Post Job Free

Resume

Sign in

Engineer Construction

Location:
Durgapur, West Bengal, India
Posted:
May 24, 2020

Contact this candidate

Resume:

* ** *

CV of Gaurav Kumar Singh

Name : Gaurav Kumar Singh

Position : Billing/Site Engineer.

Date of Birth : 30th November, 1988

Nationality : Indian

Mobile No : 889-***-****

Email : addej4@r.postjobfree.com

Proposed Position : Billing / Site Engineer.

Educational Qualification :

Degree Institution/Location Board/University Percentage% B.E.in Construction

Technology and

Management (CTM)

DayanandaSagar College Of

Engineering, Bangalore

Visvesvaraya Technological

University, Belagavi (VTU)

58%

Class XII Bihar NIOS 65%

Class X (ICSE Board) St. Joseph’s School,

Darjeeling, West Bengal

ICSE 69%

B.E. (Construction Technology and Management), Visvesvaraya Technological University, Belagavi, Karnataka. June-2018

Computer Proficiency:

MS Office (Proficient in Ms Excel, MS word, MS Power point)

Auto Cad

Technical Skills :

RFI submission

Client Billing.

Contractor billing

Sub-Contractor RA Bill

Bill of Quantity (BOQ).

BBS

Weekly Labour Report

Monthly Labour Report

Site Execution as per drawing.

Quality Inspection.

2 of 4

CV of Gaurav Kumar Singh

Work Experience of various Structures :

Graduate in Construction Technology and Management with 2 years of experience in the construction of Cable Stay Bridges and Structures including Highway projects. 1) Sub Structure work (Pile, Pile Cap)

2) Structural Work of Bridge (Pier, Pier Cap)

3) Super Structure work (Pedestal, Steel Girder, RCC Girder, Deck Slab) 4) Various types of foundations (Box Return, Retaining wall) 5) Pre-stressed concrete girder.

6) Cable stayed bridge, Cable stayed bridge (Extra dosed) 7) Bridge top finishing work (Crash Barrier)

Project Details :

Company Name : S.P. Singla Constructions Pvt. Ltd (June 2018 to till date) Languages

known:

English

Speaking

Excellent

Reading

Excellent

Writing

Excellent

Hindi Excellent Excellent Excellent

A) Name Of Project :- Reconstruction of 4-Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway station at 5.8 km on Diamond Harbour Road (NH-117), Kolkata, West Bengal. Position : Billing and Site Execution Engineer

D Duration : March 2019 –Till date

Project Cost : INR 260 Crores.

Client : PWD, Govt of West Bengal.

Work Experience :- Bill of Quantity, Measurement Billing, Sub-Contractor Billing(Manpower & Labour Supply Contractor, Measurement Contractor, Fabrication Billing and other miscellaneous bill preparation) and construction supervision, setting out, checking bridge layout, construction supervision of Bridges as per working drawings, reinforcement and foundation layouts, quality control during construction, checking and approving the material used for the bridge, measurement of completed works, progress monitoring of the work with the approved program. Also having knowledge of pylon and cables stayed bridge.

3 of 4

CV of Gaurav Kumar Singh

Structural details :

Name of

Bridge

Length

(m)

Span

Arrangements

Foundation Type of

Superstructure

Type of

Construction

Majerhat ROB 663m. (9x20) +

(1x60) +

(1x100) +

(1x47.5)+

(2x10.5)+

(3x20)

Pile

(Dia-1500 mm

& 1200 mm )

Steel Composite with

Cable stayed Main

ROB

New

Construction

B) Name Of Project :- High Level Major Bridge over River Hatania-Doania at 113.297 km of NH -117 including both side approach under Superintending Engineer National Highway Circle-1 P.W.(Road) Directorate Government of West Bengal

Position : Graduate Trainee Engineer .

Duration : June 2018 –March 2019.

Project Cost : INR 228 Crores.

Client : PWD, Govt of West Bengal.

Work Experience - Construction supervision, setting out, checking bridge layout, construction supervision of Bridges as per working drawings, reinforcement and foundation layouts, quality control during construction, checking and approving the material used for the bridge, measurement of completed works, progress monitoring of the work with the approved program. Also having knowledge of pylon and cables stayed bridge. Carrying out and Executing various daily tasks given by the Manager and Senior Engineer.

Structure Details :

Name of

Bridge

Length (m)

Span

Arrangements

Foundation

Type of

Superstructures

Type of Services

High Level

Major Bridge

over River

Hatania-

Doania at

113.297 km of

NH -117

Main Bridge:

Length- 340 m.

Viaduct:

Length- 960 m.

Segmental Main Bridge-

Well

Foundation

Viaduct –

Pile

Foundation

Cable Stayed

Bridge-Extra

Dosed.

Main Bridge-

PSC Box

Viaduct –PSC

Girder

New Construction

4 of 4

CV of Gaurav Kumar Singh

Permanent Address : TPS Bricks Industries,

AT + PO - Bishra,

PS - Ramnagar,

Dist - 24 Parganas (South),

West Bengal - 743504

Date:

[Signature of Candidate] Day/Month/Year



Contact this candidate