Experienced, and knowledgeable Construction Superintendent, Maintenance Supervisor, and Journeymen Union Pipefitter with more than 14 years’ experience in all facets construction, and maintenance, including project management, safety, as well as field installation and repair of equipment and process piping.

KEY SKILLS

• Planning, and Project Management of new

construction, existing maintenance, and

capital improvements in the heavy industrial

and commercial sectors with focus on MEP.

• Develop craft schedule to establish

sequence and lead time of each operation to

meet client forecasted master schedule.

• The ability to produce and track a budget

and an understanding of financial

statements.

• Knowledge of and proficient with MS office

products (Excel, Project, Words, Etc).

• Proficient in the use of ERP software

including Primavera P6, Primavera Contract

Manager, SAP, and Maximo.

• Experience with PLC, RS Logic, and

vision systems

• OHSA 30 Hour Construction Safety

• knowledge and understanding of health and

safety OSHA regulatory requirements.

• Experienced in Process Safety

Management

• Experienced in OSHA recordkeeping

including the OSHA 300 log.

• The ability to work smoothly with a union

work force, knowledge of collective

bargaining agreements, and labor relations.

• Demonstrated knowledge of Workers

Compensation policies and procedures.

• Certified in Infection Control and Risk

Assessment (ICRA) for in hospital

construction and maintenance.

• Journeymen Union Pipefitter

EMPLOYMENT SUMMARY

WPG-LPI - Plumbing / HVAC Superintendent

08/2018 - 12/2018 Boston Massachusetts

Oversight of multiple Plumber/ HVAC crews as well as support crafts on a multi city natural gas emergency restoration work on a total of 8500 homes and businesses. Scheduling of work flows to ensure smooth transition from walk trough of the Mechanical equipment and piping to close out.

Frozen Specialties – Maintenance Supervisor

08/2018 – Present – Archbold Ohio

Maintenance shift supervisor in a union environment with responsibility for the preventative maintenance program as well as general plant maintenance. Supervision of a crew of multi craft maintenance personal in an operating food production facility, ensuring that the highest standards in safety, and quality while performing the maintenance tasks in a timely manner in accordance with the HACCP program.

ProMedica Toledo Hospital Generations of Care Tower Project – Owners Representative 05/2017 – 8/2018 – Toledo Ohio

Owners on site safety manager and OCIP representative. Oversight of the project safety program and Owners Controlled Insurance Policy (OCIP), working hand in hand with the Insurance provider to ensure that all Worker Compensation claims were submitted accurately and in a timely manner. Conduct incident and injury investigations. Work hand and hand with the Prime Contractor and all sub tier contractors to ensure compliance with the site safety plan. General Motors- Global Facilities – General Superintendent Toledo Ohio 11/2016 -04/2017 Toledo Transmission Expansion Project

General Superintendent Facilities and Maintenance with oversight of union craft workers and contractor work to ensure compliance with the General Motors schedule, safety, quality, and environmental protection policies. Worked with the design team and field engineering to review DCR/RFI requests and issue the proper work orders or bulletins as needed and follow up to ensure timely and cost-effective completion of the work. Performed daily safety audits of the jobsite, and conducted incident investigations.

Cherne Construction – General Foremen Instrumentation Lima Ohio Potash Corporation Plant Expansion 05/2014 – 02/2015 Supervision of multiple disciplined union journeymen and apprentice craft workers working on the instrumentation system layout, and installation. Working closely with the client to ensure proper installation according to field drawings, P&ID's, and verbal instruction in a complex chemical plant expansion project.

RMF/NOOTER – Mechanical General Foremen, Lima, OH

Husky Energy Spring 2016 Outage and Furnace installation 09/2015 – 05/2016 Oversaw multiple crews of union pipefitters and welders in the assembly, installation of piping systems, and associated equipment working from field drawings, P&ID's, and verbal instruction on capital improvement refinery projects as well as on TAR projects. Oversight of safe work practices in the shut down and startup of the refinery units, as well as overseeing the supplied air program. Titan Construction and Leasing – Pipefitter General Foremen Owensboro, KY Owensboro Municipal Unities Coal Fired Power Plant Renovation 02/2007 – 05/2007 Assist the lead planner and field engineer with the planning of the piping system layout, and installation on a 425MW coal burning power plant shutdown. Assisting in maintaining of the schedule for the project using Primavera P6 software. Supervise numerous craft foremen and perform job audits to ensure that the project work was being performed in a safe and efficient manner Fagen Inc. – Mechanical Superintendent, Various Locations several different projects, Ethanol Plant Construction Varying time frames from 2006 - 2009 Supervision of multiple crews of journeymen pipefitters working on piping system layouts, and installation. Working closely with the client to ensure proper installation according to field drawings, P&ID's, and verbal instruction on new construction Ethanol Refinery’s. Oversight of work crews to ensure safe work practices and compliance with governmental regulations. Horizon Mechanical – Piping Superintendent Facilities Maintenance, Fort Wayne, IN Steel Dynamics Steel Mill Maintenance, and Capital Improvements 03/2003 – 05/2006 Supervision of a small crew of journeymen pipefitters working on piping system layouts, and installation while working closely with the client to plan the maintenance projects to ensure proper installation according to steel mill plant guidelines as well as capital improvement projects. Azco Integrated Systems – Union Pipefitter Oregon Ohio 05/2016 – 09/2016 Oregon Clean Energy Project

Journeymen union pipefitter working on the assembly and installation of piping systems and associated equipment on a new construction natural combined cycle power plant. United Piping Systems – Union Pipefitter Fort Wayne Indiana 09/2016 – 11/2016 General Motors Truck Plant Expansion Project

Assembly, and installation of bent tube piping system, and associated equipment for the paint booths working from field drawings, P&ID's, and verbal instruction. CTS – Journeymen Union Pipefitter Lima Ohio 01/2014 – 05/2014 Assemble, and install piping system, and associated equipment working from field drawings, P&ID's, and verbal instruction on a refinery swoop down project. Gem Construction –Union Pipefitter Lima, OH Various times between 2010-2016 Assemble, and install piping system, and associated equipment working from field drawings, P&ID's, and verbal instruction on new construction refinery projects as well as on TAR projects. Smith Boughan Mechanical Services – Union Pipefitter Russel’s Point OH 03/2013 – 10/2013 Assemble, and install piping system, and associated equipment working from field drawings, P&ID's, and verbal instruction on the Honda Transmission Plant Expansion. Jacobs Construction – Union Pipefitter, Lima, OH Various times between 2010-2016 Assemble, and install piping system, and associated equipment working from field drawings, P&ID's, and verbal instruction on new construction chemical plant projects as well as on shutdown projects. IPS – Union Pipefitter, Lima, OH 05/2011 – 02/2012 Assemble, and install of the chilled water and potable water piping system, and hook up to the CNC associated equipment working from field drawings, P&ID's, and verbal instruction on an expansion project at Ford Motor Company.

United Industrial Piping – Pipefitter Foreman Various Locations, and times between 2006-2009 Supervision of multiple craft crews of journeymen working on mechanical and piping system layout, and installation on new construction projects in the Petro/Chemical Industry.

.Casey Industrial – Pipefitter, Leipsic, OH 06/2006 -01/2007 Assemble, and install piping system, and associated equipment working from field drawings, P&ID's, and verbal instruction on new construction ethanol Refinery Dilling Mechanical - Pipefitter, Fort Wayne IN Various times between 2004-2009 SDI Steel Mill

Supervision of a small crew of journeymen pipefitters working on piping system layouts, and installation on preventive maintenance projects in a steel mill. Campbell Soup Company – Plant Maintenance, Napoleon OH 04/1999 – 03/2003 Preventative maintenance on mechanical equipment, electrical systems, and process piping. PLC troubleshooting, basic pipefitting, plumbing, and orbital welding of sanitary food grade tube. EDUCATION, CERTIFICATIONS,

• Ashworth College (Norcross GA) – Bachelor of Arts - Business Administration, 2018

• Washtenaw Community College (Ann Arbor MI) – A.A. Construction Management, 2013

• Northwest State Community College (Archbold OH) – Diploma, Mechatronics, 1998

• Alison Online Training Institute (Online) – Diploma, Project Management, 2014

• Microsoft Corporation (Online) –Diploma, Microsoft Project for Project Management

• UA Local 776 (Lima Ohio) – Journeymen Pipefitter, 2010

• UBC/ IKORCC (Toledo Ohio) – Certificate Infection Control and Risk Assessment for Health Care Facility Construction and Maintenance.

• NEHA (Archbold Ohio) – Certificate NEHA/HACCP Food Handler course

• American Red Cross – CPR/AED/First Aid Certification



Contact this candidate