Assignments in Fabrication, Erection, Commissioning, Operation, Maintenance, Overhauling of Boiler, Electrostatic Precipitator and Ash Handling Plant with organizations of high repute

EDUCATION

2004 B.E. (Mechanical Engineering) from BCYRC, Umrer (Nagpur university) (Secure 71.5 %)

2000 HSC. Examination from Govt.Technical High school Nagpur, (Secured 65.5%).

1998 SSC. Examination from Janata High school Mouda, Nagpur. (Secured 69.73%).

Extensive experience of 15 year in Fabrication, Erection, Commissioning, Operation, Maintenance, Overhauling of premier large scale power projects within time, quality parameters, as per project management & best practice guidelines

CORE COMPETENCIES

Functional Skills

Fabrication

Erection

Commissioning

Operation

Maintenance

Overhauling

Site Management

Manpower Management

Material Management

Quality Assurance

Safety Management

Vendor Development

SAP

Managerial Skill

Effective communication Skill

Positive thinking Ability

Quick learner Ability

Excellent interpersonal skill

PROFILE SUMMARY

Erection and Commissioning

Technical Responsibilities :

Mobilization of various contractors for Fabrication and Erection works in Boiler, ESP, Critical Piping, Ducting, coal piping in Thermal Power Plant.

Receive the drawings of Boiler and ESP, Read the drawing according to that prepare the Bill of Materials (BOM).

Arranging and distribute the Materials for making preassembly of BOILER and ESP Components and Accessories.

Allocation of various works in Boiler, ESP & FHS (FUEL HANDLING SYSTEM).

Following the IBR rules during pressure parts erection in Boiler and also arranges a visit for ground inspection.

Planning the erection sequence & follow the working activities.

Implementation of Safety culture on workplace by proper training and awareness.

Signing of Protocols, Records, Punching check list prior to Hydro test and carry out the hydro test, Chemical Cleaning and Steam blowing.

Carry out NDT as per Field Quality Plan implemented in various stages of fabrication & Erection.

Involved in supervision of Erection works of static and Rotating equipments such as fans, tanks etc.

Assisting commissioning Team in Pre – commissioning.

Carry out Fabrication, Erection & Commissioning of Ammonia Flue Gas Conditioning System to control stack emission.

Carry out Fabrication & Erection of Pipeline, Static and Rotary Equipment in Fluidised Catalyst Cracking Unit in Refinery project.

Managerial Responsibilities :

Involved in site activities, customer co-ordination, Man power management, Project schedule & Implementation.

Planning Man Power resources with required tools, consumables.

Planning the daily, weekly & monthly erection,fabrication & commissioning schedule.

Co-ordination with consulting management and clients to handover all relevant documents.

Maintained safety procedures and records conducted safety meeting and audits.

Planned and reviewed daily progress of projects and experienced in implementation of project schedule with effective man power

Settling of Sub-contractors Bills & Payments.

Operation & Maintenance

Identification and Implementation of Modifications for system stability to reduced Auxiliary Power Consumption.

Identification of Pain area for system improvement by carrying out Root Cause Analysis.

Implementing safe operating and maintenance procedure for system stability.

Analysis of spare requirement, Timing of Procurement and Budget availability for O&M of AHP & ESP.

Implementation of safety culture on workplace by proper training and awareness.

Involve in Integrated Management System and 5 S system implementation in AHP and ESP.

Planning and implementation of Annual Overhauling of Ash Handling Plant and ESP.

Planning of Preventive, Corrective and Breakdown Maintenance of AHP equipments.

Involved in finalisation of annual O&M Contract for AHP.

Preparation of procurement proposal and vendor evaluation for AHP spare.

SAP System- MM & PM Module. Material data Management (MDM)

Heighlights

By implimenting one additional ash conveying line and changes in Logic system,ash conveying time was reduced from 6 hrs.to 4 hrs per cycle. Total power consumption was reduced from 44 MW/Day to 38 MW /Day.Savings of 18 lakhs/ month.

Turn around performance in Ash handling Plant in specific power consumption from 18 KW/MT to 13.6 KW/MT and reduction by implimenting number of power saving and innovative measures like Destaging of HP pump,LP optimisation,Hopper Heater and Vibrator. etc.

Self design and modified the undergroung heart line of power plant,ash desharge lines and HCSD lines to dyke by building new steel culvert and pipe conveyor bridge over road 100% reliability and trouble free operation of plant.

Identified the problem of seal water in Ash water recovery pumps and rectified,the pump were failed more than 100 times in previous three years savings of lakhs of funds.

Developed first time the metallic expansion joint inESP minor hopper to DEPAC vessel,reduced down time of ash conveying cycle leading to saving of extra running of two compressor for half hours and reducing maintenance cost approximately 5 Lakhs / year.

Resolve major failure in TAC compressor by root cause analysis and observation and implimented acid cleaning of coolers before and after rainy season.

ORGANIZATIONAL EXPERIENCE

1) Reliance Power limited. (Vidharbha Industries Power Limited) Since DEC'2012 To Till Date.

2X300 MW Group Captive Thermal Power Plant, Butibori, Nagpur (Maharashtra), India

Job Profile - Sr. Manager ( Operation and Maintenance of AHP & ESP ).

2) Reliance Infrastructure Limited. ( RUEPL) Since OCT'2010 To DEC'2012

2X300 MW Group Captive Thermal Power Plant, Butibori, Nagpur (Maharashtra), India

Job Profile - Manager Projects.

3) Larson & Toubro Ltd. Since OCT'2007 To OCT'2010

2 X 525 MW Thermal Power Plants. (BHEL Boiler), Maithon.( Jharkhand).

2 X 300 MW Thermal Power Plants (China Boiler),Sagardighi, West Bengal.

Job Profile - Assistant Manager Projects

4) Reliance Industries Ltd. (Asha Consultancy services) Since OCT'2006 To SEPT'2007

Refinery Division - Jamnagar, Gujrat.

Job Profile - Engineer Projects.

5) Chemithon Engineers Pvt. Ltd. Since JUNE'2004 To SEPT'2006

2 X 210 MW Thermal Power Plant, Khaparkheda, Nagpur.

2 X 210 MW Thermal Power Plant,CSTPS,Chandrapur.

Job Profile - Engineer Projects

IT SKILL

MSCIT, MS OFFICE, POWER POINT

PERSONAL DETAILS

Date of Birth: 25th June 1982

Permanent Address: Maruti Arcade,Flat no-201,Nandanwan Main Road, Kabir Nagar, Nagpur.440009.

Languages Known: English, Hindi,Marathi



Contact this candidate