Post Job Free
Sign in

Power Plant Engineer

Location:
Bardol, Karnataka, India
Posted:
July 02, 2020

Contact this candidate

Resume:

Brahma dut Pandey B. Tech.-Mechanical

Snapshot

9.9 years of total work experience in Power Generation industries.

Currently working at Torrent Power Limited, Gujarat as Assistant Manager (Shift Charge Engineer) for operations of its 1200 MW CCPP Plant since July 2019.

Dubai Electricity and Power Authority as Power Station Operator for operations of its 750 MW CCPP, 63 MIGD Water Generation MSF Desalination Plant and 30 MGD Dyna Sand Filtration RO Plant at Dubai (UAE) from September 2018 to June 2019.

CLP India Private Limited as Deputy Manager for Operation of its 655 MW CCPP Plant at Bharuch (Gujarat, India) from September 2014 to August 2018.

Shree Cement Limited as Senior Engineer for Operations its 44.5 MW CPP Plant at Beawar, Rajasthan from 2010 July to 2014 September.

Boiler Operation Engineer certification from Madhya Pradesh Boiler Board (2014).

Certified Energy manager from National Productive council of India (BEE).

Graduated in Mechanical Engineering from UP Technical University, UP, India with 64.67% in 2009.

Objective

To craft my contribution to the organization to best of my abilities and to utilize most of my proficiency in the growth of the same to furnish new heights.

Career Graph with Notable Accomplishments:

Torrent Power Limited-DGEN (Gujarat)

Working as Shift Charge Engineer in operation department of 1200MW (400 MW x 4) Siemens make SGT5-4000F Gas turbine combined cycle Power Plant.

Designation : Assistant Manager

Department : Operation

Period : July 2019 to till date

Responsibility:

Operation of the plant during normal operation with efficiently and reliability by watching the parameters for in operation range.

Operation of the plant during emergencies, during unit tripping and normalizing the plant for smooth operation.

Startup and shut down of the plant for cyclic operation and other defects attending. During shut down, isolation of the equipment's for maintenance, PTW preparation. Normalizing the equipment's after maintenance works.

Noting down the defects of the equipment's and making work request for maintenance. Planning the outage of units for maintenance works.

Electrical operation of 400KV, 220KV, 6.6 KV and 415V system.

Operation of DM plant.

Dubai Electricity and Water Authority (Dubai, UAE):

Working as Power Station Operator at G-Station in operation department, a 755MW (150*5 MW GT+5HRSG+2*71MW BPST+63MIGD Desalination) combined cycle and cogeneration plant. 30 MGD Dyna Sand Filtration RO Plant.

Designation : Power Station Operator

Department : Generation Division

Period : September 2018 to June 2019

Responsibility:

Operation of the plant during normal operation with efficiently and reliability by watching the parameters for in operation range.

Operation of the plant during emergencies, during unit tripping and normalizing the plant for smooth operation.

Startup and shut down of 30MGD Dyna sand Filtered Sea RO Plant.

Startup and shut down of the plant for cyclic operation and other defects attending. During shut down, isolation of the equipment's for maintenance, PTW preparation. Normalizing the equipment's after maintenance works.

Noting down the defects of the equipment's and making work request for maintenance. Planning the outage of units for maintenance works.

Participating in meeting with other departments for discussion and problem solving.

Electrical operation of 400,11KV and 380V system.

Preparing daily reports of generation, fuel consumption etc.

Reporting to higher management about plant condition.

Conducting tool box talk to the staff for training.

Managing the plant operation as per the load by load dispatch center. Monitoring staff and plant safety.

CLP India Pvt. Limited (Bharuch, Gujrat):

Working as Deputy Manager in Production department in CLP India Power Plant, a 655 MW (138*3 MW GT + 3 HRSG + 241MW ST) Combined Cycle Independent power plant located in Bharuch, Gujarat.

Designation : Deputy Manager

Department : Production

Period : September 2014 to August 2018

Responsibility:

Operation of 138 MW GAS turbine (3 no’s), 241 MW Steam turbine and Double drum HRSG (3 no’s) from control room.

Independently carrying out the Start-up of GTs/HRSGs and Cold & Hot start-up of Steam Turbine.

Fulfilling the role of shift in-charge and taking individual charge of the shift.

Regularly doing steam turbine and gas turbine start up/shutdown by monitoring all the parameters as per the instruction received by Gujarat SLDC.

Electrical bus changeover in main plant & switchyard of 220 KV and 400 KV.

In charge for supervision of operations of D.M Plant and naphtha tank farm area.

Emergency handling and troubleshooting during plant tripping condition and during abnormal behavior of any critical parameters.

Preparation & Issue of PERMIT TO WORK documents for releasing electrical and mechanical equipment’s for its preventive & corrective maintenance. Got approved as Senior Authorized Person for the same.

Releasing the various equipment’s for maintenance by changing over the equipment & proper isolations. After the completion of maintenance work same are restored back.

Identifying the defects in equipment’s & notifying the same in SAP.

Doing switchyard operation, isolation & normalization for Line Outage, Bus Outage, Bus Change Over, CB, CT, CVT, LA, Transformer PM/CM.

Participating in the various (Safety/Health/Environment) internal audits.

Maintaining the dispatch of power as per the requirement of Gujarat SLDC &present guidelines and rules of the ABT.

Communicating with the various departments i.e. C&I, mechanical maintenance, electrical maintenance for GT/ST/HRSG& equipment defects & its availability. Communication with Performance & Environment Department for Dispatch Capacity Declaration and commercial department for fuel availability.

Communicating with the external entities i.e. Gujarat SLDC (For Load Dispatch/DC), GSPL (For Gas/Fuel related issues), GETCO (Gujarat transmission company regarding line outage/tripping/restoration).

Actively participating in achieving the station Environment yearly objectives by being a SHE (safety, health and environment) representative of department.

Actively participating in various internal audits relating to ISO status and NOSA audits.

Shree cement Limited, Beawar (Ajmer,Rajasthan):

Working as Shift In charge in 2x18+6MW (AFBC) Power Plant at Shree Cement limited.

Total generation capacity of running Coal based power plant is 214.5 MW (6x18 MW, 6.5 MW, 2x50 MW) and 2X150 MW Power.

Total Power Generation Capacity of Green Power Plant is 70 MW (Waste heat Recovery Boiler by using flue gas from Kiln from Cement plant).

Designation : Senior Engineer

Department : operation (Power Plant)

Period : July2010 to September 2014

Responsibility:

Handling the shift and leading in Boiler light up activities and Shut down activities.

Desk operation Of Boiler and Turbine- Cold start-up / hot start up.

Smooth and Efficient Operation of Unit and it’s auxiliaries by producing steam and power as per the budget.

To operate the units by operating the recommended parameters within the designed values.

To reduce the downtime of unit and its auxiliaries by avoiding tripping.

Handling of normal and emergency condition of the Boiler/Turbine operation.

Efficiency Monitoring of Boiler & Turbine and its auxiliary are for routine daily basis.

Following changeover schedules of equipment’s as per manufacturer’s standard.

Monitoring the key performance data of the plant.

Preparation and carrying out of Hydro test as per IBR norms during annual shutdown.

Preparation of Daily log Sheets and daily report.

Trouble shooting of plant equipment’s.

Planning of plant stoppage & start-ups.

Improving the Power Plant Performance by optimizing heat rate and Auxiliary consumption.

Measuring of Equipment efficiency and Performance as per energy schedule.

Commissioning of upcoming power project. Presently involve in 23.5 MW (Turbine & Boilers) green Power project at Ras Site.

Handling Internal Projects.

Involved in Successful commissioning of FGD Plant for manufacturing of artificial gypsum with 83% purity.

Professional Qualification

B. Tech. (Mechanical Engg.) (2009) with 64.03% from Shri Ram Murti Smarak College of Engg. & Tech., Bareilly (Affiliated to Uttar Pradesh Technical University).

Academic Qualification

Intermediate passed with 61% from M.G.S. Sultanpur.

High School passed with 63% from M. G. S. Sultanpur.

Certification

Boiler Operation Engineer certification from M.P.(2014)

Certification in Auto Cad from Four People Technology (Renukoot, Sonebhadra) in July 2008.

Skills and Languages

Application

Computer Language

Auto Cad

C

Operating System

Windows 95/98/Me/XP.

Application Software

MS office, AutoCAD.

Personal Information

Date of Birth: July 1st 1985

Marital Status: Married

Brahma Dut Pandey

Contact No.: +918*********

Email: add93f@r.postjobfree.com



Contact this candidate