Post Job Free

Resume

Sign in

Engineer Assistant

Location:
Salem, Tamil Nadu, India
Salary:
30000
Posted:
June 05, 2020

Contact this candidate

Resume:

CURRICULUM

VITAE

V.PARTHIPAN

Designation :Engineer(Production)

E-mail :addmrg@r.postjobfree.com

Mobile :+919*********

Nearly8yearsofextensiveexperienceintheareasofmanufacturingEngineering,Productionplanning andexecutioncapability.

ThoroughknowledgeinProductionplanning/assemblyofautoancillaryparts.

ExperiencedinimplementationofTQMpractices,QMS,TPSandPOKA-YOKE

CurrentlyservinginSundramFastenersLtd,Hosuras–PRODUCTION-ENGINEER Experiencesummary:

Organization

Noofyears

experienced

Areaofexpertise

PRESENTEMPLOYER:

SundaramFastenersLimited

7+yearsPresent

employer

•Productionplanning&SchedulethroughSAP

•Dailyvalue&Priority

• Machineloadingplan

•Vendormanagement

•Inventorymanagement

•DispatchPlanning

•Production

•Productivityimprovement

•TQM

•QCC/QIT

•Costreduction

PastEmployer:

SundaramFastenersLimited

11/2years(Technical

Assistant)

•Production&Quality

•CNC&VMCOperating

• TeamLeader

SinceDec2017inSundaramFastenersLtdasexecutive-PRODUCTIONEXECUTIVE

(54Croresturnover)forProcessplanningandmanufacturingofautoancillaryparts. GroupStartedin1966,hasgrownintoagloballeader,manufacturingcritical,highprecisioncomponentsforthe automotive,infrastructure,windmillandaviationsectorswithvariedrangeofproducts SFLMFDmanufacturesPowdermetallurgy,coldextrudedandprecisionforgedpartsfortwowheelers& hydraulicpumpcomponentsforfarmingequipment.

Astrong,50yearsoldplanthasmanyplantsincludingthemotherplantatChennai.

Teamincludes06executivesaround50non-executivemembers Summary:

“PRODUCTIONPLANNINGCONTROL“

CoreCompetency

Productionschedule&InventorycontrolthroughMRPsystem(SAP)

EstablishingTPSasperthecustomerrequirements

Productionprioritizationforprimarymachinesandsecondarymachines.

Capabilitytodevelopvendorsforchallengingproductswithhighaccuracy.

Documentationofproduction/wipreports

MonitoringWIP-RMvsproductionvsdispatch

Customercommitmentswithontimedelivery

PLANNING

WorkedalongwithmarketingteamfornextyearBusinessplanandworkoutcapacitycalculation.

CoordinationwithpurchasewithwipstatusforRMplanning.

Capacitycalculationandcontingencyplanning

Productionordercreation,vendorPOcreationthroughSAP. Highlights

Achieved65%to96%customerscheduleadherencewitheffectiveplanningandavailablecapacity.

Successfullymetthefulllinecapacitybyimplementingvariouskaizens&linebalancing.

ThisProjectsresultsinannualturnoverof54crores

Costsavedupto20lakhs/annumbyreducingthemachiningvendorsanddevelopinginhousefacility.

Reducedinventorydays24to11daysthroughMRP.

Successfullymaintained98%accuracyofSAPstockvsactual. SAPactivities

Productionschedule&confirmation

RMavailability&controlthroughMRP

WIPmonitoring&quality

5Daysinventorymaintainedatvendor

Productwisereport

Production/inventorylockthroughMRP

Stagewiseproductionconfirmation

EnsureGRNpostingtoqualityconfirmation.

Alldatadownloadtoexcel.

ReportsforMIS(tonnage/value/qty)

Phy.inventoryverifiedwithSAPstock

Employer :M/sSUNDARAMFASTENERSLTD,HOSUR

PositionHeld :Engineer–Production

Period :07.12.2012ToTillDate

Responsibilities:

Responsibleforachievingproductiontarget.

Responsibleforrejectioncontrol,consumablecontrolandsystemscompliance.

Planningofmonthlyproductiontargetsandmonitoringproductiononaday-to-daybasis.

Tocoordinatewithplanningdepartmentformaximumutilizationofmanandmachine.

Toolsparesplanningasperreduirement.

Troubleshootingindaytodayactivities.

Facilitatingassemblytools&fixturefornewproduct

ProfessionallyManaging70peopletoachievethetargetthroughtraining,motivatingandguiding theminsystematicmannerandtogetproperQualityoutput.

Managing&balancingmanpowertoimproveproductivity,qualityandwastereduction.

ProjectleaderforTPM(Totalproductivemaintenance)inthemoduleforoptimumutilizationof man,machineandmaterialsandtokeepthenonvalidactivityasminimumaspossible.

Problemanalysistorectifyby7QCtools.

ImplementationTeammemberforimprovementsthroughJIT,Kanban,singlepieceflow,Kaizen,Lean, Pokeyoke,cycletimereduction,Linebalancing,5s.

Goodexperienceandworkingknowledgeinallkindofconventionalmachinesandpowdermetrology.

Goodknowledgeindispatchplanningandcompletemonthlyturnoverinshorttime. Employer :M/sSUNDARAMFASTENERSLTD,HOSUR

PositionHeld :TechnicalAssistant–Production

Period :25.04.2011To24.10.2012

Responsibilities:

Responsibleforachievingproductiontarget.

Responsibleforday-to-dayRawmaterialarrangement.

Day-to-Dayproductionoutput.

CNC-VMC-DRILLINGallmachineoperating.

TroubleshootingandcorrectionofprobleminCNCshop.

Preparingdailyrejectionreviewreportandcorrectiveaction.

Toolsparesplanningasperrequirement.

TRAINING:

Leadershipskills.

TPM&TQM.

HeatTreatmentprocesses.

Interpersonalskillsplanning&execution.

Improvingproductivitythroughleansolutions

Safetyworkandenvironment.

7Qctools

ISO14001:2004–EMS

Assertivecommunication&businesscommunication.

EducationalQualification:

Qualification Specialization Yearofcompletion %

DiplomainMechanicalEngineeringin

RajajiInstituteofTechnology,Salem Mechanical 2011 73.54% SSLCFromGovtHrSec

School,Chinnaseeragapadi,

Salem

10th 2006 48.4%

Computerproficiency

WINDOWS,MS–OFFICE,SAPVERSION6

Personalprofile

Father’sname :P.Venkatesan

Sex :Male

DateofBirth :29.06.1990

MaritalStatus :Married

PermanentAddress :5.287/5.47Periyamariyammamkovilstreet, Chinnaseeragapadi,salem636308

Languagesknown :English,Tamil

Declaration:

Iherebydeclarethattheinformationfurnishedaboveistruetothebestofmyknowledge Place:

Date : (Parthipan.V)



Contact this candidate