Post Job Free

Resume

Sign in

Mechanical Engineer Piping

Location:
Indonesia
Salary:
5500 USD/Month
Posted:
June 29, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

I. PERSONAL

Name : Feri Noviardi, ST

Place / Date of Birth : Balai Tengah, February 4-th 1986

Address : Jl. Kanayakan Cihaur No 23 A, Dago,

Coblong. Bandung, Indonesia, 40135

Hand phone : +62-813-****-****

Email : add6mb@r.postjobfree.com

Passport : B8341838

Total Experience : > 10 Years

TOEFL : 550

Expected Salary : Negotiable

Contents:

I.Personal : Page 1

II.Education Back Ground : Page 1

III.Work Experience : Page 1

IV.Course & Training Record : Page 2

V.Skills & Experience : Page 2

VI.Expertise : Page 3

VII.Details Work Experience : Page 4-6

VIII.Organizational Experience : Page 6

IX.Certificate : Page 7-8

X.Referrals : Page 8

II. EDUCATION BACKGROUND

Years Attended

Name of School / University

Location

Major

Degree

GPA

2009 - 2011

Institute Sains & Technology

Medan

Mechanical Engineering

Bachelor

3.36 Scale 4

2006 - 2009

Swiss Mechanics-Bandung Institute of Technology

Bandung

Mechanical Engineering

Diploma

3.02 Scale 4

III. WORK EXPERIENCE

Period

Position

Company

Location

2017 – Present

(See Page 4)

Project Engineer

EXXONMOBIL

Cepu, Indonesia

2014 – 2017

(See Page 5)

Senior Piping & Mechanical Engineer

PT PERTAMINA EP

Asset 1, CTDP, BBS & ABG Dev Project

2011 – 2014

(See Page 6)

Piping & Mechanical Engineer

PT. CONTROL SYSTEM

Jakarta

2009 – 2011

(See Page 6)

Piping Engineer

PT. TORGANDA

Medan

IV. COURSE / TRAINING RECORD

Certification/Seminar/Course

Description

Institution

Location

H2S Level II

Training

(Certified)

Bima Nusantara

Cepu

WAH (Working at Height) Level II

Training

(Certified)

Bima Nusantara

Bojonegoro

Welding Inspector

Training

(Certified)

Welding Study Centre

Cepu

Piping Material Selection

Training

Pertamina EP

Jakarta & Bandung

Pipe Stress Analysis "Caesar II"

Training (Certified)

Ap-Greid

Jakarta

Pressure Vessel Design "PV Elite"

Training (Certified)

Ap-Greid

Jakarta

Corrosion Engineer

Training (Certified)

Ap-Greid

Jakarta

Process Engineering Design for Oil & Gas (HYSYS)

Training (Certified)

Ap-Greid

Jakarta

Indonesian Professionals Certification Body Metalworks Machinery Indonesia in the field of Casting and Molding

Certification

Polytechnic of Manufacture Bandung

Jakarta

V. SKILLS & EXPERIENCE

Computer Skill

ICAPS Commissioning, Autocad & Cadworx, PDMS, Piping / Caesar II, Process (HYSYS & PipeSim), Pressure Vessel Design, Corrosion, Primavera

PERSONAL SKILL & EXPERIENCE SUMMARY

More than Ten (10) years experiences in the Static & Rotating Equipment (Piping & Pump) and Detail Design of various projects for oil & gas, That are :

Two (2) years of experience as a Piping Engineer

Proficient in Piping Design tools : Caesar II, PDMS, HYSIS, PV ELITE, Solidwork, Autocad.

Familiar with design codes and standards related to oil and gas, petroleum/chemical refineries like ASME B31.3, B31.1, B31.4, B31.8, ASTM, API.

Six (6) years of experience as a Piping & Mechanical Engineer in overseeing reliability & maintenance activities mainly for Static & Rotating equipment

Experience in asset integrity management for safety, reliability & quality

Experience in root cause analysis condition monitoring analysis

Inventory management

Two (2) years of experience as a Project Engineer

Good Knowledge in both Pumps, Compressor, Piping Design,Piping Stress Analysis, Corrosion, Pressure Vessel Design, Process Engineering Design & Process Safety.

Project Development

As a engineer in department Production Project at PERTAMINA & EXXON MOBIL (The Biggest Oil & Gas Company in my Country), I was involved from the initiation stage until commissioning phase for the project below :

5 years of experience in operating and Commissioning of Oil & Gas Processing facilities & Field developments

5 years experience in a similar position on pre-commissioning and commissioning projects

Specific Process Units experience relevant to the project (CPF, Oil/Gas Separation, Gas lifted wells ) & Utilities.

Project Experience :

-Gas Injection Compressor

-Gas Lift Compressor

-Cooler

-GHCU

-Flare System

-Glycol Pump

-Dehydrator Pump

-Skimming Pump

-Transfer Pump

-AGE & AGRU

-JTB Tie - In

-Shutdown 2018 & 2020

To support the success of the above project we use adequate software, such as: ICAPS Commissioning, Autocad & Cadworx, PDMS, Piping / Caesar II, Process (HYSYS & PipeSim), Pressure Vessel Design, Corrosion, Primavera

VI. EXPERTISE

PROJECT DEVELOPMENT AND MANAGE CONTRACTS OF PROJECTS :

oManage and Control Contract of Projects.

oAssist project teams on matters concerning claims, contentious commercial issues and disputes across all contracts on projects.

oCoordination with SCM to provide contract strategy of project development.

ROTATING EQUIPMENT :

oOversee the installation & maintenance of rotating equipment i.e. pumps, compressors.

oLead assessments and maintenance programs to enhance asset integrity & reliability.

oConduct root cause analysis and ensure to follow up for safety, reliability & quality.

oAnalyze trends for condition monitoring i.e. vibration monitoring, oil particle.

oSupport and participate in projects and turnaround events from initial planning, preparations to execution and post event reviews.

PIPING DESIGN :

oEquipment Layout Design based on project spacing guidelines.

oPipe rack design, Pump/Exchanger/column Piping Layout & Design..

oModeling for pipe Routing & Equipment.

PIPE STRESS ANALYSIS :

oPerform Stress Analysis of Piping systems using CAESAR II software to qualify piping in accordance with ASME codes, specialized in suction Pump Pipe & Compressor Pipe.

oEvaluate calculated stress results, displacements, and pipe support loads.

oCalculate stress form nozzle equipment and flange leakage check.

SAFETY :

oActive in the Permit review & Permit meeting

oLoss Prevention Observation (LPO)

oActive in the investigation team

VII. WORK EXPERIENCE

EXXONMOBIL

Periode : November 2017 - Present

Position : Project Engineer

Job Desc :

Initiation Phase:

Develop Design Basis

Develop Calculation

Prepare Material Specification and Data sheet

Prepare OE (Owner Estimate).

Develop Time Schedule

Develop MOC (Management of Change)

Presentation to management & related group

Preparation Phase:

Check and Review Drawing

Prepare Piping & Pipeline Stress Analysis Basis

Prepare Material Requisition

Prepare and develop tender package and establish scope statement refer to POD/AFE and based on information from Engineering (Specification, Drawing, MTO), QC (QA Plan and ITP),Construction (Construction Plan), Project Team (WBS, Schedule, Scope of Works and Schedule of Rates), HSE (HSE Plan and Requirement).

Implementation Phase:

Responsible for the management of Mechanical construction activities.

Monitors contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings.

Review permit for all activities of contractor

Checks and authorizes all claims for payment from all contractors involved in section of the project to assure accuracy and that proper contractual obligations are met.

Commissioning Phase:

Monitoring the Mechanical completion system implementation

Validation of Systems/Subsystems/Tagging

Verification of procedures for compliance with project design and manufacturer’s recommendations

Ensuring pre-commissioning and commissioning activities are phased in the planned sequence and within the approved schedule

Monitoring and expediting spare parts availability and specialized contractors’ mobilization

Witnessing pre-commissioning activities and monitoring B-ITRs preparation and uploading in the MC database

Witnessing commissioning activities and monitoring C-ITRs preparation and uploading in the MC database

Participating to and facilitating the completion walk-down activities

Monitoring and expediting punch-lists management and punch items close out

Facilitating systems’ hand-over to start-up or operations

My Project :

Gas Injection Compressor Improvement (2017 – 2018)

Gas Lift Compressor Improvement (2019)

Upgrading Flare System (2018)

Upgrading Glycol Pump (2018)

Upgrading Dehydrator Pump (2018 – 2019)

Upgrading Skimming Pump (2018 – 2019)

Shutdown 2018 & 2020

PT. PERTAMINA EP

Periode : January 2014 – October 2017

Position : Senior Piping & Mechanical Engineer

Job Desc :

Responsible for the management of piping construction activities.

Monitors contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings.

Prepare Design Basis

Prepare Calculation

Prepare OE (Owner Estimate).

Prepare Material Specification and Data sheet

Prepare Material Requisition

Prepare Piping & Pipeline Stress Analysis Basis

Establishment Material Service Class

Check and Review Drawing:

Oversee the installation & maintenance of rotating equipment i.e. pumps, compressors.

Lead assessments and maintenance programs to enhance asset integrity & reliability.

Conduct root cause analysis and ensure to follow up for safety, reliability & quality

My Project :

Trunkline 10 Inch 27 KM, Flowline 4 & 6 Inch CTDP Pondok Makmur

Pipig & Pipeline HPCS (High Pressure Compressor Station) Rantau Field.

Suban Compression Project.

Trunkline gas from SP XVII to Sungai Buluh Rantau Field

Loading Line 20 " – Pangkalan Susu Field - North Sumatra

Upgrading Pipa Export - Import Bentayan - Ramba Field - Palembang

Trunkline from SPV to Ukui - Lirik Field – Riau.

Upgrading Trunkline from Sei Gelam to Jumper Line - Jambi Field.

Water Distribution Pipe (HDPE) From WTP to MGS – Pangkalan Susu Field – North Sumatra

Distribution Line & Injection Station (SP-VII) c/w Cartridge Filter Rantau Field.

Production Tank 2000 BBLS, 5000 BBLS (Welded & Bolted)

PT. CONTROL SYSTEM

Periode : October 2011 - January 2014

Position : Piping & Mechanical Engineer

Job Desc :

Where budget bid enquires are prepared, check technically both the issuance and bid analysis that they are of the correct quality.

Responsible for undertaking, piping, painting and insulation design reviews in accordance with appropriate technical standards and specifications associated with the services provided by the Engineering Contractor.

Ensure that the local Tie-ins and As Built documentation are reviewed correctly and correctly taken into the design. Resolve problems in 3D environment

Prepare and participate in design reviews and other meetings, as necessary

My Project :

Custody Gas Metering - VICO CBM (Kalimantan) Gas Metering Package Petrochina Jabung (Jambi)

Meter Tube Star Energy (Kakap).

Meter Tube Conoco Phillips (South Belut).

PT. TORGANDA

Periode : October 2009 – October 2011

Position : Piping Design

Job Desk :

Design & Drafting Piping Lay Out.

Tie-in Plan drawing

Piping Route Underground Drawing

Isometric Drawing & MTO Detail Drawing

VIII. ORGANIZATIONAL EXPERIENCES

Place

Position

Year

INDONESIA

Captiva Community Indonesia

Present

POLMAN BANDUNG

Chairman of Jansen Foundation

2006 – 2009

POLMAN BANDUNG

Vice Chairman of Minang Saiyo Polman

2007 – 2008

IX. CERTIFICATE

X. REFERAL

Name

Title Position

Company

Email

Phone

Khalid Septiandri

Engineer

ExxonMobil

add6mb@r.postjobfree.com

081*********

Panglima Machmud SA

Senior SF Engineer

PT Pertamina EP

add6mb@r.postjobfree.com

082*********

Anes Danubrata

Surface Facility Engineer

PT Pertamina Ep Asset 1

add6mb@r.postjobfree.com

081********

I hereby certify that the above information is true and correct.



Contact this candidate