Post Job Free

Resume

Sign in

Mechanical Power Plant

Location:
Mumbai, Maharashtra, India
Posted:
May 18, 2020

Contact this candidate

Resume:

CURRICULUM- VITAE

POST APPLIED FOR : Mechanical Coordinator/Supervisor (Rotary/Static)

NAME

:

BADDI SATYANARAYANA

FATHER’S NAME

:

BADDI RAJARAM

DATE OF BIRTH / PLACE

:

01.01.1970 / MUMBAI

MARITAL STATUS

:

MARRIED

NATIONALITY / RELIGION

:

INDIAN / HINDU

LANGUAGES KNOWN

:

ENGLISH, HINDI, MARATHI & TELUGU

EDUCATIONAL QUALIFICATION

:

S.Y.J.C (12th ) Mechanical Diploma Engineer

PRESENT ADDRESS

:

FLAT NO. 103, 1ST FLOOR, B-WING, BUILDING NO. A-35, OPP. RNA PARK, VASINAKA, R. C. MARG, CHEMBUR, MUMBAI. 400074.

TEL : 919********* / 919*********

Email ID : addas4@r.postjobfree.com

PERMANENT ADDRESS

:

SAME AS ABOVE

PASSPORT DETAILS

:

PASSPORT No.

:

Z2330151

PLACE OF ISSUE

:

MUMBAI

DATE OF ISSUE

:

09-12-2011

DATE OF EXPIRY

:

08-12-2021

EXPERIENCE DETAILS :-

NAME OF THE COMPANY. Kentech (Saudi Dammam)

POSITION. Mechanical Pre Commissioning

DURATION. 06/08/2019 To 03/09/2019

1 NAME OF THE COMPANY. : QUCON (QATAR GAS)

POSITION. MECHANICAL SUPERVISOR (STATIC)

DURATION. 17/03/2019 TO 25/05/2019

1. NAME OF THE COMPANY JGC Corporation (CGP III Project Banagas) Bahrain

POSITION Mechanical Supervisor (ROTARY)

DURATION 07/June/2017 To 22/Feb/2018

2 . NAME OF THE COMPANY JGC CONSRIOM (NSRP Project) Vietnam

POSITION Mechanical QCI (Rotary & Static)

DURATION 04/Jan/2017 To 28/Feb/2017

3 . NAME OF THE COMPANY JGC Corporation (Barzan Onshore Project) Qatar

POSITION Mechanical QCI (Rotary & Static)

DURATION 23/June/2013 To 30/Oct/2015

4. NAME OF THE COMPANY Qcon (RasGas) Qatar

POSITION Mechanical Supervisor (Rotary & Static)

DURATION 08-Aug-2012 TO 25-Oct-2012

5. NAME OF THE COMPANY Transfield Emdad Service llc (Ruwais Gasco) U.A.E

POSITION Mechanical Supervisor (Rotary & Static)

DURATION 10/Feb/2011 To 04/Mar/2011

6. NAME OF THE COMPANY Qcon (Rasgas) Qatar

POSITION Mechanical Supervisor (Rotary & Static)

DURATION 02/May/2011 To 16/Jun/2011

7. NAME OF THE COMPANY Transfield Emdad Service llc (Ruwais Gasco) U.A.E

POSITION Mechanical Supervisor (Rotary)

DURATION 14/Sep/2011 To 12/Nov/2011

8. NAME OF THE COMPANY QCON (Rasgas) Qatar

POSITION Mechanical Supervisor (Rotary & Static )

+ DURATION 20/Mar/2010 To 12/June/2010

9. NAME OF THE COMPANY Al Nahiya Group (Gasco Buhasa) U.A.E

POSITION Mechanical Supervisor

DURATION 07/Oct/2010 To 10/Nov/2010

10. NAME OF THE COMPANY MMETC (BAHRAIN) PROJECT Job Conveyor

POSITION Mechanical Supervisor

DURATION 01/Jan/2009 To 15/Sep/2009

11. NAME OF THE COMPANY S.R.B Sons & Co (H.P.C.L DHDS Project) India

POSITION Mechanical Supervisor (Rotary & Static)

DURATION 01/May/2002 To 30/Nov/2008

12. NAME OF THE COMPANY KARAFI NATIONA (P.I.C Fertilizer) Kuwait

POSITION Mechanical Supervisor (Rotary)

DURATION 29/Nov/2001 To 18/Feb/2002

13. NAME OF THE COMPANY P.P.E (Peninsular Petrotech Engineering) Qatar

POSITION Mechanical Supervisor

DURATION 12/Sep/2000 to 03/Oct/2000

14. NAME OF THE COMPANY S.R.B. Sons & Co (H.P.C.L Refinery Project)

POSITION Mechanical Supervisor

DURATION 02/Feb/1999 To 30/Jul/2000

15. NAME OF THE COMPANY Mecon Qatar

POSITION Millwright Fitter

DURATION 12/May/1998 To 27/Sep/1998

16. NAME OF THE COMPANY Overseas Const Co

POSITION Millwright Fitter

DURATION 28/Oct1997 To 28/Dec/1997

17. NAME OF THE COMPANY S.R.B Sons & Co (H.P.C.L Refinery)

POSITION Forman Millwright Fitter

DURATION 04/Jan/1996 To 30/Jul/1997

18. NAME OF THE COMPANY Velma Fab

POSITION Millwright fitter

DURATION 02/Feb/1994 To 30/Aug/1995

19. NAME OF THE COMPANY Dynamic Fab & Erraction (H.P.C.L Refinery)

POSITION Mechanical Fitter

DURATION 1/Mar/1993 To 31/Dec/1993

KNOWLEDGE :-

Knowledge of skill and abilities of planning to work diligently on my duties and task and establish myself as well embrace every opportunity to grow with the company. I will anticipate and prepare such as skill in managing my work scheduled, proactively in solving problems, team building, confidence, cool head temperament under pressure. I can work under pressure and will get the ability to face more challenges. Got Experanince and Certificate in working at GTSC H2S/Breathing Apparatus, SHE&S, CHEM-1, W@H, CSE-1, EL LOTO, EL SAFETY, G RULES, HZD W&M, H2S&EBA, SM/PM.

Duties & Responsibilities:-

Installation and Alignment of Rotary & Static Equipment. Heavy equipment like Centrifugal pumps, reciprocating pumps, Compressor, turbine, Columns, vessel, Drum, Heat Exchanger, and Installation of Vessel Internal.

(Type of trays UOP, SULZER, S&W Bubble cap tray)

Experience :-

Middle East experience in oil and gas, Fertilizer, Refineries, Power plant and desalination plant projects.

Over 16 years of experience in various fields of Mechanical Maintaince, projects, and Shutdown turnaround experience particularly handled the jobs of Rotary and Static equipment’s as Centrifugal and Reciprocating pumps & Turbine, over oiling and trouble shooting of all types of pumps. Dismantling and assembling alignments in graphical method, revise method & rim and face method, and also changing the mechanical seal, journal bearing, and trust bearing and also checking “O” ring, carbon ring,seal ring, spring,gland packing, grub screw, matching ring and sleeve . Involved in preventive and breakdown maintenance in lot of gear boxes and change the bearings and gears. Checking alignment of gear box to motor or other driving equipment.

Involved in Compressor repair and changing of valves, piston, piston ring, piston rod, rider ring, tension ring, suction and discharge valves, cylinder, liner, connecting rod, crank pin, crank case, main bearing, cross head, crank shaft, distance piece fly wheel unloader assembly and its oil circuit equipment and cooler maintenance.

Experience in gas turbine, Dismantling and assembly of GG, PT and inspection of plenum chamber, Air intake Chamber, GG Soak washing, Trouble shooting of all kinds of works of minor problems, inspection and servicing of fuel gas injector, Spark Plug, Inlet guide vanes and GG/PT Turbine Plates, Cleaning of Air Intake primary filter, Secondary filter, Ventilation filter and Check the GG lube oil and Hydraulic Oils.

Installation of Air Fin Cooler & Air cooled surface condenser include Alignment of setting plate, structure, tube bundle, louver, shaft, pulley, Blade Angle, Tip clearance, Belt tension, pressure testing / Dew point inspection for tube bundles, solo run of motor, Completion of inspection records etc.

Column & Vassals Opening the manhole after proper isolation removed the damage column trays cap valve, bubble cap rays, chimney tray demister repair or replacement of the same in annual turnaround the unit. Filter stainer, flame arresters and pipe line Maintaince. Repair and changing the gland packing and preventive Maintaince of static equipment.

Exchangers as flooding head exchanger, U type Exchanger, Fixed Exchanger removal and fixing of channel cover, channel head cover, shell cover and flooding head of opening chanel,the bundle and testing as shell test, tube test and final test per procedure.

Carried out replacement & maintenance different of valves like, Gate Valves, Non Return Valves, Butterfly Valves, Plug Valves, Globe Valves, Ball Valves, Check Valves & Safety Relief Valves.

Conveyor : Fabricated & erected the Belt Conveyor and assembled the skirt board, sampler, head roller and head chute, belt washing system, weight up box, self alignment, alignment the carrying and return roller etc. And also erected and assembled the vertical roller mills.

Coordinating and inspection of final box-up of Exchangers,Columnes, Vessels, Strainers, Valves, Alignments of pump and other equipment based on the Specifications and manufacturer’s data sheet with the presence of QC Inspector.

Experienced in Plan and directs activities concerned with development, application, and maintenance of quality standards for industrial processes, materials, and products.

Develops and implements procedures, Method statements, Inspections & test plans based on the requirements for Project activities.

Follow up Nonconformance correction and corrective action reports and close out.

Experience in coordination as per approved ITP. Carry out surveillance to ensure compliance to the ITP & Project documents.

Orientation, Levelness, Pre shaft alignment, Run out, Void, Surveillance inspection during erection and welding of Piping, Pipe Strain, Motor / Turbine solo run, Final shaft alignment, Lube oil Flushing, Mechanical Running test, Completion of inspection records etc.

Installation for Static Equipment include Padding, Elevation, Position, Orientation, Verticality, Levelness, Platform & ladder, Exchangers, Vessel Internal work, Leak Testing, Loading of catalyst, chemicals, Support balls, Vessels and Box-up, etc.

Assure EPC contractor and sub contractor’s compliance with project technical specifications. Approve any change to technical specifications. Installation & alignment of Rotating Static Equipment with respect to the related standard Specifications and ITP & vendor manuals.

Provide professional assistance to Project Management, Procurement & Project controls.

• Review NCR, DR, and ITR & Field change documentation. To manage the materials of equipment and workmanship for conformance to plan and Review plans, issued for construction drawing work details and specification. Monitoring and implementation of approved QA/QC procedure by inspection. Overseas and vender closed physical inspection of the project execution in accordance with the plan and specification

Report to Manager / Coordination with Client/ Subcontractor

I AM ALSO HOLDING INDIAN DRIVING LICENCE FOR LIGHT MOTOR VEHICLES ISSUED BY MUMBAI RTO.