Post Job Free
Sign in

Manager Civil Engineer

Location:
Qibla, Kuwait City, Kuwait
Posted:
July 01, 2020

Contact this candidate

Resume:

Contact Information

***********.*********@*****.***

Address** ******* ****** ****

Phone+965********

Skills

• LOGESTIC

• SUPPLAY CHAIN

• PLANING &

FORWARDING

• CUSTOMER SERVICE

• PROJECT SUPPORT

• HSE Certified (KOC,

ADCO )

• Budget control & cost

control

• Mobilization

• Kuwait,UAE, Russia,

Africa ( projects &

Tender )

• Supply chain Assistance

for Projects requirement

• projects Supervisor

follow up

Languages

Arabic : perfect

English : Perfect

Russian : very good

Ashraf Ammar

Construction & installation engineer PMP &

CMB certified 17 year experience in Kuwait

and UAE Asia Africa

GLS Kuwait ( from OCTOBER 2019 ) KOC

LOGESTIC & supply chain CORDINATOR

Responsibility:

External Analysis for the industry environment related to HCL Logistic for our Factory yard in ABDALY and coordinator between our fleet & KSA activity to our Clint contractor work related to Drilling in Oil rigs ( North Area )

Hazard material handling, work permits, time schedule, time sheet for Our team, maintenance, HSE plan, Tool Box Talk, Safety induction, IVMS,

General Cable project Division Asia & Middle east (Abu Dhabi ) Branch

Projects and business Development Manager ( 2012 up 2018 ) Projects manager for more than 5 major projects in UAE Abu Dhabi

(TRANSCO) for underground cable & OHL 132KV - 220KV transport lines.

Responsibilities:

• Hatching the copper & lead for our projects

• Coordination between our Factory in FRANCE and QC\QM with our client

• Logistics coordination ( sea & Air forwarding )

• Planning the schedule to be online with projects time line

• Handlin the goods from Port to the Yard ( Loading, Trucks, Crane )

• Installation and hookup the OHL to the associated GRID and Sub- Stations.

• Projects installation and subcontractor interface manger (contracts cash flow follow-up, monitor and follow the work schedule, propose the action plan for any recovering plan)

• Coordination between site and manufactures to meet the schedule requirements and the project scope.

• Coordination and management of the stakeholders to monitor the Progress and approve the changes.

ICAD project 4610 A from May -2008 to Aug -2009

Projects manager

Responsible for the schedule of the projects to be achieved under 48 week

including civil work, towers installation & delivery, installation and commissioning for OHL and connection with underground Cable handling all the logistics work related to our Cable drum and creates mobilization the material to site works

RAHA 4887A From 2009 up to October 20010:

Project manger

• Connection between S/T 132Kv to S/T S 18 Sub-station Line 1 to complete the power supply for Formula one Race in YASS ISLAND.

• Civil work including HDD crossing channel and High Way crossing NDRC implemented OHL outdoor termination and indoor termination

• Connection from Tawelah to RAHA & hock up with main GRD REAM ISLAND 7022 A From 2010 up to 2011

Project Manger

Cleve Land Hospital power supply was the Target for completion in 180 Day including civil sea channel crossing 980M and underground services relocation OHL with new Sea pile

7015 N AL AIN From 2011 March up to May 2014

Supervising the project manager ( schedule, bass line, Testing …) Project was high important to supply the power to AL AIN airport the project schooled

14 months project converted in Fast truck project 9 months Completed and handed over to client as per the requirements. Including testing and eructation of the Tower’s cable laying

N- 57938 MAHAWA From 2014 up to May 2017:

Project manager :

Nominated to be the Project manager by TRANSCO ( client ) for 400 M$ projects

MAHAWA is the new capital area; The scope is to connect 5 Substations with the new Power plant through 123Km new OHL – 400KV power line. Cash flow, cost control planning activity subcontractors overlapping projects organization chart, HSE, construction meeting Client weekly & monthly Optioning the NOC from utilities, engineering, shop Drawing, design, All activity controlled and processed from our team in the branch Cegelec France Abu Dhabi Branch: Aug 2004 to Ju 2008 Lead construction & Logistic engineer:

Working for Cegelec Abu Dhabi for major projects for ADCO & GASCO

• Project for connecting the Oil fields with the Main Grid of Abu Dhabi on 132KV in BAB Area.

• Installation of 20 Km OHL-33KV with few Gantry.

• Distribution network along with different Step-Down transformers to use TRANSCO energy.

• Camp labor 320 persons buss and leave days was reported to me

• Responsible for civil work and the fleet control of our Trucks,pick up

, Crane 50 Ton and transporting the Transformers from the port to the site location

• Handling the material delivers for and to the store, controlling the Gate pass for machinery and vehicle with all associated IVMS reporting to ADCO HSE and monitoring to the stakeholders. Civil construction Supervisor : PIC ( Ammonia refinery Kuwait ) Cegelec Kuwait : from Mar -2002 up to 2004 Aug

Working for PIC Kuwait for refurbishment the Old main control room ( MCR) construction new Technical Room ( 9 new ) work including supervisor the civil contractor and handling the client and consultant daily inspection . Engineering and calculation for the plant HSE plan was implanted by our team

,

Marital handling from port to our store yard was conducted by our team during all project duration

Civil Engineer

IBC KuwaitMarch-2002

June-2003

Civil engineer assisting the PM for construction 128 Villa in Mangaf area Work included asphalt and underground services

Education

Bachelor of civil engineering

University of 6 October cairoCairo2002

Achievement

Training new team member to be infused in the construction work to reduce the cost for the overseas contract for man power supply ( expert, Technician, ) Supply chain for middle east projects with client approval for the construction data to be implemented in the supply list ( out venders for Steel work, supply of termination with new Tech

Creating the construction team for projects in UAE &France to be implemented overseas projects ( India Seri lank Russia Africa ) Certifications

Bachelor of engineering construction

PMP & CMB certified USA

Risk Management ( RM)

Certified Public Accountant (CPA) certificate, #D54617398A, Courses

HSE KOC field 2020

HSE KOC CBR 2020

HSE KOC FIRE FITING 2020

HSE KOC H2s Protection 2020

HSE KOC PTW 2020

Team leader for HSE Desert Driving ADCO 2006

IVMS control ADCO

GASCO Abu Dhabi work permit

Honors & Awards

1st place, Best Senior Thesis prize for 2013

$2,500 prize and honorary plaque

Best satisfaction project manager from Silec cable Spain 2011



Contact this candidate