Curriculum Vitae (CV)
SURNAME: Mohadawoo
FIRST NAME: Ravindra Jaysingh
GENDER: Male
DATE OF BIRTH: 22nd June 1992
NATIONALITY: Mauritian
MARITALSTATUS: Single
TELEPHONE: 5 919 0722 / 5 709 2376
EMAIL: **.*********@*****.***
POSTAL ADDRESS: 10, Edward Bourg, Forest -Side
ID No: M220692290458G
DRIVING LICENSE No: 968 997
EDUCATION:
Institution Degree(s) or Diploma(s) obtained:
University of Central Lancashire (2019 – 2021) Master of Science (MSc) Construction Project Management Visvesvaraya Technological University (2011 – 2016) Bachelor of Engineering (BEng) Civil Engineering PROFESSIONAL REGISTRATION & MEMBERSHIP:
1. CRPE Registration Stage 1 : Eligibility Completed 2. Student Member of Association for Project Management Credential ID: P0394851 PROFESIONAL DEVELOPMENT AND OTHER TRAINING:
1. Introduction to FIDIC 1999 Red Book – Institution of Engineering and Technology CDP (IET) 2. Seminar on Occupational Safety and Health for Employers/Employees in the Construction Sector – Ministry of Labour Industrial Relations, Employment and Training 3. A Talk on Professional Registration – Institution of Engineering and Technology CDP (IET) 4. A Talk on the Transport Sector in Mauritius – Institution of Engineering and Technology CDP (IET) 5. Good Practices in Construction Contractual Documentation: What & How? – Constructing Professional Development
6. ICE HKA G&S Technical webinar on the Integrated Waste Management Facilities – Institution of Civil Engineers, Hong Kong Association
LANGUAGES:
Language Speaking Reading Writing
English Good Excellent Excellent
French Good Good Good
SOFTWARES: MS Office, MS Project, AutoCAD 2D, STAAD PRO (Basic) 2
EMPLOYMENT RECORD:
From [year]To [year] Employer Positions held
January 2018 - Up to now LUXCONSULT (Mtius) LTD Graduate Civil Engineer April 2017 – December 2017 SUPER BUILDERS CO LTD Graduate Civil Engineer April 2016 – March 2017 SNB CONSTRUCTION LTD Works Supervisor 01 July 2015 – 31 July 2015 SINOHYDRO CORPORATION (MAURITIUS) LTD Trainee WORKING EXPERIENCE
Name of assignment or project: Replacement of CWA Pipelines in Rose-Hill and Adjoining Areas Year: JAN 2019 – Up to date
Location: Mauritius
Client or Project Manager: Central Water Authority Positions held and Employer: Graduate Civil Engineer, LUXCONSULT (Mtius) Ltd Activities performed: Assisting Resident Engineer / Assistant Resident Engineer. Supervision of pipe-laying works
Supervision of resurfacing works
Quantity Take Off
Follow ups of progress of works
Progress reports (Incl. Financial Analysis, Cash flow and POW Analysis)
Longitudinal profiles and Hydraulic design review
Interim Payment Certification
Programme of work Analysis ( Planned vs Actual )
Name of assignment or project: Mauritius Metro Express Project Engineering, Procurement and Construction Works
Year: APR 2018 – JUNE 2018
Location: Mauritius
Client or Project Manager: Larsen and Toubro
Positions held and Employer: Graduate Civil Engineer, LUXCONSULT (Mtius) Ltd Activities performed: Re-routing of existing CWA services (Inspection) Name of assignment or project: Consultancy Services for Drain works, Roadwork and Amenities – Design of Storm Water Drains and Cost Estimation of Storm Water Drains and Amenities (Zone 6)
Year: OCT 2018 – AUG 2019
Location: Mauritius
Client or Project Manager: National Development Unit Positions held and Employer: Graduate Civil Engineer, LUXCONSULT (Mtius) Ltd Activities performed: Site Investigations
Assisted in Design of Drainage System
Bill of Quantities, Quantity Take-Off and Cost Estimates Name of assignment or project: Coastal Adaptation Measures for Rivière des Galets, Republic of Mauritius Construction of Rock Revetment structure with Parapet wall at Rivière des Galets
Year: June 2017 – December 2017
Location: Mauritius
Client or Project Manager: Ministry of Environment, Sustainable Development and Disaster and Beach Management
3
Positions held and Employer: Graduate Civil Engineer, Super Builders Co Ltd Activities performed: Following of project correspondences Attending meetings
Topographical Survey.
Drawing (AutoCAD)
Supervision of works.
Cost Estimates
Cash Flow
Interim Payment Applications
Programme of Works Analysis
Progress Reports
Preparation of Test (Overseas)
EOT Application
Name of assignment or project: Stormwater drain at Le Morne Year: 2017
Location: Mauritius
Client or Project Manager: District Council of Black River Positions held and Employer: Graduate Civil Engineer, Super Builders Co Ltd Activities performed: Setting out
Supervision of works.
Name of assignment or project: Construction of Boundary Wall at Curepipe Government School Year: 2016
Location: Mauritius
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Planning of daily activities Measurement
Procurement of materials
Progress follow up
Inspection
Name of assignment or project: Drain works for Plastinax Austral Ltd Year: 2016
Location: Mauritius
Client or Project Manager: Plastinax Austral Ltd
Positions held and Employer: Works Supervisor, SNB Construction Ltd Activities performed: Site Inspection
Name of assignment or project: Renovation of Wards at Victoria Hospital, Quatre Bornes Year: 2016
Location: MAURITIUS
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Setting Out
Planning of daily activities
Assignment of task to subordinates
Measurement and Interim payment application
Procurement of materials
Progress follow up
Inspection
Name of assignment or project: Rehabilitation of Government Building, Floreal Year: 2016
4
Location: MAURITIUS
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Setting Out
Planning of daily activities
Assignment of task to subordinates
Measurement and Interim payment application
Procurement of materials
Progress follow up
Inspection
Name of assignment or project: Rehabilitation of Ministry of Public Infrastructure Workshop, Vacoas Year: 2016
Location: Mauritius
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Setting Out and Site Inspection Planning of daily activities and Progress follow up Assignment of task to subordinates
Measurement and Interim payment application
Procurement of materials
Name of assignment or project: Flooring Works at Dunputh Lallah SSS Year: 2016
Location: MAURITIUS
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Measurement
Interim payment application
Name of assignment or project: Waterproofing works at Forest – Side SSS Year: 2016
Location: Mauritius
Client or Project Manager: Ministry of Public Infrastructure and Land Transport Positions held and Employer: Site Coordinator & Works Supervisor, SNB Construction Ltd Activities performed: Supervision of works.
Measurement
Payment application
Name of assignment or project: Terre Rouge – Verdun Link Road: Treatment of Landslides/Remaining Roadwork on Southbound Carriageway at Ripailles.
Year: July 2015
Location: MAURITIUS
Client or Project Manager: Road Development Authority Positions held and Employer: Trainee, SINOHYDRO CORPORATION LTD Activities performed: Inspection of Pile reinforcement Testing of Concrete (Slump and Compressive Strength Test)