Alberto García Rivadulla
Flat ** Allan House – Deeley Road SW8 4XQ London UK
addcda@r.postjobfree.com
Citizenship: Spanish
Birth Date: 24.11.1966
Marital Status: Married
WORK EXPERIENCE
01.2019 –
Project: Ferrovial Agroman-Laing O`Rourke (FLO) (UK) Thames Tideway Central
Position: Senior Surveyor Tunnel
Work: Conventional tunnel building(SCL), Civil work, Setting out, Monitoring, Realization of facilities for assembly of TBM, Installation related to TBM: route guidance system
(PPS), (TBM working), cross-passages, leveling, points of convergence, transverse control, interchanges, profiles, cut-and-cover tunnel. 09.2017 – 09.2018
Project: CMC di Ravenna (Philippines)
Angat Water Transmission
Position: Chief Surveyor
Work: Conventional tunnel building(SCL), Civil work, Setting out, Monitoring, Realization of facilities for assembly of TBM, Installation related to TBM Seli: route guidance system
(ZED), (TBM working), cross-passages, leveling, points of convergence, transverse control, interchanges, profiles, cut-and-cover tunnel. 06.2017 – 09.2017
Project: Alstom-Acciona-Gulermak (Expolink 2020) (Dubai) New line meter Dubai
Position: Surveyor
Work: Realization of facilities for assembly of TBM, installation related to TBM Herrenknecht
(EPB), Civil work. Setting out
06.2014 – 01.2016
Project: Chun Wo – SELI JV - Contract 1107 (Hong Kong) Diamond Hill to Kai Tak tunnels - Shatin to Central link (SCL) Position: Chief Surveyor
Work: Installation related to TBM Herrenknecht (EPB): route guidance system (VMT), (TBM working), cross-passages, leveling, monitoring, points of convergence, transverse control, interchanges, profiles. Civil work, Setting out 11.2012 – 06.2014
Company: FCC – Acciona - UTE Station AVE Vigo (Pontevedra-Spain) Position: Surveyor
Work: Installation related to TGV (AVE) station building: setting outs of earthworks, cut-and- cover tunnel, foundations, monitoring, Civil work, Setting out 06.2008 – 11.2012
Company: FCC – Acciona - UTE Vigo das Maceiras (Pontevedra-Spain) Position: Surveyor Tunnel
Work: Installation related to conventional tunnel building and TBMs Herrenknecht/Robins: setting outs of earthworks and conventional tunnel, (TBM working), route guidance system (VMT/PPS), leveling, monitoring, points of convergence, interchanges, transverse control (polygonal), cross-passages, profiles, cut-and-cover tunnel. 10.2006 – 06.2008
Company: Norai S.L.
Position: Draftsman and practical surveyor
Work: Everything related to topography: surveying, setting outs, tachymetry, volume calculations, roads and highways.
06.1995 – 08.2006
Company: Topogray S.L.
Position: Draftsman and practical surveyor
Work: Everything related to topography: tachymetry, volume calculations, roads and highways, expropriations, etc.
EDUCATION
Advanced Topography Course (400 hours)
Technical Education (FPII): Technical Drawing Specialist AutoCAD Civil 3D -- (Intermediate)
TOPOGRAP Course -- (Advanced)
CARTOMAP Course - - (Intermediate)
MDT Course -- (Advanced)
ISTRAM- ISPOL- - (Intermediate)
Sofware LEICA Geo office, Amberg
OTHER
- Driving: Driving license B-2
- Languages: Spanish and Galician (Mother tongues), English (B2).
- Immediate availability
- Availability to work abroad
- Time flexibility