CURRICULUM
VITAE
V.PARTHIPAN
Designation :Engineer(Production)
E-mail :addmrg@r.postjobfree.com
Mobile :+919*********
Nearly8yearsofextensiveexperienceintheareasofmanufacturingEngineering,Productionplanning andexecutioncapability.
ThoroughknowledgeinProductionplanning/assemblyofautoancillaryparts.
ExperiencedinimplementationofTQMpractices,QMS,TPSandPOKA-YOKE
CurrentlyservinginSundramFastenersLtd,Hosuras–PRODUCTION-ENGINEER Experiencesummary:
Organization
Noofyears
experienced
Areaofexpertise
PRESENTEMPLOYER:
SundaramFastenersLimited
7+yearsPresent
employer
•Productionplanning&SchedulethroughSAP
•Dailyvalue&Priority
• Machineloadingplan
•Vendormanagement
•Inventorymanagement
•DispatchPlanning
•Production
•Productivityimprovement
•TQM
•QCC/QIT
•Costreduction
PastEmployer:
SundaramFastenersLimited
11/2years(Technical
Assistant)
•Production&Quality
•CNC&VMCOperating
• TeamLeader
SinceDec2017inSundaramFastenersLtdasexecutive-PRODUCTIONEXECUTIVE
(54Croresturnover)forProcessplanningandmanufacturingofautoancillaryparts. GroupStartedin1966,hasgrownintoagloballeader,manufacturingcritical,highprecisioncomponentsforthe automotive,infrastructure,windmillandaviationsectorswithvariedrangeofproducts SFLMFDmanufacturesPowdermetallurgy,coldextrudedandprecisionforgedpartsfortwowheelers& hydraulicpumpcomponentsforfarmingequipment.
Astrong,50yearsoldplanthasmanyplantsincludingthemotherplantatChennai.
Teamincludes06executivesaround50non-executivemembers Summary:
“PRODUCTIONPLANNINGCONTROL“
CoreCompetency
Productionschedule&InventorycontrolthroughMRPsystem(SAP)
EstablishingTPSasperthecustomerrequirements
Productionprioritizationforprimarymachinesandsecondarymachines.
Capabilitytodevelopvendorsforchallengingproductswithhighaccuracy.
Documentationofproduction/wipreports
MonitoringWIP-RMvsproductionvsdispatch
Customercommitmentswithontimedelivery
PLANNING
WorkedalongwithmarketingteamfornextyearBusinessplanandworkoutcapacitycalculation.
CoordinationwithpurchasewithwipstatusforRMplanning.
Capacitycalculationandcontingencyplanning
Productionordercreation,vendorPOcreationthroughSAP. Highlights
Achieved65%to96%customerscheduleadherencewitheffectiveplanningandavailablecapacity.
Successfullymetthefulllinecapacitybyimplementingvariouskaizens&linebalancing.
ThisProjectsresultsinannualturnoverof54crores
Costsavedupto20lakhs/annumbyreducingthemachiningvendorsanddevelopinginhousefacility.
Reducedinventorydays24to11daysthroughMRP.
Successfullymaintained98%accuracyofSAPstockvsactual. SAPactivities
Productionschedule&confirmation
RMavailability&controlthroughMRP
WIPmonitoring&quality
5Daysinventorymaintainedatvendor
Productwisereport
Production/inventorylockthroughMRP
Stagewiseproductionconfirmation
EnsureGRNpostingtoqualityconfirmation.
Alldatadownloadtoexcel.
ReportsforMIS(tonnage/value/qty)
Phy.inventoryverifiedwithSAPstock
Employer :M/sSUNDARAMFASTENERSLTD,HOSUR
PositionHeld :Engineer–Production
Period :07.12.2012ToTillDate
Responsibilities:
Responsibleforachievingproductiontarget.
Responsibleforrejectioncontrol,consumablecontrolandsystemscompliance.
Planningofmonthlyproductiontargetsandmonitoringproductiononaday-to-daybasis.
Tocoordinatewithplanningdepartmentformaximumutilizationofmanandmachine.
Toolsparesplanningasperreduirement.
Troubleshootingindaytodayactivities.
Facilitatingassemblytools&fixturefornewproduct
ProfessionallyManaging70peopletoachievethetargetthroughtraining,motivatingandguiding theminsystematicmannerandtogetproperQualityoutput.
Managing&balancingmanpowertoimproveproductivity,qualityandwastereduction.
ProjectleaderforTPM(Totalproductivemaintenance)inthemoduleforoptimumutilizationof man,machineandmaterialsandtokeepthenonvalidactivityasminimumaspossible.
Problemanalysistorectifyby7QCtools.
ImplementationTeammemberforimprovementsthroughJIT,Kanban,singlepieceflow,Kaizen,Lean, Pokeyoke,cycletimereduction,Linebalancing,5s.
Goodexperienceandworkingknowledgeinallkindofconventionalmachinesandpowdermetrology.
Goodknowledgeindispatchplanningandcompletemonthlyturnoverinshorttime. Employer :M/sSUNDARAMFASTENERSLTD,HOSUR
PositionHeld :TechnicalAssistant–Production
Period :25.04.2011To24.10.2012
Responsibilities:
Responsibleforachievingproductiontarget.
Responsibleforday-to-dayRawmaterialarrangement.
Day-to-Dayproductionoutput.
CNC-VMC-DRILLINGallmachineoperating.
TroubleshootingandcorrectionofprobleminCNCshop.
Preparingdailyrejectionreviewreportandcorrectiveaction.
Toolsparesplanningasperrequirement.
TRAINING:
Leadershipskills.
TPM&TQM.
HeatTreatmentprocesses.
Interpersonalskillsplanning&execution.
Improvingproductivitythroughleansolutions
Safetyworkandenvironment.
7Qctools
ISO14001:2004–EMS
Assertivecommunication&businesscommunication.
EducationalQualification:
Qualification Specialization Yearofcompletion %
DiplomainMechanicalEngineeringin
RajajiInstituteofTechnology,Salem Mechanical 2011 73.54% SSLCFromGovtHrSec
School,Chinnaseeragapadi,
Salem
10th 2006 48.4%
Computerproficiency
WINDOWS,MS–OFFICE,SAPVERSION6
Personalprofile
Father’sname :P.Venkatesan
Sex :Male
DateofBirth :29.06.1990
MaritalStatus :Married
PermanentAddress :5.287/5.47Periyamariyammamkovilstreet, Chinnaseeragapadi,salem636308
Languagesknown :English,Tamil
Declaration:
Iherebydeclarethattheinformationfurnishedaboveistruetothebestofmyknowledge Place:
Date : (Parthipan.V)