Debabrata Ghosh
Mobile: 099********~ E-Mail: addmzk@r.postjobfree.com
MIDDLE MANAGEMENT PROFESSIONAL
Knowledgeable and dedicated professional targeting assignments in Operations Management with an organization of high repute
PROFILE SUMMARY
A dynamic professional with nearly 12 and half years of experience in:
Power Plant O&M Site Engineering Project Management
Operations Management Safety Management Installation & Commissioning
A BEE certified energy Auditor
Identified as a technical star in Vedanta Recourses PLC
A Commissioning Expert and Performed responsibility as Project Manager for EPC Greenfield Projects, for Baseline and Micro Planning, Engineering & Construction Management, Contract Management, Scope Management and Risk Management while closely associated with Procurement, Vendor Development and Quality Control functions.
Well-developed contractual/legal communication skills with capability of understanding & interpretation of Commercial, Legal, Administrative, Financial and Technical aspects of capital intensive industrial Projects
Hands on expertise in MS Office and SAP
Posses Good Knowledge on IMS,AMS and All internal audit framework. Auditor of IMS.
Managing all regulatory function in work area.
Skilled in managing a wide spectrum of machinery, equipment & utilities, while curtailing the operational costs & expenses
Adopting pragmatic approach in improving project efficiency by using available resources and installing suitable instruments as per requirement
Expertise in handling the power plant activities involving resource planning, in-process inspection, team building and co-ordination with internal / external departments
Proficiency in handling the operations & maintenance of various equipment for reducing downtime and enhancing operational effectiveness
Demonstrated excellence in developing & streamlining systems with proven ability to enhance operational effectiveness
Analytical, meticulous and quality-oriented professional with an eye for detail
CORE COMPETENCIES
Energy Audit
O&M,Project management & Commissioning
Planning and effectuating predictive & preventive maintenance schedules for various equipment to increase machine uptime and reliability
Ensuring timely execution of sustainability projects and compliance of quality standards
Identifying areas of bottlenecks/ breakdown and taking steps to rectify the same through troubleshooting tools like Root Cause Analysis
Overseeing various activities to ensure completion of work within the time & cost parameters and effectively utilizing the resource to maximize the output
Performing commissioning work of equipment, modifications and major repairs to improve efficiency by fault-finding
Carrying out planning, estimation, scheduling & preparation of drawings and ensuring timely execution of projects
Reviewing & monitoring the progress of project with the end users for ensuring completion within the scheduled time and cost parameters
ORGANISATIONAL EXPERIENCE
Joined group 2007 in BALCO(4*)67.5MW as GET
Joined Vedanta Limited in 2008 in erection & commissioning in 600MW
From 2008 November to 2009 December in water crisis management and BTG(135MW*9)&water system commissioning
January ‘09 to January’10 Desk Charge Engineer in Main plant
February ‘2010 to October’2010 Assistant Shift In charge in Main plant
November’2010 to 2014 December Shift Charge Engineer in Main Plant
January’15 to Mar’17 Phase1(5*135MW) In charge in BTG operation & BOP Operation(Oil inventory management and oil handling operation, Black Start DG operation, Compressor Operation)
From Apr’17 to present Head BTG (9*135 MW)and additional responsibilities in Infra Development
Overall business Excellence CO- ordinator
Vedanta Sustainability Assurance Program coordinator
Key Result Areas:
Accountable for power management functions and operational management
Resources planning and budgeting
Performance & Efficiency monitoring
Cost drive measures in non coal cost
Business planning and tracking the results with action plan
Ensuring stable & efficient operations and maximum availability at the unit
Ascertaining safety during day of 135*9MW overall BTG Unit and BOP
Maintaining coordination with State Load Dispatch Center for load scheduling functions
Ensuring safe running of 135 MW power units, cold, warm & hot light-up, turbine rolling and synchronization
Managing different emergency of 407 TPH/137.3kg/cm2/537oc/tangential coal/PF boiler and super-high pressure, primary reheating, extraction and condensing steam turbine & it’s auxiliary
Involved in post black-out power restoration of units during grid failures as Unit In-charge
Responsible for house load operations during major generation shedding at Islanded Condition & Resynchronize Unit
Root cause analysis for all failures
Safety audit and safety parameters tracking
Major Assignments Handled:
600MW boiler commissioning
135 MW Pulverized Fuel Fired Power Plant Unit for Fuel Handling System & Boiler and Turbine as Operations Field Engineer
DCS operation of 9x135 MW Power Plant Unit for Different Parameters of Boiler, Turbine, Generator, Transformer and 220KV Switchyard as Desk Operations Engineer
Commissioning of Boiler Auxiliaries, Chemical Cleaning of Boiler & Turbine, Steam Blowing and Reliability Run of 135MW Unit in 9*135MW Jharsuguda Project
Oil inventory Reduction and Co-incineration of Anode Butt
Achieved Auxiliary power reduction from 9.81% to 9.51(Awarded CEO Kitty)
Heat rate Improved 2451 gm/KWHR to 2412 gm/KWHR
Drive to achieve JUSE certification in 5S
Stack emission reduction to below 100 mg/NM3(awarded CEO kitty) in year 2009
Reduction of specific steam consumption from 3.3 kg/kwh to 3.15kg/Kwh
Unaccounted Loss Reduction 32 Kcal to 12 kcal
Blackout time reduction by innovative approach
System reliability improvement by governor tuning (SOLVINA)
SOC Reduction by initial preheat of water 0.15ml/kwh to 0.08 ml/kwh
Development of SOP for operational activities in BTG
Biomass firing in bowl mill with all precautionary measures
Online water pipe line leakage arresting job inside river
Major Projects Handled:
Boiler, Water system erection & commissioning
Reduce Stack Emission Less than 50mg/m3 from more than 450mg/m3 as an Project Manager
Reduce Specific Steam Consumption of 0.13t/Mwh as a Leader
Dry Flue Gas Loss Reduction Project whereby DFGET reduced from 144 dgc to 136 dgc
Six Sigma Project on Specific Auxiliary Power Consumption Reduction
Compressed Air power Reduction significantly in the system
Biomass Firing to meet renewable power obligation
HFO to LDO conversion and heat energy saving
CERTIFICATIONS
Green Belt in Six Sigma
BEE Energy Auditor
TRAININGS
Attended the following:
oTraining on Efficiency Calculation of Boiler at NPTI Farakka
o210 MW Simulator Training for 2 weeks at Bakreswar Thermal Power Plant in 2006
oSix Sigma Training Program for Green Belt & Yellow, Black
oSafety training by ERM
IT SKILLS
Conversant with:
oMS Office (Word, Excel & PowerPoint)
oSAP and Internet Applications
EDUCATION
2007 B.Tech. (Power Engineering) from National Power Training Institute, Durgapur, WB University of Technology with 76.6%
PERSONAL DETAILS
Date of Birth: 30th April, 1986
Present Address: Ha/103,Hati Block, Vedanta Township, jharsuguda-768201,Odisha
Languages Known: Bengali, English and Hindi