CURRICULUM VITAE
GULAM-SARWAR
POST APPLY FORE : Electrical Supervisor
# *** ********* **** *********** ******* 700063, India.
Mobile- KSA: - +966-********
India: - +91-987*******
Email: addllq@r.postjobfree.com or addllq@r.postjobfree.com
OBJECTIVE
Verifying and ensuring that company Processes are being established and implemented in accordance
With Quality management System/ Integrated Management System (IMS)
To ensure that all the project specifications, applicable standards and Inspection Test Plan are implemented and are in force throughout the life cycle of the project.
EDUCATIONAL QUALIFICATION
>Diploma in Electrical Engineering.
>Jhodhpur, National, University, Rajasthan,, India year of passing 2011
>passing 10+2 Bihar examination Board Patna year 2007
International Standards
NEMA VE 1, NEMA VE 2, National Electric Code (NEC), International Electro technical Commission (IEC)
Other Technical Standards
Familiar with Saudi Aram co and SABIC Standards and Procedures.
TECHNICAL TRAINING
6 Month Training in Computer Hardware. FORM CMC INSITITU(Kolkata, India)
NATURE OF WORK:
I have good knowledge in Bus bar.
Maintenance of all electrical Equipment, Which is used in workshop in proper condition.
Modification in electrical circuit where it is required.
Every type of instrument device and maintenance device fixing.
Testing and changing motor which is used in machine ac or dc type.
Installation and maintenance of electrical panel, board and junction board and distribution board.
Cable glanding cable termination and cable trucking through cable tray and erection.
Servicing and distribution ht and it line maintain of safety.
Performing the enterior job with safety and team work.
Building, Wiring, Switch board connection, Parallel board, Bus bar connection.
Star delta connection.
MCB, ELCB breaker and rccb installation and maintenance.
All type of building wiring and plant wiring.
All type of holder maintain, lamp holder, pattern holder.
AC three Phase induction motor. And principle of induction motor.
Performing tests on the following :
a)3.8 KV SF6 & 34.5 KV Switch gear according to client procedure.
b)CT s Saturation test, Burden test Polarity test & PT Ratio test.
c)Functional test of 86 lock relay and Inter trip switchgear control circuit
d)Functional test of protection relay, GE Multiline SR 745 &750, GE 369 Feeder 94 Supervisor relay and Alstom KCGG-142 relay.
e)Functional checks of motor operator valve move rotor and limitorque
To perform cut-over of 13.8 kv SF6 oil switch and phasing check of existing
High potential test of medium voltage cable as per client standard.
Loop checking point field instrument to remote control system.
Troubling shoots of Instrument on defect.
As built of instrument loop diagram process ILD and instrument diagram P&ID
Preparation of loop package for cut over
Perform commission breaker to trip testing using of primary current injection system.
Perform and testing of power reactor limiting current 13.8 kv to 15 kv
Synchronized check and testing of steam turbine generator, and phasing check
normal power.
Replace of oil transformer and testing of winding resistance and insulation test.
As-built of electrical circuit and one line diagram as-per drawing.
Maintain the electrical equipment as required in full operation by the company.
Installation of Equipment:
a)Power lighting auxiliaries and public address system.
Installation and megger test of low voltage cable to make sure the cable no defect.
As-built of electrical and one diagram drawing.
Trouble shooting :
a)Systems including fire alarm control system
b)And inspection of wiring installation.
Maintain the electrical equipment required in full operation by the company.
Any other adhoc duties as assigned from to time.
COMPUTERS SKILLS
MS Excel, MS Word, MS Power Point, MS outlook.
Operating system: OS-win XP professional, Windows 7.
Familiar with the Electronics software Multisim 10, PLC.
GENERAL SKILLS
Very well organized and systematic.
Good knowledge about construction activities.
Excellent communication skills.
Good team building skill.
Good leadership abilities.
Good interpersonal and relation building skills.
Good at troubleshooting.
Good decision making skills.
Saudi Arabian Kentz Co. Ltd
Designation :Electrical supervisor
Natuature of work :Electrical and Instrument construction
Name of the project. :Northen Arabia unconventional Gas system -B.
Date of joining. : 13,April,2019 to 30 Nov 2019.
Designation :Electrical supervisor
Natuature of work : Electrical and Instrument Construction.
Name of the Project : Scada Saudi Aramco project in k. s. A
Date of joining :03 march 2015 to 12,April,2019.
Name of the Project : Kemya,Saudi Elastomers(Sabic project )in K.S.A
Designation : Electrical SUPERVISOR
Nature of work : Electrical and Instrument Construction.
Name of the Project : Kemya,Saudi Elastomers(Sabic project )in K.S.A
Date of Joining : 07 December To 02 March 2015.
Designation : Electrical SUPERVISOR
Nature of work : Electrical and Instrument Construction.
Name of the Project : Sadara,(Dow&Armco PROJECT) IN K.S
Date of Joining : 10 May 2014 To 15 September 2014
Designation : Electrical SUPERVISOR
Nature of work : Electrical and Instrument Construction.
Name of the Project : II R Ib nay rush fiber Optical,(SABIC PROJECT) IN K.S.A
Date of Joining : 10 June 2013 to 20 April
Designation : Electrical SUPERVISOR
Nature of work : Electrical and Instrument Construction.
Name of the Project : Manifa Core Hydrocarbon Facilities,(ARMCO PROJECT) IN K.S
Date of Joining : 22nd October-2012 to 08 June 2013
Designation : Electrical SUPERVISOR
Nature of work : Electrical and Instrument Construction.
Name of the Project : Heeded Steel Plant (SABIC) Saudi Arabia
Date of Joining : 20th June 2012 TO 20 October 2012
PREVIOUS EMPLOYERS
BLUE STAR Pvt Ltd, Kolkata (WestBangal) India
Designation :electrical engineer
Nature of work :Electrical construction
Date of joining :10,july 2011,To 15,May, 2012.
Complete Earthling system in Power Plant. Gird Earthing, Panel Earthing, Equipment earthing.
Installation of Earth Electrode.
Earth Electrode Resistance Test & Earth cable Continuity test.
Installation of Conduit System in Underground and above ground.
LV and control cable pulling.
Termination of LV and Control Cables.
Cable Testing i.e. Hi-pot Test and IR test.
Making technical query to design department regarding construction issue and confirm AFC drawings.
Co-coordinating with other Engineering department to rectify the interference for electrical installation.
Ensure the quality of site activities related to instrumentation as per project standard.
Responsibilities
Responsible in routine check of equipment, to ensure the validity of calibration.
Installation inspection of power transformer i.e. IR Test, Voltage Ratio Test, Continuity test, Polarity & Phase relationship Test, Oil dielectric Test, Oil filling & circulating. Winding/Liquid Temperature Test, Buchholz relay test, Pressure relief test, current transformer test.
Trouble shooting of all electrical systems.
Inspection during Erection and commissioning of Street lights and Lighting fixture installation
Inspection of LV and Control Cable Pulling and Termination.
Keeps log of all equipments, spare parts, circuits diagrams, special tools, and testing equipments at site.
Applying the Quality Assurance For all jobs under execution as the company Quality management system.
Preparing Purchase request to unavailable material for local purchase.
Fire Alarm system Installation and pre commissioning.
To take care about all activities related with QA/QC.
Repairing required all resources to execute work as per plan.
Inspection of installation power distribution systems.
Installation Inspection of Diesel Generator, Automation and Commissioning.
Inspection of Complete Earthing system in Power Plant. Gird Earthing, Panel Earthing, Equipment earthing.
Installation inspection of Earth Electrode
Inspection of Earth Electrode Resistance Test & Earth cable Continuity test.
Monitoring Electricians activities during the installation of electrical equipment and cabling to ensure the quality in process.
Inspection of SMPS system Installation.
Inspection of Telecom System Installation.
PERSONAL INFORMATION
Marital Status Single
Date of Birth 02nd March 1986
Father s Name Mohamed Abbas
Nationality & Religion Indian & Muslim
Total years of Experience 08, + Years .
Passport Number R8340432.
Passport Expired date 20,September 2027.
Languages Known English, Urdu, Hindi and Bengali
Skill Electrical and Instrumentation, Power Plant Construction
Industry Oil and Gas, Power, Solar Energy
Current Location Eastern Province, Saudi Arabia
TO
THE HR Manager
Sub:Job Application
It is with great enthusiasm i enclose my resume for your kind reference.I am exploring the opportunity of working as an Electrical Supervisor in your esteem organization.Review of my credentials will confirm that I am capable of serving as the catalyst for achieving quality objectives through effective contribution.I have over (5+years) experience as an Electrical Supervisor and Electrical supervisor .I Understand that working for your organization requires a candidate who is team oriented and is able to deal with people in various departments.I am confident that i possess these skills which will help me to perform the job efficiently and effectivilly. My goal is to transit my enthusiasm,creativity&experience in to a position where I continue to provide the strategic and tactical teadership critical to retaining valued customers of an organization .I am certain that my presence in your team will prove to be beneficial to your organization. As such, I would welcome an opportunity to speak with you to evaluate your needs & share my ideas.
THANKIG YOUR.
Sincerely
Gulam sarwar
Enclosed resume.