CV of Gaurav Kumar Singh
Name : Gaurav Kumar Singh
Position : Billing/Site Engineer.
Date of Birth : 30th November, 1988
Nationality : Indian
Mobile No : 889-***-****
Email : addej4@r.postjobfree.com
Proposed Position : Billing / Site Engineer.
Educational Qualification :
Degree Institution/Location Board/University Percentage% B.E.in Construction
Technology and
Management (CTM)
DayanandaSagar College Of
Engineering, Bangalore
Visvesvaraya Technological
University, Belagavi (VTU)
58%
Class XII Bihar NIOS 65%
Class X (ICSE Board) St. Joseph’s School,
Darjeeling, West Bengal
ICSE 69%
B.E. (Construction Technology and Management), Visvesvaraya Technological University, Belagavi, Karnataka. June-2018
Computer Proficiency:
MS Office (Proficient in Ms Excel, MS word, MS Power point)
Auto Cad
Technical Skills :
RFI submission
Client Billing.
Contractor billing
Sub-Contractor RA Bill
Bill of Quantity (BOQ).
BBS
Weekly Labour Report
Monthly Labour Report
Site Execution as per drawing.
Quality Inspection.
2 of 4
CV of Gaurav Kumar Singh
Work Experience of various Structures :
Graduate in Construction Technology and Management with 2 years of experience in the construction of Cable Stay Bridges and Structures including Highway projects. 1) Sub Structure work (Pile, Pile Cap)
2) Structural Work of Bridge (Pier, Pier Cap)
3) Super Structure work (Pedestal, Steel Girder, RCC Girder, Deck Slab) 4) Various types of foundations (Box Return, Retaining wall) 5) Pre-stressed concrete girder.
6) Cable stayed bridge, Cable stayed bridge (Extra dosed) 7) Bridge top finishing work (Crash Barrier)
Project Details :
Company Name : S.P. Singla Constructions Pvt. Ltd (June 2018 to till date) Languages
known:
English
Speaking
Excellent
Reading
Excellent
Writing
Excellent
Hindi Excellent Excellent Excellent
A) Name Of Project :- Reconstruction of 4-Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway station at 5.8 km on Diamond Harbour Road (NH-117), Kolkata, West Bengal. Position : Billing and Site Execution Engineer
D Duration : March 2019 –Till date
Project Cost : INR 260 Crores.
Client : PWD, Govt of West Bengal.
Work Experience :- Bill of Quantity, Measurement Billing, Sub-Contractor Billing(Manpower & Labour Supply Contractor, Measurement Contractor, Fabrication Billing and other miscellaneous bill preparation) and construction supervision, setting out, checking bridge layout, construction supervision of Bridges as per working drawings, reinforcement and foundation layouts, quality control during construction, checking and approving the material used for the bridge, measurement of completed works, progress monitoring of the work with the approved program. Also having knowledge of pylon and cables stayed bridge.
3 of 4
CV of Gaurav Kumar Singh
Structural details :
Name of
Bridge
Length
(m)
Span
Arrangements
Foundation Type of
Superstructure
Type of
Construction
Majerhat ROB 663m. (9x20) +
(1x60) +
(1x100) +
(1x47.5)+
(2x10.5)+
(3x20)
Pile
(Dia-1500 mm
& 1200 mm )
Steel Composite with
Cable stayed Main
ROB
New
Construction
B) Name Of Project :- High Level Major Bridge over River Hatania-Doania at 113.297 km of NH -117 including both side approach under Superintending Engineer National Highway Circle-1 P.W.(Road) Directorate Government of West Bengal
Position : Graduate Trainee Engineer .
Duration : June 2018 –March 2019.
Project Cost : INR 228 Crores.
Client : PWD, Govt of West Bengal.
Work Experience - Construction supervision, setting out, checking bridge layout, construction supervision of Bridges as per working drawings, reinforcement and foundation layouts, quality control during construction, checking and approving the material used for the bridge, measurement of completed works, progress monitoring of the work with the approved program. Also having knowledge of pylon and cables stayed bridge. Carrying out and Executing various daily tasks given by the Manager and Senior Engineer.
Structure Details :
Name of
Bridge
Length (m)
Span
Arrangements
Foundation
Type of
Superstructures
Type of Services
High Level
Major Bridge
over River
Hatania-
Doania at
113.297 km of
NH -117
Main Bridge:
Length- 340 m.
Viaduct:
Length- 960 m.
Segmental Main Bridge-
Well
Foundation
Viaduct –
Pile
Foundation
Cable Stayed
Bridge-Extra
Dosed.
Main Bridge-
PSC Box
Viaduct –PSC
Girder
New Construction
4 of 4
CV of Gaurav Kumar Singh
Permanent Address : TPS Bricks Industries,
AT + PO - Bishra,
PS - Ramnagar,
Dist - 24 Parganas (South),
West Bengal - 743504
Date:
[Signature of Candidate] Day/Month/Year