SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 1 of 8
SETYA ARIFFIANTO
Career Summary
Having around 11 (eleven) years experiences in Fabrication (Oil and Gas and Marine) onshore and offshore, as Construction - Field Engineer and Inspector Quality Control Architectural - Civil Structural - Piping Insulation. Familiar with ITP, Client Specification and Code standard applicable. Conduct progress and inspection of fabrication & installation
Personal Details
Name : SETYA ARIFFIANTO
Nationality : Indonesian
Place, Date of Birth : Tanjung Pinang / February 22, 1976 Gender
Passport Number
:
:
Male
A1654539
Address : Tiban Raya Block I No 13 Batam, Indonesia Mobile Number : +62-812***-**** / +62-812-****-**** E-mail : ***********@*****.***
***************@*****.***
Education
Bachelor Degree of Civil Engineering - Structure, from Atma Jaya University Certificate No. NPM : 98 02 09192
YOGYAKARTA - INDONESIA
SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 2 of 8
Experience
INSPECTOR CIVIL SUPERVISOR (JUNE 2015 – APRIL 2017): Siemens Pte Ltd. Energy – Oil & Gas Solution, Batam Indonesia.
Duties & Responsibilities:
Ensure the correct application of the Project Quality Plan in site activities;
Ensure the supervision/coordination of the quality control activities for construction and erection works;
Ensure the implementation of the Quality Control Plans;
Supervise the Construction Quality control function/activities related to all dicipline, including Quality Control inspection schedules and the collection of Quality Records. Ensure the availability of quality record documents;
Evaluate the qualifications of inspection personnel in charge of works, verify work procedures, including those relating to special processes;
Allocate Quality Control personnel for Civil structural & Piping Insulation works to the verious areas of site activity;
Supervise and witness inspection, check reports and documentation issued by inspectors and collect the required Quality Records;
Ensure that all sites activities are carried out according to reference documentation for parts of the plan within his area of responsibility, authorising their acceptance at quality control completion;
Ensure that material and equiment are correctly received, stored, preserved and handle, identified and traceable;
Implement the inspection, control and test notification process;
Ensure calibration of measurement instruments and related certifications;
Check procedure and equipment to be used in test, controls and inspections and agree on the applicable operating procedures with the organization in charge of works;
Ensure that the tests, controls and inspections are carried out according to Quality Control Plans/Inspection Test Plans, obtain and collect the relevant documentation also for the purpose of approvals of mechanical completion of plant systems, and that personnel have access to all required project documentation;
The identification and issuance of non-conformance reports in conjunction with the Site QA/QC Engineer.
Ensure whenever necassary, the update of site quality control plans/control procedures;
Ensure the preparation of the Quality works dossier for final handover to the Client;
Knowledge of civil and piping insulation work activities, knowledge of construction and installation processes/phase during project planning and execution.
Awareness of site safety issues
SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 3 of 8
Project Assigned & Involved:
YAMGAZ, Yamal LNG MPW07A & MPW06 Project
PAB 105-114 COMPRESSOR TRAIN A SUBSTATION & TRANSFORMER (BLAST WALL- BATCH 1)
PAB 002 COMMON HOT OIL SUBSTATION & TRANSFORMER (BLAST WALL-BATCH 2)
PAB 203 PIPERACK EAST SUBSTATION (BLAST WALL) BATCH 4
PAB 206 TRAIN 2 WEST PIPERACK SUBSTATION (NON BLAST- BATCH 4)
PAB 304-314 COMPRESSOR TRAIN B SUBSTATION & TRANSFORMER (BLAST WALL – BATCH 5).
Project Completed
FIELD ENGINEER CONSTRUCTIONS & INSPECTOR CIVIL BUILDING – SUB CONTRACT COORDINATOR (SEPT 2013 – JANUARY 2015): McDermott International Inc. Duties & Responsibilities:
Involved In Discipline : HVAC & Civil Building, Piping & Vessel Insulation
Coordinate internally with other execution disciplines and external suppliers both within Company prescribed policies/procedure and/or direction from the Construction Engineering Manager
Observes and ensures construction practices as required for compliance of construction operations/execution with federal, state, and local codes, industry standards, company procedures, and contractual requirements
Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.
Study and understand the project specifications, procedures, and relevant portions of the Contract
Responsible for adhering to and promoting safe work practices
Represent Construction in project meetings
Achieve successful completion of assigned work responsibilities on time, within budget, schedules, and contract requirements.
Project Assigned & Involved:
CPP Top Side Wellhead A & Wellhead Tower C- Kepodang Gas Development Project, Kepodang Field Offshore Java Sea Indonesia
Petronas Carigali Muriah Ltd
SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 4 of 8
FACILITY CIVIL ENGINEER (DEC 2009 – SEPT 2013): McDermott International Inc. Duties & Responsibilities:
Responsible to assist facility manager ensuring that all yard facilities needed to support yard and project operations.
Manage Civil engineering design, direct construction and maintenance activities of the buildings / shop and other yard facilities related to civil work.
Develop scope of work and budgetary cost estimates (material, labor and equipment cost) for direct execution work, work packs, AFE and ACE.
Managing, directing, coordinating and monitoring progress during each phase of a work as well as monitor the budget performance to ensure adherence to budget.
Facilities engineers will usually supervise and manage the technical personnel at construction sites, and oversee all operations and maintenance activities. They will advise management on design and construction, propose modifications to existing designs and solutions, and recommend structural repairs when necessary.
Ensuring that all facility engineering work is undertaken in accordance with relevant safety and quality requirements
Project Assigned & Involved:
ACE (Authorization for Capital Expenditure) Build 4 Unit of Moveable Shop for Vetcogray Project.
AFE (Authorization for Expenditure) Batam House Refurbishment, Exotic Shop Upgrade, Waste Water Treatment.
Fabrication of concrete block for Gorgon Project.
Workpack for facilities in McDermott Fabrication Yard. INSPECTOR OIL & GAS CERTIFICATION (APRIL 2008 –NOV 2009): PT. SUCOFINDO Duties & Responsibilities:
Loading survey and Discharge survey, certification
Take sampling for test laboratory
Make report after loading or discharge
Ensure all manifold already lock/seal prior loading time started on vessel
Ensure all pipe and valve vessel already lock and seal.
Ensure all compartment on dry
Project Assigned & Involved:
Pertamina Pulau Sambu and Patra Niaga Company owner. SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 5 of 8
CIVIL ENGINEER – STRUCTURE (JAN 2007 –MARCH 2008): PT. ASL Shipyard Duties & Responsibilities:
Read and understanding the drawing to be used and ensure carried out the latest revision.
Direct construction and maintenance activities of the buildings / shop and other yard facilities related to civil work.
Managing, directing, coordinating and monitoring progress. Project Assigned & Involved:
NEW OFFICE BUILD CORP.
NEW OFFICE PRODUCTION
SYNCROLIFT PROJECT
SITE MANAGER (AUGT 2005 – OCT 2006): PT. TEGUH METTA INTERNUSA. Management Construction
Duties & Responsibilities:
Responsible to assist manager ensuring that all constructions.
Responsible to assist manager ensuring that jobs structure and architectural according a follow the standard and procedure.
Ensuring monitor subcontractor works as schedulle
Ensuring the work is carried out to AFC drawings and specifications
Monitoring subcontractor activities prior and during working as performed required by Management Quality System.
Managing, directing, coordinating and monitoring progress during each phase of a work as well as monitor the budget performance to ensure adherence to budget.
Manage the technical personnel at construction sites, They will advise management on design and construction, propose designs and solutions, and recommend structural repairs when necessary.
Project Assigned & Involved:
Nagoya Hill Superblock
CIVIL BUILDING QUALITY CONTROL (SEPT 2003 – July 2005): PT. WASKITA KARYA. General Contractor Division 1 – Building Structure. Duties & Responsibilities:
Ensure the correct application of the Project Quality Plan in site activities;
Ensure the supervision/coordination of the quality control activities for civil construction and erection works;
SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 6 of 8
Ensure the implementation of the Quality Control Plans;
Supervise the Construction Quality Control functions/activities related to Civil discipline, including Quality Control inspection schedules and the collection of Quality Records. Ensure the availability of quality record documents;
Evaluate the qualifications of inspection personnel in charge of works, verify work procedures, including those relating to special processes;
Allocate Quality Control personnel for Civil works to the various areas of site activity;
Supervise and witness inspections, check reports and documentation issued by inspectors and collect the required Quality Records;
Ensure that all sites activities are carried out according to reference documentation for parts of the plant within his area of responsibility, authorising their acceptance at quality control completion;
Ensure that material and equipment are correctly received, stored, preserved and handled, identified and traceable;
Implement the inspection, control and test notification process;
Check, insofar as within remit, the test packages provided for the final checks;
Ensure calibration of measurement instruments and related certifications;
Check procedures and equipment to be used in tests, controls and inspections and agree on the applicable operating procedures with the organization in charge of the works;
Ensure that the tests, controls and inspections are carried out according to Quality Control Plans/Inspection Test Plans, obtain and collect the relevant documentation also for the purpose of approvals of mechanical completion of plant systems, and that personnel have access to all required project documentation;
Make site personnel aware of and trainee them on quality topics relevant to Civil works;
Ensure, whenever necessary, the update of site quality control plans/control procedures;
Ensure the preparation of the Quality Civil works dossier for final handover to the Client;
SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 7 of 8
Knowledge of civil works activities, knowledge of construction and installation processes/phases during project planning and execution; Project Assigned & Involved:
HIGH RISE BUILDING “GREAT MOSQUE”
HIGH RISE BUILDING “MEGA MALL” 3TH FLOOR
HIGH RISE BUILDING “ HOTEL RAFFLES” 11TH FLOOR, ETC Professional Certification /Training and Courses
THE ASNT MPT/ LPT LEVEL II COURSE, CONDUCTED BY INDONESIA WELDING SOCIETY (IWS) BATAM
ATTENDED MAGNETIC PARTICLE TESTING COURSE
CONDUCTED BY IWS BATAM, IN COOPERATION WITH NON DESTRUCTIVE EXAMINATION (NDE) SDN. BHD, MALAYSIA, CERT. NO. 015/MPT-2/XX/IWS- NDE/2008
ATTENDED LIQUID PENETRANT TESTING COURSE
CONDUCTED BY IWS BATAM, IN COOPERATION WITH NON DESTRUCTIVE EXAMINATION (NDE) SDN. BHD, MALAYSIA, CERT. NO. 003/LPT-2/XX/IWS- NDE/2008
The ISO 9001: 2000 Internal Auditor Training Course, conducted by PT. BizComms Indonesia 2006.
Construction Method, Cost Estimation, Time Schedule and Monitoring, conducted by Human Resource Development Sensa Group Yogyakarta 2003.
Etabs V.7.2, Analysis of Building System Design, conducted by Atma Jaya University Yogyakarta 2002.
Sap 2000, Analysis of Building System, conducted by Atma Jaya University Yogyakarta 2001.
Quality Awareness Level II, conducted by PT McDermott Indonesia SETYA ARIFFIANTO
Mobile : +62-812-***-****
Mail : ***************@*****.*** or ***********@*****.*** Page 8 of 8
Contact Persons Reference
Wahyu Agung Wicaksono
Construction Manager, Siemens Oil & gas Energy Pte Ltd (Yamal Project) Mail address : **.*********@*******.***
Phone : +62-812-****-***
Didik Adi Prasetya
Construction Engineer, Siemens Oil & Gas Energy Pte Ltd (Yamal Project) Mail address : ****************@*****.***
Phone number : +62-822-****-****
Krishna Kumar
Lead QA/QC Civil/Architectural Client Rep. Inspector at BV Yamgaz (Yamal Project) Mail address : *******-*****-********@********.*******.*** Phone number : +62-812-****-***