Post Job Free

Resume

Sign in

Electrical Engineer Manager

Location:
Chennai, Tamil Nadu, India
Salary:
Negotiable
Posted:
June 03, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

T.Saravana Baskar Raj

Mobile: +91-994*******, 978-***-****

Whatsup: +91-994*******

Email: addksu@r.postjobfree.com

addksu@r.postjobfree.com

POST APPLIED FOR : ELECTRICAL SUPERVISOR

OBJECTIVES

To pursue Engineering career in Erection, Installation and Commissoning Field in Engineering procurement Construction (EPC & PMC) of your esteemed organization offering scope for advancement and professional development in career and my life.

EXPERIENCE : 18 YEARS

I was working as Electrical Supervisor / Engineer with 18 years exposure in various sites Onshore, Pip Line, Oil & Gas, Refinery, Petrochemical Isocyanates and Airport projects Construction (EPC & PMC) Field Korean Organization in India, Qatar, UAE, Kuwait, Bharin and KSA.

QUALIFICATIONS

Higher Secondary Certificate - 12 Years

Diploma Electrical and Electronic Engineering. (3 Years course and Qatar Embassy attrastad)

Athorised Site Supervisor and Performer, Perives Company

Qatar Driving Licence.

PTW Card -- Adnoc, KOC and Armco.

Locout - Tag out Certificate -- Adnoc, Dow, Armco and KOC.

H2S / BA Competency Level 2 Certificate.

HES + H2S Training -- Adnoc, Armco and KOC.

MS Office etc.

WORK SUMMARY

KOC - HEISCO (EPC Company)

Abdaly - Kuwait

Position: ELECTRICAL SUPERVISOR (JULY 2016 - DECEMBER 2019)

Project Name: OIL AND GAS GATHERING CENTER - 30.

TAKREER - QCON (PMC Company)

Ruwais - Abudhabi

Position: ELECTRICAL ENGINEER (NOVEMBER 2015 - APRIL 2016)

Project Name: ADNOC RUWAIS REFINERY.

DAELIM ENGINEERING AND CONSTRUCTION CO. LTD. (EPC Korean Company)

Jubail - Saudi Arabia

Position:ELECTRICAL SUPERVISOR (JUNE 2012 – OCT 2015)

Project Name: ARAMCO SADARA ISOCYANATES.

AL- HARBI PETROLEUM AND PETROCHMICAL DIVESION (EPC Company)

Jubail - Saudi Arabia

Position: ELECTRICAL SITE ENGINEER (JUNE 2008 – JUNE 2011)

Project Name: ARAMCO OIL & GAS.

HONEYWELL (PMC Company)

DUBAI – UAE.

Position: ELECTRICAL SITE ENGINEER (JULY 2004 – JULY 2007)

Project Name: DUBAI INTERNATIONAL AIRPORT.

DODSAL ENGINEERING AND CONSTRUCTION LTD. (EPC Company)

DOHA,QATAR.

Position: ELECTRICAL SUPERVISOR (FEB 2002 – AUG 2002)

Project Name: Q-CHEM PETROCHEMICAL.

BECHTAL (PMC Company)

ABUDHABI,UAE.

Position: ELECTRICAL SUPERVISOR (April 2000 – Sep 2001)

Project Name: ADNOC BRORUGE PETROCHEMICAL.

ASHOK LEYLAND (PMC Company)

TAMIL NADU, INDIA.

Position: ELECTRICAL ENGINEER (SEPT 1992 – OCT 1997).

Project Name: HEAVY VEHICLE CONSTRUCTION PLANT.

JOB RESPONSIBILITIES

Project execution, material & man power planning with safety & quality as top most priority. Participating in project review meetings for tracking project progress.

Preparation of weekly and monthly Electrical work schedule plan report to construction all departments.

Project Scehdule, Drawing, Specification, Starnded International code and Punch list activity with HSE requirements.Walk through and Coordinate with PMT team.

Coordination with Engineering Regarding Revision Drawings and as Built Drawing.

Supervise the performance and works of sub-contractors.

Cable Tray installation Cable pulling, dressing, glanding and terminatio to Equipment, installation of Equipment and meger testing IR value.

Safety, Tool box talks, permit to work system etc.

Coordination with Civil, Mechanical and other Construction department. Ensure on timely delivery of materials without hindering construction activity to achieve overall on timely completion of project.

Preparation final RFI report submit to Electrical Manager.

Carry out inspections of incoming materials and equipment for the projects at the work site.

Coordination with QA/QC, PMT and design engineering department to ensure proper accountability of material for smooth process of handing over project & hindrance in cost recovery.

Review and comments on quality control program developed by construction Contractors.

knowledge of construction practices, economic principles, international codes, standards, procedures and specification.

Hold the complete responsibility on site materials and avoid materials waste and ensure safe handling of the site materials.

Prepare the entire site work plan and submit all site reports.

Review the overall project time schedule to follow and ensure full completion.

Preparation Construction As Built drawings.

Carry out assignments as detailed by the senior Manager/ Project manager/ Assistant project Manager.

Supervise Cable pulling, glanding and terminations of High Voltage Cables from Motor to Switchgear or Motor Control Centers as per Manuals and Specifications.

Testing and Commissioning of emergency Power Generators and Turbine Generators.

Hi-pot Testing of High Voltage Power Cables and Switchgears.

Line Checking and Meggering of Low Voltage Power and Control Cables.

Meggering of Low Voltage Motors and Space Heaters prior for Energization.

Erection, Testing, Commissioning & Maintenance of various HT & LT Electrical Equipment.

11KV & 33KV Substation work Installation, Commissioning of Power transformer 115KV/13.8KV, service transformer -13.8KV/380V,11KV/380,Vacuum Switch gear & breakers, 380v Switch gear, Transformer protection & control panel & AC & DC Distribution panel.

13.8KV switchgears, VCB 3000A, Bus bar installation.

Cable tray erection cable laying, dressing, Glanding and termination of different type and size of cables from 1.5 to 500mm sq.

Underground High voltage cable 1 500, 1 600 mm sq pulling and preparations materials.

Pulling of primary, secondary, sensor, telecommunications, low voltage, high voltage (115 KV), medium voltage (13.8 KV) and control cable.

Erection, Commissioning and maintenance of Emergency Power Generators up to 1500 KVA, Transformers up to 50 MVA and all Substation accessories.

Installation and Commissioning of Battery Banks up to 1200 AH capacity and hook up to plant control equipment.

Erection and termination of different types of panels and cable such as relay panel, mimic panel, generator control desk panel, DCS panel, PLC panel, MMC panel and etc.

Erection, testing, Commissioning, Repairs and Maintenance of Process control sub-station equipment, MCCs, switch gear panels, UPS and DBS, Field equipment HT & LT -motors, starters, air compressors, transfer pumps, transformers up to 20 MVA with OLTC controls.

Installation, Commissioning of HV, MV & LV Panels and conducting Functional trials of equipment like Motors, Starters, Switch gear, Protection relays, Utilities like UPS,DBS Panels etc.

Installation of 115 KV sub-stations yard and control room equipments.

Performing meeger testing work.

Unit substation transformer (1500KVA, 1000 KVA &500KVA) installation.

Battery and UPS installation.

Underground earthing cable installation.

Performing underground power cable laying [concrete and sand encased] for LV and MV devices.

Performing street lightning pole installation.

All kind of instrument mounting with gland and termination.

Assisting in testing, inspection and commissioning activities.

In depth reviews to verify conformance to engineering standards and specification on project till completion of construction and handing over stage. Writing inspection Reports, Worksheets, Non-Compliance Reports and making Log Book entries of on-site inspection findings and maintenance of inspection records.

Pre-commissioning activities include erection of HV, MV & LV Panels, conducting of Functional trials of equipment like Motors, Starters, Switch gear, Utilities like UPS,DBSPanels etc.

Erection and Commissioning of Emergency Power Generators, Transformers up to 5MVA and all Substation accessories.

Inspection and testing of Electrical motors, Generators, Transformers, Switches, starters and local control stations and other miscellaneous items.

Inspection and testing of high & low voltage terminations, splicing, Cable pulling operations and substation switch gear and other equipment.

Conversant in Safety regulation.

Conversant in Material specification.

Conversant in Screening of drawings.

Above all Construction and Maintainec Field in EPCM Organization.

PERSONAL DATA

Birth date: 06th July 1974

Civil status: Married

Nationality: Indian.

Language spoken: English, Tamil, Hindi, Malayalam.

DRIVING LICENCE

Qatar, India

PASSPORT DETAILS

Passport no: N0418616

Place of issue: Abudhabi

Date of issue: 14/01/2016

Date of expiry: 13/01/2026.

HOME COUNTRY ADDRESS

156, TSN Avenue, Airport Post,

Anna Nagar, Trichy- 620007,TamilNadu - India.

Phone:+91-994*******, 978-***-****

Whatsup:+91-994*******

Email: addksu@r.postjobfree.com

addksu@r.postjobfree.com

T.Saravana baskar raj



Contact this candidate