic environments.

An effective communicator with an excellent ability to engage stakeholders across all levels and a robust track record in implementing systematic processes that ultimately brings about sustainable business growth and achieve organizational KPIs.

Areas of Expertise

AutoCad

MS Excel

MS Word

Land Surveying Works

GPS

Level Instruments

Total Station

Stakeholder Management

Strategic Leadership

Team Supervision & Development

Detail-oriented

Effective Communication

Career History

QATAR BUILDING COMPANY (Q.B.C), DOHA, QATAR Feb 2014 – Present

Senior Land Surveyor

Projects:

GTC 299 AND GTC 269 (Al Wukair RPS Pipeline / Water Reservoir)

oWater Reservoir (4 nos), 8 km Road, 35 km Pipe line& Substation

Doha Metro Rail Major Stations Project, (Green Line)

oConstruction of Education City under Ground Metro Station

Road and Infrastructure in Al Saliiya-North of Salwa Road (DW013)

oConstruction of 28 Km Road with 6 no's Roundabout and median barrier, kerb stone, Drain etc.

oConstruction of 9.4 km Sewer Line, 11 km Ground Water line & 5.050 km TSE Line with Manholes etc.

oReporting to the Project Manager

Responsibilities:

Survey terrain, prepare accurate schematic sketches and reviewed collected data

Plan, monitor and coordinate ground surveys, operate and maintain map reading equipment and tools

Being in charge of making standards for special project to improve QA/QC survey works and as built drawings

Supervise setting out works to construct as per construct ability drawings incorporate with site work instruction

Site investigation for existing underground and ground services and giving proper solution to progress and approve service clearance inspection report for construction

Supervise the establishment of control point from the primary control points for project and site survey works as per shop drawing & specifications

Check the alignment & elevation of road setting out & other service lines

Alignment to excavation, formation, pipelaying (sewer storm-potable-irrigation water) manholes short pieces level installation, chambers (house connection catch basin, art works cut fill. Road base & Sub-base & Asphalt works-crab stone works

Evaluation and substantial experience in volume calculations with profaned design & site data

Provide consultancy and getting inspected and approvals for survey inspections for various activities before concrete pour

Deliver surveying works and technical assistance for infrastructure utilities, pump station, substations, road works and Qatar rail project

Manage CAD technician, survey team

Selected Achievements and Career Highlights:

Achieving targets and finishing works on time

ARABUILCO CONSTRUCTION, BAGDAD, IRAQ, ERBIL, IRAQ Jun 2013 – Feb 2014

Land Surveyor

Projects:

Arbill mass city project

o10 nos Residential Buildings (G+5)

oInfrastructure and roads works the infrastructure work executed Potable water, Gravity Sewerage lines, storm water, Firefighting, irrigation and Electrical works and Electrical substations and land landscaping

Responsibilities:

Site execution and arrangements and Co-ordination with the Engineers, QA/QC, and getting inspected and approvals for survey inspections for various activities before concrete pour

Reviewing of all Construction – Concrete body plans, Architectural drawings etc. to clarify if any missing or conflicting details. To solve the issues and provide the correct, approved details and drawings to the construction team and ensure job is performed in smooth and approved manner

Transferring Levels and Co-ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Control, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels

Important Grid & coordinates marking for the building & foundation using Total Stations

Review blueprints & legal deeds survey area detail. Marked columns, footing, Grade beams, piles cap, retaining walls and roof slabs

Surveying works and technical assistance for high rise building works

Supervise 1 assistant

Selected Achievements and Career Highlights:

Completion of project on time and independently handled the complete project

KEC INTERNATIONAL, COLOMBO, SRILANKA Dec 2012 – Jun 2013

Survey Officer

Projects:

New Galle Transmission Development Project

oConstruction of 40Km Ambalangoda to Galley 132kv (DC) Transmission Line

Responsibilities:

Surveyed terrain, prepared accurate schematic sketches and reviewed

Performed alignment surveys, detail surveys, and profile drawings

Checked surveys and fixed tower locations, and Tower Spotting; determined angle points and marked pits; supervised foundation work

Performed primary and final topographical surveys for partition of transmission lines; prepared comparative route alignments and determined most economic route; prepared ground profile after detail survey to finalize tower quantities; checked survey according to profile and spotted towers prior to initiation of civil work

Handled contouring in hilly terrain by finalizing leg/chimney extensions

Surveying works and technical assistance for high voltage transmission line

Supervised 1 assistant

Selected Achievements and Career Highlights:

Handled work independently and assisted in selecting the more economical route for laying of high voltage transmission line by reducing the cost

SHAPOORJI PALLONJI INTERNATIONAL FZE, RIYADH, KSA Feb 2011 – Dec 2012

Land Surveyor

Projects:

King Abdullah Financial District (KAFD)/SAUDI ARABIA

oThe Project calls for Construction of four mixed used Buildings. The maximum height of building is 12 & 22 story and located in KAFD Parcel 4.11 & 4.12 at king Abdullah Financial District. And 4 Basement level below grade level contain 300,000 sf and accommodate approximately 673 cars above grade the building contains 375000sqf. And includes office, residential and retail function. The building Maxima height 70 meters /160 meters

Responsibilities:

Transferring Levels and Co-Ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Controls, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels, vertical and horizontal curves, fixing of embedment plates, bolts, dowels, nibs for the steel and concrete structures

Setting out of all vertical and horizontal elements of sub and super structure of the building

Setting out for Pile points, columns, Retaining walls, Beams, Slabs sump pits, etc

Setting out for Curve wall, grid Line etc

Leveling for Blinding, Raft, Suspended Slabs, Retaining walls, etc

Benchmark carrying and Verticality checks

Site execution and arrangements and Co-ordination with the Foreman’s, Engineers, QA/QC

Consultants and getting inspected and approvals for survey inspections for various activities

Preparation and submittal of Pre pour & Post Pour As built Drawings to department clients

Verify and ensure the survey measurements & dimensions for concrete outline rebar works

Preparation & dispute of Pre pour and Post pour as built drawings, *Create & submission of Volumes-Quantities for Earthworks (Deep and large Excavation & Backfilling & Stockpiles

Surveying works and technical assistance for high rise buildings, each building consisted of 12 and 22 floors and handled the entire project independently

Selected Achievements and Career Highlights:

Assisted the project team in finishing the project as per the target date by working on both the buildings simultaneously

AL HAMRA CONSTRUCTION COMPANY, RAS AL KHAIMAH, UAE Jun 2010 – Feb 2011

Land Surveyor

Projects:

The Mina Al Arab Residential Building Project (Ras Al Khaimah)

o16 Residential Buildings (G+5)

oThe works including Construction of the above number of building along with all related infrastructure and roads works the infrastructure, Potable water, Gravity Sewerage lines, storm water, Firefighting, irrigation and Electrical works and all related substations

Responsibilities:

Transferring Levels and Co-Ordinates, Control Points to the Site locations, planning and conducting Horizontal and vertical Controls, fixing of plot limits, property boundaries, grid pillars, center lines and alignment for tower cranes. Setting out of piles, cutoff levels, vertical and horizontal curves, fixing of embedment plates, bolts, dowels, nibs for the steel and concrete structures

Setting out of all vertical and horizontal elements of sub and super structure of the building

Leveling for Blinding, Raft, Suspended Slabs, Retaining walls, etc

Setting out for Pile points, columns, Retaining walls, Beams, Slabs sump pits, etc

Surveying works and technical assistance for housing complex which consisted of 16 residential buildings (ground + 5 floors ) including infrastructure and road works

Selected Achievements and Career Highlights:

Independently handles the entire project

CONTINENTAL CONSTRUCTION LTD, BAGHDAD, IRAQ Nov 2009 – May 2010

Land Surveyor

Projects:

Al Rusafa Water Treatment Plant (Baghdad)

oConstruction of 3 storage tank & 200m X 200m reservoir below ground level

Responsibilities:

Topographical supervision for site installations and boundary limits, *Automatic Monitoring system for full control of deep excavation movements, *Review and execution of structural & Architectural guide drawings, *Auto Drafting and creation of digital terrain models for design surfaces, *Coordination and presentation between design setting out drawings & guide drawings,

Surveying works and technical assistance for water reservoir project which consisted of three huge underground storage tanks

Selected Achievements and Career Highlights:

Working in harsh conditions and assisting the project team to complete project on time

AL NABOODAH/GROUP FIVE CONSTRUCTION(UAE), DUBAI, UAE Jun 2008 – Sep 2009

Land Surveyor

Projects:

Aluminum Smelter Complex (EMAL)/ UAE

oConstruction of Anode Storage Building, Anode Baking Furnace Building and Fume Treatment Centre

Responsibilities:

Marked columns, slab edges and walls at every stage of work; handled layouts, levels, and take out points of concrete piles, structure columns, footings, grade beams, piles caps, retaining walls, and roof slabs

Established elevations for structural elements and controlled leveling of earthwork; controlled layout of concrete blocks walls, electrical and plumbing utilities points, etc

Supervised construction, assisted with inspections; prepared as-built drawings, marked them after casting, and ensured civil works were as per drawings

Checked HCM and shifted coordinates to TBM pillars

Conducted topographical surveys; handled line out for grading activities; located workshops as per drawings; performed layout for footing excavations; set out anchor bolts with micrometer accuracy

Calculated excavation quantities with AutoCAD and Excel; prepared subcontractor excavation bills

Surveying works and technical assistance for worlds largest aluminium smelter complex, area of works included anode baking furnace building and fume treatment center

Selected Achievements and Career Highlights:

Provided high accuracy (micro milli accuracy ) setting out for fixing of anchor bolt as per the exact requirement with zero error

PIONEER SURVEYOR(INDIA), KOLKATTA, INDIA May 2000 – Jun 2008

Survey Team Leader

Projects:

Durgapur Express-way (N.H-2) in West-Bengal, 48 km

2000 mw Subansiri Lower Hydroelectric Project

Survey Report for Dam Break Study of Brahmaputra River (650 km)

DPR For NW-1, Patna to Farakka on river Ganjas

Responsibilities:

Surveying works and technical assistance for 48 KM expressway project, 2000 Mega Watt hydro electric power project

Selected Achievements and Career Highlights:

Assisted team in completing the project on time and as per the schedule

Professional Certifications/ Courses/ Training

1996 National trade certificate(I.T.I), Siliguri ITI college

Education

1994 West Bengal Board Higher Secondary Education (10+2)



Contact this candidate