Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Jizan, Saudi Arabia
Posted:
June 04, 2020

Contact this candidate

Resume:

CONTACT INFORMATION

Mobile: 009**-*********

Age: 25(12-03-1995)

Email: addlym@r.postjobfree.com

Nationality: Pakistani

I HAVE TRANSFERABLE IQAMA

WORK EXPERIENCE

* ***** ******** ***** ******, KSA:

ELECTRICAL SUPERVISOR

JRUP (Jizan Refinery Utility Project)

CONTRACTOR: HITACHI (JAPAN)

Location: Baish, Jizan, Saudi Arabia

Roles & Responsibilities:

Ensure day-to-day planning, preparation and

executing of the commissioning work according to

company best practice and according to the

Project.

Contribute to a HSE minded and goal oriented

commissioning organisation.

Contribute to plans/ schedules, procedures,

routines and work processes for commissioning.

Identify and follow up risks and opportunities

related.

Contribute and prepare procedures and work

instructions used during commissioning.

Assist to secure sufficient training and

development of personnel within the

commissioning organisation.

Ensure that equipment installed, commissioned

and tested according to the contract.

Participate as an active member of the

Commissioning Team.

Reports to Commissioning Manager and

Commissioning lead.

2 Jamshoro Power Company Limited (GENCO-I):

ELECTRICAL SUPERVISOR

Field: Power/Energy

CAPACITY: 880 MW Thermal Power Plant

1 X 250 MW MUTSUI (JAPAN)

3 X 210 MW HARBIN (CHINA)

Location: Jamshoro, Pakistan

Roles & Responsibilities:

Maintenance of various electrical devices (motor, transformer, switchgear, circuit breaker etc)

Load calculation as per Electrical Equipment

Sizing of Power Cables for electrical loads such as lighting, receptacles, motors, etc

Designing grounding system as per standards

Sizing of conduits with acceptable fill ratios

Following the health and safety procedures

Aided the technical team with the development of as- built drawings

Assemble panels (Distribution boards, Motor Control Panels, Switchgears, relays) for various electrical loads

Assemble of motor starters and protection of various electrical equipment

Electrical Testing of all equipments (DIRANA test, Insulation test, Low resistance test, Primary current injection test, Di-electric withstand test, Solo Run Test)

VFDs for motors (Fans, etc)

Assemble of UPS System (Panels, Battery etc)

DEC 2019 – UP TO DATE DEC 2017 - DEC 2019

FARIS KHAN

1. Gas Turbine Combine Cycle

Operation

2. Boiler Turbine Generator Operation

(BTG)

3. Maintenance and troubleshooting of

all equipments

4. Circuit breakers (vacuum, air etc) 5. HSE & PTW-LOTO PROCEDURE 6. Protection of electrical & mechanical

equipments

7. Potential & Current Transformers 8. Electrical layouts & drawings 9. Install & Start-up of Equipments 10. Electrical Testing of Equipments

11. Transmission and distribution

Systems

12. Electrical instrumentation

B.E Electrical Engineering

From Isra University, HYDERABAD, SINDH

Final Year Project: “Cost Effective Airborne Wind Turbine Power Generation System”

Passing Year : 2016

ACADEMIC QUALIFICATIONS

AREAS OF EXPERTISE

JULY 2016 - FEB 2017

4 EASA Group Of Companies:

BUILDING MAINTENANCE ENGINEER

Field: Supply

Location: Hyderabad, Pakistan

Duration: July 2016 till Dec 2016(Part-Time)

Dec 2016 till Feb 2017 (Full Time)

Roles & Responsibilities:

Including building inspections, managing staff,

building operations.

Repair mechanical equipment as directed.

Keep a log of maintenance performed.

Electrical including bulbs/Ballast replacement,

plumbing, painting and carpentry as required.

Meet with contractors as necessary, monitor work.

Monitor all subcontracted work.

Maintain and repair machines, mechanical

equipment, and buildings.

Fix or replace faulty electrical switches, outlets, and circuit breakers.

Inspect and diagnose problems and figure out the best way to correct them.

Perform routine preventive maintenance to ensure that machines continue to run smoothly.

Assemble and set up machinery or equipment.

Plan repair work using blueprints or diagrams.

Meet with clients to estimate repairs and costs.

Keep detailed records of work.

2 Gas Turbine Power Station(GTPS):

ELECTRICAL MAINTENANCE ENGINEER

Field: Power/Energy

CAPACITY: 174MW Combined Cycle

1 X 15 MW GT CEM (France)

2 X 25 MW GT THOMSON (Holland)

2 X 25 MW GT HITACHI (Japan)

1 X 44 MW CC HARBIN (China)

Location: Kotri, Pakistan

Roles & Responsibilities:

Schedule and undertake periodic maintenance on

all electrical equipment, components, and

installations

Provide prompt response to inquiries whenever

there is a breakdown, and resolve the issue as

quickly as possible

Ensure that equipments are in good working order so as to prevent disruption of activities

Installation of fresh electrical components and

fittings

Keep record of all stock and supplies, including company’s electrical equipment

Fix and maintain lighting fixtures and fittings

Troubleshoot machine breakdowns and provide

preventive maintenance services

Supervise electrical works when new projects are undertaken

FEB 2017 - DEC 2017



Contact this candidate