Post Job Free

Resume

Sign in

Plant Manager

Location:
Kanpur, Uttar Pradesh, 208027, India
Salary:
negotiable
Posted:
July 01, 2020

Contact this candidate

Resume:

Aditya Khare

Mobile: -960-***-**** /790-***-**** E-Mail: add9b3@r.postjobfree.com

G.M/PLANT HEAD in Tool Room /Maintenance/ production Operations/ Project Management with an organisation of repute

Executive Summary

A professional with around 30 years of extensive experience in Tool Room & Tooling, Project Management & Production Steel Tube Plant (E.R.W Water Tube & API Pipe and Precision Tube).& Seamless Pipe Plant.

Conducting the production planning, monitoring and controlling, troubleshooting and de-bottle necking, safety, health & environment system, plant start-up and shutdown activities.

Skilled at executing multiple tasks and projects simultaneously in challenging environments with excellent relationship management skills and the ability to relate to people at any level of business and management.

Career Contour

GOOD LUCK STEEL TUBES LTD,Sikandarabad,U.P Sr.G.M (Operation) April 2016 –Dec 2018

P.S STEEL TUBES LTD,BHILAI G.M WORKS Sept’13 –Mar’16 Maharashtra Seamless Ltd Sukeli Manager(Production,Tool Room,Tooling) Sept’ 08- Aug’13

Raigad, Maharashtra

Atlas..Steel.Tubes..Ind. Bawal, Rewari, Haryana Manager(Tool Room) Feb’06-Aug’08

H.M Steels ltd,kala Amb, H.P WORKS MANAGER Sept’01 –jan’06

Surya Roshni Ltd., Bahadurgarh, Haryana Senior Forman Production Nov’93-AUG’01 Rajendra Tubes Ltd., Kanpur Foreman Production &tool room Apr’88-Nov’93

Toaha Engineering, Lucknow, U.P. Tool Room In-charge Jul’83-Mar’88

Key Deliverables:

Production

Managing overall operations with a view to ensure timely accomplishment of production targets within the time and cost parameters.

Establishing inventory, making calibration schedule & putting system in order to carry out periodical checks.

Controlling the defects occurred during manufacturing and managing of consumables for production.

Conducting the analysis of product quality problems and identifying their corrective actions.

Managing the spares and sub assembly supports for fields requirements.

Managing the production and troubleshooting of Tube Mill rolling.

Overseeing he production activity at slitting, tube mill and finishing mill along with leading ISO documentation.

Operations & Maintenance

Planning & effective preventive scheduled maintenance of various machineries & equipments to increase machine up time & equipment reliability.

Executing cost saving and energy saving techniques and measures and modification to achieve substancial reduction Expenditures in O/M and work with in budget.

Implementing the maintenance schedules on the fortnightly and half yearly basis.

Tool Room Operations

Ascertaining requirements of material for new product development activities in the Tool Room & interfacing with vendors for cost effective, timely sourcing of quality material.

Assisting in estimating new tooling requirements and costs; coordinating tool design revisions in relation to product design changes and reverse engineering.

Troubleshooting all technical problems; conducting various tests & inspections to ensure that products developed are in compliance with pre-set technical specifications.

Project Management

Project planning, scoping, activity sequencing/ estimation, tracking and development of contingency plans to meet cost and time over-runs.

Selecting appropriate technologies for development approach as well as implementing policies for the organization entailing restriction on recourses.

Managing project flow path on line & comparing planned v/s. actual production to take necessary action.

Monitoring development activities and reporting project progress as well as managing and providing technical guidance/support to the project team.

PROJECT WORK ERW PIPE PLANT& SEAMLESS PIPE PLANT

1-ERW TUBE MILL ERECTION&COMMISSIONING AT RAJINDER TUBES LTD

2 -EXP. IN MANUFACTURING OF SQUARE & RECTANGULAR TUBES ALL SIZE.

3 - STEEL STRUCTURE FABRICATION,ERRECTION COMMISSIONING FOR WALKING BEAM FURNACE 30 MT & PROJECT WORK FOR SEAMLESS PIPE PLANT AT MAHARASHTRA SEAMLESS LTD.

Academic Credentials

1983 Diploma in Mechanical Engineering from Hewett Polytechnic, Lucknow with First Division

IT Skills: Knowledge of Windows 2000, & Windows Xp, Ms-Office (Ms-word, Ms-Excel) ERP

Personal Dossier

Date of Birth: 3rd March 1960

Permanent Address H.No.-K 242,WORLD BANK COLONY, BARRA,KANPUR,PIN208027

Linguistic Abilities: Hindi and English

Salary drawn :

Salary expected : Negotiable



Contact this candidate