Usama Abdel Monem Hagar

009**-**-***-**** addalz@r.postjobfree.com

PROJECT MANAGER

S YNOPSIS

Construction Management Professional with over 27 years of experience in Civil Engineering, Structural Engineering and Construction. Provides valuable insights into the intricacies of the engineering industry within the entire lifecycle of projects. Well versed in managing all subcontractors and the delivery of projects into phases as per Project Schedules. Follows all guidelines, approvals, and permits to the standards of the Governing Authorities, as well as maintains the quality of the work provided. Experienced in client engagement with well defined skills in managing the entire lifecycle of project activities encompassing scope definition, planning, resource management, controlling and closure. S KILLS S NAPSHOT

P ROFESSIONAL D EGREES & T RAINING

Bachelor of Science, Civil Engineering, Ain Shams

University/Cairo (1987)

Diploma in Structural Engineering, Ain Shams University

(1991)

PMP Project Management Professional PMI Institute, February, 2009 Project Risk Management Cambridge Education, 2012 NEBOSH Certificate in Health & Safety – May 2013

C AREER P ROGRESSION

SITE TECHNOLOGY LTD. CO.

Located in the United Arab Emirates with its center of operation and main office in ABU Dhabi Designation : Civil Project Manager

Nov. ’18 till present

132/11Kv Substations (MAHRA &JEYAD) for DEWA DUBAI MEYDAN ONE MALL The project included the construction of the main buildings for 2 Substations on Raft Foundations

, the construction of 50MVA transformer bays, the construction of the fire pump room, underground oil/water tanks

& boundary wall.

Sterling & Wilson M.E. Electromechanical

Located in the United Arab Emirates with its center of operation and main office in Dhabi, S&W ME specializes in Engineering, Procurement, and Construction (EPC) contractor for Solar Plants Projects Civil Engineering

•Structural Design

•Construction Layout

Leadership/Project

Management

•Supervision and

Managment of Civil

Projects. Heavy

Industrial

Planning

•Projects Planning

•Contractor Planning

Compliance

•High Quality of Civil

Standards, Global

Best Practises

Quality Control

•Managment of

Quality of Work

Civil Engineering Leadership/Project

Management

Planning & Operations Compliance Quality Control

Designation : Civil Manager/Engineer

Nov. ’17 till Nov.18

1177 MWp PV Solar Plant Project @ SWEIHAN for ADWEA (AD Water & Electricity Authourity ) for construction of 2 nos. Substations 33/220Kv receiving the Power from the Solar Plant & transferring to TRANSCO Grid Station.

The project included the construction of the main buildings for 2 Substations 2.20km away & base for 500MVA Power Transformers & construction of the internal asphalt roads, laying out of 220KV cables into PV Plant.

Lindenberg-Emirates, LLC, U.A.E.

Located in the United Arab Emirates with its center of operation and main office in Abu Dhabi, Lindenberg Emirates LLC specializes in Engineering, Procurement, and Construction (EPC) contractor

Designation : Senior Construction Manager

February ’13 till Nov. ‘17

Project No. G 6982.1 ADWEA Battery Energy Storage Station 100 MW– AD Water & Electricity Authourity

The project included the construction of Huge storage Buildings of Batteries (2 nos. @ Mussafah & 1 no. @ Sila), construction of the Electrical Rooms, Transformer Bays, internal roads, laying out of 33KV cables & boundary walls

Project No. 7010 C8 ADNOC 33/11Kv Substation at Ruwais – ADNOC:

The project in ADNOC 7010 C8 included the construction of boundary walls, eternal finishing of the buildings, construction of the internal asphalt roads, laying out of 33KV cables into the complex, and following up/closing out of all snags in the project.

Project No. 6046 ADNOC 132/33Kv Substation at Ruwais – ADNOC:

The project number 6046 ADNOC 132/33KV at Ruwais included the engineering/design for the substation, providing a 132/33KV GIS building on a pile foundation, the construction of 140MVA transformer bays, the construction of the fire pump room, the installation of an underground oil/water tanks. This project also included the construction of the internal asphalt roads, boundary wall, the laying out of 33KV cables into the complex, closing out the project and handing it over to the end user.

Project No. D 6990 132/11Kv Substation at Sas Al Nakhel ADDC:

The project number D 6990 132/KV at Sas Al Nakhel ADDC included the construction of external services, precast boundary wall, and the closing out of the project.

Siemens, LLC, ETHS

Siemens Middle East provides advanced technology solutions across the entire electrification value chain with strong expertise in automation and digitalization to help its customers increase efficiency and create value. Designation: Civil Site Manager

December ’08 – January ’12

Contract No. 6166.1 132/22Kv Substation at New Airport of Abu Dhabi (ADAC):

The project number 6166.1 132/22KV at the New Airport of Abu Dhabi included the construction of a 132/22KV GIS building, the construction of 80MVA transformer bays, the construction of capacitor bank bays, the external trenching of cables and cable ducts, and the construction of the internal roads of the complex.

Contract No. 4351.1 B 132/11KV Substations at Khalifa Park/Khalifa II A & W2 (TRANSCO):

The project number 4351.1 B 132/11KV at Khalifa Park included the construction of a 132/11KV GIS building, the construction of transformer bays at W2 SS, the external trenching of cable pites and ducts, the construction of a precast boundary wall at KP SS, and the construction of internal asphalt roads at KIIA SS.

Siemens Transformers Factory Mussafah ICAD II:

The project at Siemens Transformers Factory in Mussafah included the construction of a steel structure shed for the main factory, the construction of the office building (including the ground floor and two additional floors), the construction of a precast boundary wall, the construction of the internal asphalt roads and the construction of the external drainage system and the crossing ducts for the protection of U/G existing services.

ACTCO General Contracting Company, U.A.E.

ACTCO General Contracting Company offers proactive construction solutions within UAE and the Gulf, through deployment of prudent policies and strategies, with strong commitment to employees, clients and society; enhancing clients expectation and be recognized as their preferred professional contracting company.

Designation : Project Manager (Civil)

January ’95 November ’08

Precast Factory at Mossafah – ICAD II:

The project at the Precast Factory in Mossafah included the construction of the pilings, pilecaps and the suspension of a ground slab. The project also consisted of the construction of a 340,000 gallon underground water tank, and the construction of the main building for the factory (including the ground floor and the Mezzanine), using a steel structure.

400/220 KV Substation at Sewihan:

The project at the Substation in Sewihan included the extension of the 220KV GIS building, construction of a 400KV GIS building, the construction of a new transformer bay and external trenching for cables, cable pites, cable ducts adjacent to the existing services and structures. The project also included the layout of the oil drainage pipe “GRP” from the new transformer bay to the existing oil tank, and the modification work to the R.C. walls of the transformer bays for extension purposes.

Tabreed Plant at Marina Mall:

The project at the Tabreed Plant at the Marina Mall included the construction of pilings into the break water area, put in a 500,000 gallon underground water tank, the construction of the main building for chilling units, the construction of a steel shade structure above the ground floor, and the erection of polished precast panels.

132/11 KV Substation At Marina Mall:

The project at the substation at Marina Mall included the construction of pilings into the break water area, the construction of the main building (including the basement, ground floor and first floor), the construction of four bays for transformers and reactors, the construction of the boundary wall and cladding it by polished precast panels, and the construction of a underground cable duct system for storm water and drainage.

Construction of 30 Villas at Al Bateen "Abu Dhabi":

This project consisted of the construction of a complex of thirty villas, each including the raft foundation, basement, ground floor, first floor, and a swimming pool.

EXT. OF 220/33 KV Grid Substation at Al Hayer:

The project at the Grid Substation in Al Hayer included the extension of a 220KV GIS building and a 33KV GIS building including its basement, the construction of a HVAC room on the roof of the 11KV control building, the construction of a new transformer bay and the external trenching for cables, cable pites, and cable ducts, adjacent to the existing services and structures. The project also included the layout of a oil drainage pipe “GRP” from the new transformer bay to the existing oil tank, and the modification work to the existing R.C. walls of the transformer bays and a 33KV basement for extension purposes.

EXT. OF 400/132 KV Grid Station at A.D.P.S.:

The project at the Grid Station in Abu Bhabi included the construction of a new 500MV transformer bay and a new 40MV transformer bay including the modification work to existing R.C. slabs and walls of the existing building for cable entry.

Desalination Plants "R.A.K" for "ADWEA":

This project included the construction of a 400KV GIS building, a 132KV GIS building, two 500MVA transformer bays in the control building, the external trenching of cables, and the construction of the external roads.

Construction of 6 Villas in "Abu Dhabi":

This project consisted of the construction of a 400KV building, a 132KV building, the control building, the transformer bays, the boundary wall, and the trenching of the exterior cables. Also, supervision of the raft foundation, superstructure, and a few finishing items.

1 MGPD Desalination Plant in "Delma" Island FOR "ADWEA":

The project at the Desalination Plant in Delma Island included the installation of two desalination plants on pile caps, the construction of a control building and a product water building, the construction of a seawater pump house, and the installation of GRP intake pipes in a brine fall out structure with 1.50KM GRP pipes.

Arab Contactors Company, Cairo Branch-EGYPT

The Arab Contractors (AC) is one of the leading construction companies in the Middle East and Africa. Our 77,000 employees work in collaboration with our customers, partners, and suppliers in more than 29 countries. Designation : Project Engineer

December ’91 January ’95

Abu El Rish Hospital:

This project consisted of the supervision the construction of the foundation, basement and ground floor for around ten months. The foundation system consisted of straus piles, pile caps and a raft foundation with an under water table of 1.5M.

Police Institute [Ainshams]:

The project at the Police Institute in Ainshams included the construction and supervision of four buildings, each with 1500M2, a 900M2 hall will a frame system with heights of 10M and 20M.

AL Nasr Building & Construction Co., Egypt

Emirates & Al Nasr Building and Construction Company one of the United Arab Emirates ' leading construction company, with over 500 personnel, working in Abu Dhabi .

Designation: Site Engineer

August ’90 December ’91

Housing Complex for Officers at Madinat Nasr:

The project for a housing complex in Madinat Nasr consisted of the construction of five residential buildings, with six floors in each building in a complex of ninety buildings.

Integrated Studies Consultant Company, Egypt

Consultancy Group For Integrated Studies & Project Management is located in 9 El Gazaer St. Off Gamaet El Dewal El Arabeya St., Mohandeseen, Giza, Egypt. Company is working in Consultants business activities. Designation: Structural Engineer

March ’89 August ’90

Structural Design and Supervision of Medical Center at “Mansourah”:

This project included the structural design and supervision of the construction of the Medical Center in Mansourah.

Structural Design and Supervision of Al Shareef Housing Complex

This project included the structural design and supervision of the construction of a housing complex. A DDITIONAL I NFORMATION

Computing Skills MS Project, and Primavera

Date of Birth September 1st, 1965

Languages Arabic and English

Nationality Egyptian

Status

Linkedin Profile

Married

www.linkedin.com/in/usama.hagar 10a30ba7

References Available upon request



Contact this candidate