Ashar Sayeed, P.Eng, CAP, PMP
**** ****** **, ********, ** 519-***-**** addgy6@r.postjobfree.com
Profile
Project Engineering: Pipeline project’s scoping, capital estimate, scheduling, procurement, ground disturbance, construction management, OHSA Regs
Process Engineering Software/ Training: HYSYS v 8.3; HTRI; AFT Fathom, Arrow; Fisher Spec Manual CV sizing; Process Book, Consolidated Dresser PSV sizing; SPT group’s Pipeflo, Forgas; Stoner Synergee, API 520/521/2000, CSAZ662 and Gas Technology Institute’s gas distribution engineering training, Envirosim’s Biowin, AutoCad 2019, ABB x800A, Rockwell automation DCS
Experience
Production Engineer Jun. ’19- May ‘20
World Energy LLC, Hamilton, Ontario
Troubleshoot production problems with cooling towers, hot oil system, heat exchanger loops in biodiesel plant
Develop EH&S Work Instructions for site
Seek cost savings opportunities for cooling water treatment chemicals, evaporator turnarounds, cBOD reduction
Take over role of Biodiesel Quality Management Representative onsite.
Process Engineer Jan. ’19– Jun. ’19
Petrosep Corporation, Oakville, Ontario
Perform hydraulic analysis for a new CBD extraction plant
Size, specify lines, pumps, control valves and instrumentation
Develop process control narratives and shutdown key for batch production plant
Process Engineer Mar. ’16– Jan ‘19
Greenfield Ethanol, Chatham, Ontario
Developed Patented (pending) flow distribution system for patented Fluidized Bed Reactor to problems with inoperable system
Developed Patented Membrane system (pending) to confer benefits of H2 production and carbohydrate solubilization pending commercialization with the Ministry of Environment
Design, size, specify, select equipment and processes for confidential Gen2wastewater treatment demonstration scale facilities.
Manage, design and oversee construction projects (>300k$)
Troubleshoot demonstration plant problems and oversee plant operation with operations team
Develop Standard Operating Procedures (SOPs) for Gen 2 processes
Analyze and deliver solutions to observed process and mechanical deficiencies of second generation demonstration facilities
Commission process for plant system
Develop mass balances and simulations pertaining to second generation demonstration facilities
Analyze data to improve performance of demonstration plant
Prepare technical reports and deliver presentations to senior management
Pipeline and Facilities Engineering EIT/ Project Manager Jan’15-Dec’15
ATCO Gas, PMR (Plastic Mains Replacement), Calgary, Alberta
Planned, designed and managed construction of multiple pipeline and facility replacement projects (8MM+) in Red Deer, Calgary, High River, Cochrane and Okotoks gas distribution systems to conform to CSA codes, acts, company policies, city, municipal or rural standards and landowners’ requests.
Prepared cost analyses, accruals, capital estimates, forecasts, network simulations, tie-in and ground disturbance procedures related to the distribution of natural gas.
Conducted change management and served many stakeholders on multiple simultaneous projects, eventually taking on the role of environmental expert
Process Engineering EIT Jul. ’13– Dec. ’14
Upside Engineering, Transcanada / Suncor Fort Hills Terminal& East Tank Farm Facilities, Calgary, Alberta
Developed Neotec Pipeflo hydraulic analyses of Forthills’ Diluent 100,000 BBL/day System and Heated Bitumen 250,000 BBL/day system for Suncor’s 300,000 BBL/day Forthills Terminal and East Tank Farm Pumping Station (1B$), and interface with other disciplines to develop models/ studies.
Solved flushing requirement constraints for NCP Heated Bitumen System during maintenance and emergency scenarios to prevent loss of operability, leading to 100 BBL drains for over 800,000 BBL of liquids storage.
Performed bitumen and blend characterization studies of FortHills Heated Bitumen to contribute to Fort Hills fluid properties report creating predictive analyses of fluid properties of Heated Bitumen, Diluents and their Blends.
Sized, specified, and populated equipment datasheets for storage, pumping, safety, instrumentation and utility systems.
Developed Process and Instrumentation Diagrams, Line Lists.
Process Engineering EIT Feb. ‘11- Jul. ‘13
AMEC, Calgary, Alberta
Designed upstream oil and gas facilities:
oSunshine Oilsands West Ells SAGD detailed design (>300MM),
oSTP Mckay Phase 1 SAGD detailed design (>300MM),
oAlberta Oilsands’ SAGD Clearwater DBM/EIA (Regulatory approvals),
oIvanhoe Energy’s Tamarack SAGD facility DBM,
oConnacher’s Algar expansion SAGD facility DBM,
oSilver Willow Audet SAGD facility DBM/ EIA (Regulatory approvals).
Wrote, revised, provided setpoints, alarm and shutdown settings of entire SAGD plant to process control narratives with assistance of live process data on PI Process Book.
Presented over half a dozen lunch and learns on PSV and control valve sizings to peers and management.
Developed heat and mass balances of the facilities on HYSYS; sized, specified, selected equipment for oil processing, water treatment, steam generation, safety, utility systems.
Performed Piping and Pipeline Process hydraulics, sizings and calculations using standardized spreadsheets and modeling complex models on AFT Fathom.
Developed Process Flow, Safeguarding and Piping and Instrumentation Diagrams
Attended Hazop for various projects and assisted in evaluating risk using PHA Pro.
Interfaced with other disciplines over process design.
Production Engineer Intern May ‘08-Aug. ‘08
Husky Energy, Tucker Oil Sands, Calgary, Alberta
Helped resolve the 10,000 BBL steam /day BFW/ OTSG trips by analyzing DeltaV data leading to uninterrupted single OTSG steam production
Optimized reservoir steam circulation through identification of poor steam circulation areas.
Pipeline & Facilities Project Leader Intern Sept. ‘07-Apr. ‘08
Husky Energy, Facilities Engineering & Project Management - Southern Saskatchewan Conventional Oil & Gas, Calgary, Alberta
Managed design, procurement, schedule, capital estimates and construction of dozens of successful oil, gas, water injection and disposal pipelines’ construction projects (<$1MM).
Authored department-wide ground disturbance procedures and estimating spreadsheets.
Process Engineering Intern Summer ‘07
WorleyParsons, Syrian Gas Plant (SGC) Project, Process Engineering Department, Abu Dhabi, UAE
Sized equipment, backdrafted process drawings and datasheets, won detailed design phase.
Education
Chemical Engineering BASc, University of Toronto, Toronto, Canada; ‘09
Dean’s Honors list ‘05-’09 cGPA (3.3/4)
Chemical Engineering MEng, University of Calgary, Calgary, Canada; Jul ’15- pres. (incomplete)
cGPA (4/4)
PMP Course, Mount Royal University, Calgary, Canada, Mar ‘15
Societies and Activities
Event Director Oct ’11 – Mar ’16
Board of Directors of the University of Toronto Calgary Alumni Association