Carstairs Alberta
Phone 780-***-****
Email addc00@r.postjobfree.com
Roy Underwood
Objective
Profile
To become a valuable asset to a company with my skills in the maintenance role as a maintenance planner,millwright, or maintenance lead .
With my 20 plus years in the maintenance field ranging from millwright to Maintenance coordinator. I have demonstrated expertise in
Field millwright with excellence trouble shooting skills
Maintenance planner with CSU experience, SAP experience, PM writing,
Maintenance Team Lead with a crew of 11 to maintain equipment in a utilities area of oil and gas
Maintenance coordinator on major shut downs with crew of up 70 people of different disciplines
Experience
Petro China Canada 2016-2020
Maintenance Planner
Involved with start up and commissioning of plant. Loading PM’s BOM’s and equipment hierarchy. Started to work on Task lists to build up history of equipment in SAP
Worked with vendors getting quotes for required parts and entering PR’s for the parts. Also entered these parts into the SAP Material Masters as we found out that a history of these parts was required.
Worked as Maintenance planner through start up and into a running plant. At times filling in for Scheduler when he or she was on holidays
Use of Prometheus within SAP
Shell Albian Sands Energy 2006-2015
Blade 10 Coach 2015
Implement the Blade 10 system site wide with a goal of having Albian Sands being calculative by mid-2016. This system was designed to improve the work notification and work order so everything is there on time with the right resources available
Advancing my skills in the SAP world so we can educate others to improve their skills with the CMMS program.
Bringing cohesion between departments by improving the knowledge of the WPSE process to all involved.
Utilities Maintenance Team Lead 2012-2015
Supervised and scheduled a crew of 9 trades and 2 laborers
Executed the duties of Maintenance Co-ordinator during shut downs involving complete overhauls on two Frame 7EA turbines and stator rewind on generator section of turbine . Crew of up to 70 people involved in turbine overhauls
Contributed assistance with engineering on perfecting PM schedule buy eliminating redundant work and perfecting the quality of the PM
Responsible for the maintenance of two turbines, seven boilers, two water treatment plants, two cooling towers, two recycle water systems, cooling water system, raw water system, and river water system
Utilities Maintenance Planner 2010-2012
Encompassed with all aspects of commissioning a new plant (Jack Pine). Setting up BOM’s with inventory requirements.
Completed required mechanical work practices and procedures.
Created a preliminary PM schedule for operations/maintenance. This also included sight visits for verification of equipment installation and function.
Utilities Millwright 2006-2010
Set up an oil and greasing program in Utilities Area
Performed maintenance duties in the Utilities area. Including maintenance rounds to determine required repairs in the area
Engaged in the assembly of a critical parts list for the Utilities area through the use of vendor documents, e-spirs documentation, turn over documentation, field walk downs verifying equipment numbers, and our CMMS system SAP
Paired up with engineering to resolve reliability issues of recycle water pumps. Modified all pumps to mechanical seal from packing gland lowering the maintenance cost of these large pumps
Currently still working with engineering for modifications to river pumps to modify gland area to lower the cost of repairs from 250,000 to less than 10,000. Some pump modifications would be required.
Mechanical Lead on the commissioning team for Closed Loop Recycle Water. Spearheaded the modifications required on the pumping system to bring the pumps up to a higher level of availability before putting into service. Created all PM scheduling, BOM’s, Practices and Procedures
Cariboo Pulp Quesnel B.C 1996-2006
Maintenance Millwright
Maintained all parts of pulp mill on a rotation schedule to repair all equipment in the facility
Trained for 3 months in Vibration department on Data Pac and instrument readings
Converted to a dry end millwright for last four years. Scheduled all maintenance work as not to impair the production of the pulp machine. This was an unsupervised job where the millwright would order all required parts to keep equipment in operating condition.
Tutor/Instructor
This was an afterhours training on volunteer basis
Helped design and implement LEAP (Learners Education Assisted by Peers).
Tutored computer skills and fourth-class steam.
Instructed math and English skills for GED.
Completed my courses in Adult Education
Quintette Coal Tumber Ridge B.C. 1983-1996
Maintenance Millwright
Worked five years in processing as maintenance millwright.
Spent last few years in rebuild shop for mill and mine equipment.
Filled in as Maintenance Planner/Scheduler for 1 year in the plant area
Operator
Worked up through the lines of progression from labor to control room operator in coal processing plant
Operated smaller mining equipment including Terex 85 ton truck and loaders up to Leterneau 800.
Education
Technical or Equipment Skills
Millwright IP and TQ. # 9083-MW-93 College New Calidonia 1993
Management Skills for Supervisors I, II, III.
Fourth Class Steam (class time only) SAIT
WHIMIS 2015
Provincial Instructors Diploma, Vancouver Vocational College 2002
Diploma in Adult Education, Vancouver Vocational College 2002
Maintenance Planning Certificate Lincoln Tech.
Asset Planning Certificate Keyano College 2010
GE Frame 7EA Maintenance Certificate 2011
CSTS ver 3.2 #1-854-***-****
Other courses taken
Bearing Seminar
Fall Protection
Laser Alignment
Mechanical Seal Maintenance
Microsoft Office Suite
MIE Four Day Academy
Oil Analysis Fluid Life
Precision Maintenance
Rigging and Hoisting
SAP 5 day training
THR Leadership Training
THR Meeting Leadership Skills
Interests
Camping, Playing Bridge, RC Model building(tanks)