JON MCKENDRY
*** ***** *** *** ***** Texas 850-***-**** addfqj@r.postjobfree.com
OBJECTIVE: Project E&I and Plant Safety and Reliability Engineering position where my EI&C experience involving capital improvement of electrical power, instrumentation & control systems for industrial Petro-chemical, Refinery, Air Separation Unit, manufacturing and renewable energy, Steam/Gas Turbines facilities can be utilized. This includes capital design build projects from conceptual design through construction/start-up, FEL estimating, defining scope of work, team building, managing schedule and budget, vendor client meetings, RFI, IFA/IFC documents, change order request, equipment procurement.
PROJECT ENGINEERING/MANAGEMENT
Project development utilizing the Gap Analysis and Stage Gate process work flow process and FEL 1,2,3 estimating process
Quickly adapt to client specifications and regulatory requirements
Support area reliability and maintenance team by establishing a culture of safety and execution of all aspects of project team role requirements in achieving key outcomes in safety, health, environmental and quality standards. risk reduction, reliability, efficiency, cost and customer service
I’m a Take the LEAD and TAKE-CHARGE type of individual.
Support of Process Safety Management, PHA, ESSH, JSA, MOC, ECO’s, HAZOP, SAP and ISO policies Participate in PSM, PHA and Lead MOC reviews for all electrical and instrumentation and control modification to existing process equipment. Prepare job safety analysis JSA’s for electrical and instrument maintenance procedures
Manage capital projects ranging from small to large including engineering and construction, cost analysis, time management, manpower development, task scheduling, vendor/client meetings, engineering proposal and sales assistance, while maintaining the ability to handle other numerous tasks and responsibilities simultaneously;
Consults with Lead Designers and Engineers from other disciplines to ensure the smooth flow of vital information necessary for the scheduled completion of the project
Direct project team and manage total design, provide value engineering alternatives, constructability reviews, design recommendations while adhering to project scope of work, budget and schedule
Excellent writing skills, team building, customer focused with follow-up and follow thru commitments;
Develop totally integrated EPC schedule and cost control programs
Prepare cost /schedule adjustments to reflect SOW changes resulting in Engineering Change Order ECO
Assist in preparing engineering cost estimates for project including materials and inventory control
Strong customer, vendor, client, contractor and upper / lower management communication skills
Inter-department, client and contractor meetings, knowledge of construction and technical drawings, give guidance and assign work to others, report writing, minutes, progress status and financial reports, engineering / construction scope of work, equipment vendor bid specifications, etc.
Solid understanding of Microsoft Office and project scheduler
CONTROL and POWER SYSTEMS
Instrument Data Sheets and application and maintenance of various instrumentation devices for Flow, Pressure, Temperature, Level, Various Analytical PH, O2, CO, CO2, Hydrogen and moisture, conductivity; Control Valves, actuators, etc; calibration and testing as they apply to various applications
Perform plant walk through and sketches of existing equipment to verify new instrumentation will fit as well as to provide construction a guide for installation and cost estimating.
Communicates equipment design to client and other disciplines May participate with construction personnel concerning constructability issues as related to field conditions, sequencing and scheduling of construction activities.
Solid understanding of Hazardous Classifications, Class 1, 2 Div. 1 & 2, API500 and 505, SIS interlocks, and ESD systems
P&ID and process flow, SAMA / Logic diagrams, Functional Descriptions, Cause and Effect matrix for Ammonia Nitrate, Waste-to-Energy boilers, including air pollution, turbine air, BMS / combustion controls, of multi fuel systems, landfill, natural and syngas fuels streams,
Familiar & hands experience with AB Control logics/ControlNet, DeviceNet, RSView, Factory Talk View, Compact Logix, Client/Server, Modbus, Profibus, Siemens PCS7, Yokogawa Centrum VP, Wincc, GE 70/30PLC, Wonder ware, (DeltaV, Ver 13) AutoCAD, In tools / SPI Instrument Database, PID, Ratio, Cascade, Split Range controls
Utilize plant PIE system data, DCS Historian and other plant instrumentation performance data to determine Root Cause Failure,
Utilize predictive and preventative maintenance schedule machine operating data, along with equipment running data to prepare for scheduled downtime, improved equipment lifecycle
Root Cause Failure Analysis, identify and eliminate all bad actors, provide capital improvement / reliability, critical equipment and spare part
Utilize Plant In-tools for electrical & instrumentation DWG’s, specifications, loop checkout/PID tuning etc.
Steam Turbine instrumentation and governor controls (Woodward 505E),) 13.8KV Load Synchronization Load Center (Woodward DSLC), Lube oil system and Turbine protection and maintenance system
Generator Exciter controls (Basler DECS200N) and Turbine Control Panels and Maintenance
Assist in coordinating rebuild of 60MVA steam/generator turbine, auxiliary systems and complete control system modification from WDPF to Control Logix 5000 with various engineers and contractors
480/4160VAC,13.8kv 30,000HP sync motor schematics, loop wiring diagrams, instrument installation details, interconnections, control panel layout and wiring diagrams, Calculations for UPS systems, voltage drop, feeder/ transformer sizing, Arc Flash, coordination and short circuit study using SKM and ETAP
Coordination and setup of protective relaying including Multilin G60,469,735, Schweitzer 587,787 and 751, Eaton EDR 5000, 3000 electronic as well as electromechanical relays
Eaton SVX 9000, AB Power Flex 40,700 & 753, ABB-ASC-55, and Yaskawa drives
Testing and calibration of protective relaying for low, medium and high voltage substations, transformers, MCC’S etc.; Design / layout of switchgear etc.; AC-DC drives, one & three-line diagrams, power and grounding diagrams, NFPA, NEC/NEC70E; Testing MV & LV transformers, Doble, TTR, Megger, etc.
PROFESSIONAL EXPERIENCE
Medical Sabbatical Dec 2019-March 2020 Shoulder reconstruction Surgery and therapy
PC&IS Project Engineer, L&T Tech Services, Alex, La (Nov 2018-Nov 2019) Contractor for Proctor & Gamble
Manage plant electrical, instrumentation and controls capital EPC projects for technical content, code compliance, meet plant specifications, standards and practices from conceptual design bases through construction, commissioning and start-up. Verify all equipment meets applicable P&G codes and standards as well as area classifications.
Work with outside engineering firm to ensure all instruments and electrical equipment are accurate and meet P&G specs, evaluates vendors’ bids and drawings to assure compliance with specifications. verify Engineering Information document is accurate prior to presenting to P&G for construction
Prepare Engineering Change Orders when project changes from original design basic
Consults with Lead Designers and Engineers from other disciplines to ensure the smooth flow of vital information necessary for the scheduled completion of the project Work with instrument and electrical equipment vendors proposals meet all specifications,
Adhere to project Budget and Schedule,
NE Region I & E Engineer, Linde Group Bethlehem, Pa (Aug 2017-Sept 2018)
Provide technical support to 18 NE Linde ASU’s facilities with Liquefaction & Refrigeration Units. This includes instrumentation and electrical equipment, PLC’s, single loop controls, electrical motors, large sync Motors 30,000HP, 15 KV switchgear & relays, MCC’s. Maintain all engineering documentation.
Create P&IDs for process upgrade from single loop/pneumatic controls to PLC PCS7 Controls. Modify compressor surge control, Specify new instrumentation, smart valve positioners, PLC Equipment. Modify loop diagrams, electrical drawings and create construction wiring diagrams and termination list.
Participate in PSM, PHA and Lead MOC reviews for all electrical and instrumentation and control modification to existing process equipment. Prepare job safety analysis JSA’s for electrical and instrument maintenance procedures
Technical coordinator for all facilities; electrical safety, Arc Flash, E&I reliability maintenance procedures
Unemployed, (Nov 2015-Aug 2017) Atlanta, Ga. Gap between Employment (Medical Sabbatical)
Laided off from Day and Zimmerman do to service contract NOT being renewed Nov. 2015 thru April 2016
Bicycle /car accident in April 2016, I spent 10 plus months recovering from eight broken ribs, collar bone, wrist, collapsed lung, concussion and tracheal reconstructive surgery. Medical Sabbatical April 2016 thru July 2017
I & E Engineer, Day and Zimmerman / Ascend Materials, Pensacola, Fl. (July 2015-Nov 2015)
Provide technical leadership and direction to adhere to Ascends Project Stage Gate Process, plant support standards including PDP’s, ESSH, PHA, FEL’s and project challenge reviews, construction scope of work
Prepare 3 phase UPS design which resulted in cost savings of $5,000 from original scope
Specify, and Purchase Flow, Pressure, level, temperature and analyzer’s instrumentation, valves, and VFD’s and UPS systems for various sys., P&ID modifications, I/O Point availability, license, HMI modifications etc.
Verify packaged vendor equipment meets Ascends equipment and fluid service specifications
Project I & E Engineer, Fort Point / KBR, El Dorado, Ark. (March 2015-July 2015) Contractor to DUPONT
Provide technical direction and leadership in assessing critical that I E & C projects meet DuPont standards, hazardous area classifications etc., participate in project PSM, PHA and HAZOP’s
Project planning utilizing FEL 1,2 3 process; prepare project and construction scope of work documentation
I & E Engineer, INEOS-Bio, Vero Beach, FL (Feb 2013- Aug 2014)
Revise protective relaying scheme to enable effective Gen. Island mode operation during utility fault Modify 13.8KV turbine / generator controls AB- Control Logics, wiring and programming parameters to provide optimum efficiency and proper function between the Woodward 505E, Basler DECS200N and AB RS-5000
Utilize DeltaV Historian to trouble shoot, determine Root Cause Failure of steam / Electrical Generation Sys.,
Update / Modify and Maintain SKM Arc Flash and Relay Coordination Study
Trouble shoot AB Control Logix, DeltaV, Panel view HMI, DeviceNet, OPC Communications, system configuration and programming to identify process bottlenecks and equipment malfunctions in the turbine generator controls
Modify protective relaying at 23KV and 15KV to optimize coordination, maintain 10MW Co-Gen turbine generator operation; GE Multilin G60, Schweitzer 587, 787 and 751, Eaton EDR 5000 & 3000 relays
Support and trouble shoot of Eaton SVX 9000-VFD drives and other motor failures and DeviceNet Problems
Specify new instrumentation to improve existing miss applied instrument applications, maximize reliability of plant process controls and operating equipment
Assist in the tuning and control modifications of the boiler O2 control, multiple rated BTU value fuel systems, consisting of Landfill, Natural gas and Sys-gas from Bio-Mass gasification combustion
Support modifications to flare gas flow from syngas gasification, including modifying of 24” annubar flare flow meter by installing purge air system to avoid nuisance particulate plugging and meet EPA requirements,
Update P&ID’s, SAMA’s to reflect process changes, boiler, turbine pressure controls, AVR system, etc
Maintain Bentley Nevada 3500 Rack Mount vibration monitoring system for Steam Turbine
Provide instrumentation support for all plant instrumentation, create new and as-built drawings
Provide technical leadership to support I&E technicians and project team Participate in Job Safety Awareness, interface with various management levels, process engineers, vendors, contractors to resolve equipment problems and process bottle necks.
I & C Engineer, ASI Technology, Atl. Ga. (Sept. 2012-Feb. 2013) Contractor for Weatherly
Develop SAMA and Logic diagrams for grass roots Ammonium- Nitrate Plant, provide new technology procedures for ammonium synthesis process, coordinate DeltaV control efforts with system integrator, assist in updating / utilize InPlant Tools, maintain and modify Instrument List, P &ID’s and SIS system and cause and effect matrix, DeltaV graphics to reflect control modifications
Assist in configuration of Woodward 505E controller for Turbine Air Compressor
Sr. Lead Electrical Engineer, Selectek, Baton Rouge, LA (June -Sept 2012) Contractor Jacobs Engr
Meeting with clients to review their current needs, manage and supervise designers and engineers for development of E & I drawings, verify they meet API/PIP standards for the Petro Chemical Industry.
Participate in FEL process and project scope of work and scheduling
Project Engineer Visium, Mulberry Fl. Contractor Penn Pro / CF Industries (Oct 2011-April 2012)
Manage and supervise designers and engineers for development of all E&I drawings for a new water neutralization plant, adhere to schedule and budget, prepare scope of Yokogawa / cost estimates proposals
Generate instrument I/O index for a Yokogawa Centrum VP DCS System
Provided load flow-short circuit analysis. Utilize SKM to update plant arc flash and relay coordination system Specify and purchase 15KV LIS, transformer, 480VAC Switchgear, MCC’s, VFD’s, UPS, fiber optics. Interact with client, vendors and contractors, provide monthly progress status report, construction scope of work $1.1M. Project completed on-time and under budge
Project Engineer Electro Design Engineering, Riverview, Florida (June 2011- Oct 2011)
Prepare engineering proposal of $135K including project Scope of work, schedule, and construction budget of $2.98M for project consisting of 18-MCC 126-480VAC motors and VFD’s, 2-15KV-LIS, 480VAC switchgear, and MCC with redundant AB Control Logix PLC panel layout, coordinate engineering activities involving E&I Design, vendor and client review meeting, prepare construction scope of work.
Provide equipment specification, request for quotes
Electrical Reliability Engineer, Mosaic Fertilizers, Mulberry Florida (Dec 2010- June 2011)
Provide technical direction, problem solving Reliability/Preventative Maintenance of distribution system along with the addition of 68MW and 38MW generators, programming Multilin protective relays
Assist in overhaul of 68MW Steam TG, New AB-Control-Logix system from WDPF, ancillary systems Lube Oil, Hydraulic, Hydrogen, ESD, 505E Govern controls etc., construction supervision, Manpower scheduling Prepare cost adders and adjustments to schedule to reflect scope of work changes
Mitigate Arc Flash PPE, Update and maintain SKM Arc Flash and Relay Coordination Study, conduct load flow analysis for proposed installation of additional 30MW generator, menance of 3250HP synchronous motors and new H2S- HSRG Additions
Maintain and Review Load shedding Energy Management for plant non-critical loads utilizing control logics
Coordinate various contractors to rebuild / Major overhaul 68MW Hydrogen-Cooled turbine generator and static exciter and auxiliary supporting systems and control changeover from WDPF to control Logics.
Sr. Field Engineer Electrical and Controls, TechniPower, Atlanta, GA (May- Aug 2009) Contractor for Pratt Industries
Installation and field commissioning of new CFB Boiler (Fuel feed through 10Mwatt turbine generator)
Provide technical direction, problems solving /design modifications, improve construction efficiency and schedule, (Fuel Feed, Combustion, BMS, SCR Reactor, Fabric Filter systems and RO system)
Commission Multilin 269+ Motor Management, transformer and feeder protection relays, 4160V Limit amp
Design 5MVA 4160VAC unit substation, this included equipment procurement, testing and commissioning utilizing used 15KV LIS, 5MVA transformer and Power VAC feeder and load breakers equipment.
Coordinate scheduling for vendor equipment checkout, CEM’s Stack Emission system installation,
system commissioning and loop checks and verify vendor equipment, software Control Logics and Turbine controls / networking installations are compliant with owner contracts and specifications
Electrical / Instrument Engineer AE&E Vonroll Norcross, GA (2007-2009)
Development of SAMA / Logic control diagrams and function descriptions for Waste to Energy and CFB boiler / turbine generator, including BMS, Combustion, PAC, SNCR and Fabric Filter Sys. Interface with AB Control Logix, Compact Logix, AB HMI’s and existing PLC systems, DeltaV & network configuration Diag.
Interact with client, owners, system integrator & vendors to ensure all project specifications and scope are met
P&ID’s instrument and equipment location plans, power consumption/load flow analysis, review auxiliary vendor equipment and software; Instrument Specification Data Sheets
Prepare sales proposal and equipment specifications for new equipment installation,
Buckeye Woodworking Cleveland, OH /Atlanta, GA. (1997-2007) (This was my hobby)
Custom built cabinet and remodeling business used to fund my college education;
(2001 THRU 2007) Pursued Entrepreneurship cabinet business with profitable results of $65-$75K/yr
Manage, Sale & Marketing, project scheduling, estimating, material acquisition
Project Assistant Cleveland State University (1997-2000) Research project for General Motors
Demonstrate HMI pick and place transfer system controlled via AB PLC5/WinCE, VB6.0 & C++
PLC programming AB PLC5, Control Logix, Control Net/Device Net, Client/Server, Producer/Consumer
Integration of GE 90-30 LAN with multiple Wonderware workstations to control servo drive system
Sr. Electrical Engineer Middough and Associates. Cleveland Ohio (1995-1997)
Direct roll Anneal Pickling Line J & L Specialty Steel: Midland, PA,
Power and control schematics, fiber optic and LAN wiring, and balance of plant utilities
Review vendor equipment drawings, equipment Location and conduit plans, custom conduit / cable system, termination schedules for over 100+, DC/AC drives; 2500+ sensors, and Genius IO Control Blocks etc.
On-Site engineering 4+ months: supervise designers, contractors; Customer & Vendor interaction
Develop P&ID’s, loop diagrams, specifications for Fume Scrubber retrofit
Project Engineer Foxboro Construction Engineering, Cleveland, Ohio (1991-1995)
P&G Oxnard, Ca.2X Toilet Paper Machine Original contract $ 650K; final invoicing extras $1.1M
Document management (IFA & IFC), construction services, design review meetings, customer, vendor, contractor interface; Progress reports, manpower scheduling,
Installation DCS control system: 1800+ field I/O, site supervision/startup / commissioning
Detailed engineering, analog and digital loop wiring diagrams; 480/4160V motor schematics, instrument location and conduit plans; conduit &cable / termination schedules, field bus communication diagrams; review all vendor equipment drawings and vendor P&ID’s
Provide onsite engineering support to electrical contractors, project engineering team, maintenance personnel
Instrument loop checkout, as-built plant maintenance DWG’s including Sama / Logic diagrams,
Prepare virgin P&ID’s, Instrument specifications, for Chloropicrin Facility and fume scrubber
Design and implement system upgrade proposals, equipment and instrument specifications,
Field Engineer GE ISE Cleveland, Ohio (1988-1991)
34.5/138KV Sub; 27 MVAR Capacitor bank & Neutralizing Reactors Ladle Met Furnace; LTV Steel
Purchase all equipment, 138/34.5KV XFMR, breakers, Reactors, Capacitor bank, and Relay’s, substation steel, and associated controls, connection diagrams etc.
Monthly financial reports, customer /contractor interface, 8 months site supervision (projected completed on-time with 12% margin profit)
Start-up and commission of low and medium voltage substations, MCC’s and motors, calibration and testing protective relaying, 4-750KVA Generator/UPS System, AF-400 & DC-300 drives
Prepare maintenance and training manuals
DESIGN ENGINEER MK- Ferguson Cleveland, Ohio (1986-1988)
Prepare cable tray layouts, conduit plans, control schematics, panel layouts, interconnection diagrams, lighting calculations, transformer and cable sizing and load flow analysis
EDUCATION
CLEVELAND STATE UNIVERSITY (1998-2000) Cleveland, Ohio
Unfinished Study’s Masters in Industrial Manufacturing & Automation MSIE; 19 hrs. Completed; GPA 3.68
YOUNGSTOWN STATE UNIVERSITY (1986) BSEE Electrical Engineering, Youngstown, Ohio
PROFESSIONAL TRAINING
A-B PLC5, Control Logics, and Control Net; Midland Electric
Drives, Controls, and Power Delivery Technology; General Electric
Cisco Certification (CCNA), Site Safety Council thru 9-2020, TWIC Certified thru 9-2024
Currently have been preparing for the PE Exam which I plan to take next Spring 2021
RELEVANT CAREER SKILLS
Proposal preparation / Engineering cost Analysis Site survey and Conceptual Design
Interact with Sales and Purchasing Departments Perform sales support Functions
Apply customer Specifications to all DWG’s Purchase requisition / Material Acquisitions
Bill of Materials (BOM) Provide change order variance’s to Scope of Work
Manpower / Project Coordination Scheduling Prepare Engineering and design cost estimates
Agenda Leader coordinator, Minutes, Telecon Follow Engineering Stage Gate Process /Gap analysis
Project status / Field Commissioning Reports Understanding of Maintenance SAP and MAXIMO
Prepare Construction – Engineering Documentation Construction cost Analysis (RFQ)
Prepare Construction Scope of Work Progress Financial Status Reports
Supervise plant technicians, contractor’s etc Mentor other Junior Designers / Engineers
Assist Maintenance in PLC, VFD’s Instrumentation etc Familiar with Kraft Paper Process
Area Classification Drawings NEC/70E, ISA, NFPA, NEMA, PIP & Local Codes
Installation in Class 1 & 2 Div. 1 & 2 Areas Intrinsic Safe Barrier Applications
Application of Pressure, Temperature, Flow, Level Analytical Instrumentation, etc
I/O Instrumentation / Equipment / Motor Lists Smart Plant Instrumentation in Tools
Instrumentation Specifications with PIP Standards Test and Calibrate Instrumentation
Create / Interpret P&ID’s, Process Flow Diagrams Heat Trace and Installation Details
Development of SAMA / Logic Control Diagrams Cause and Effect Matrix Diagrams
Control Narrative / Functional Descriptions AB and PLC / HMI Programming
Control / PLC Panel Layout and Terminations Emerson DeltaV, Ovation, Foxboro IA and Provox
Ethernet, Modbus and DeviceNet Communications Fiber Optic Communications Systems
Boiler Burner Management Systems SIF and SIS Safety Systems
Steam Turbine Generator Systems Turbine Safety and Lube Oil Systems
Woodward 505E Governor Controls Woodward DSLC Digital Synchronous Load Center
Basler DEC 200N Excitation System Field Engineering Start-Up and Commissioning
Syngas Development for Gasification CEM’s Emission Control Monitoring
Boiler O2 Control Process Condensate Level Control
Scrubber / Ash Handling Process Syngas gasification development and baghouse
Modify AB Control Logics Instrument loop commissioning and tuning
Analog and Digital Loop Wiring Diagrams Instrument / Equipment Location Conduit-Wiring Plans
480 and 4160VAC motor and VFD Schematics Variable Frequency Drives; Low and Medium Voltage
480 and 4160VAC LV & MV MCC’s and SWGR UPS and Emergency Battery Systems
4160 and 13,8KV Synchronous motors 30,000P Protective Relaying both mechanical and Electronic
Vendor Interface Interconnection Diagrams Lighting / Power Distribution Panel Schedules
Conduit and Cable / Termination Schedules Cable Tray and Conduit layouts
One Line Diagrams with ANSI Devices Three Line Power Wiring Diagrams
Power, Grounding, and Control Wiring Diagrams HV PWR Dist. Equipment 4.16/13.8/34.5/69/138KV
15KV Load Break Air Interrupt Switches 34.5KV SF6 Distribution Feeder
138KV S&C Circuit Switcher Specify Low and Medium Voltage MCC’s / Switchgear
Specify 480VAC MCC’s and 480/4160 VAC Motors Load Flow Analysis
ETAP and SKM Power Tools, Arc Flash Analysis Interpret and Perform Short Circuit Analysis
Interpret and Perform Relay Coordination Grounding and Lighting Ning Protection
Protective Relays; Schweitzer, GE, Multilin, Basler Differential, TOC, Distance, Voltage, Phase etc
Test and Calibrate Protective Relays, etc Test and Calibrate Breakers, Transformers