CURRICULUM VITAE
I. PERSONAL
Name : Feri Noviardi, ST
Place / Date of Birth : Balai Tengah, February 4-th 1986
Address : Jl. Kanayakan Cihaur No 23 A, Dago,
Coblong. Bandung, Indonesia, 40135
Hand phone : +62-813-****-****
Email : add6mb@r.postjobfree.com
Passport : B8341838
Total Experience : > 10 Years
TOEFL : 550
Expected Salary : Negotiable
Contents:
I.Personal : Page 1
II.Education Back Ground : Page 1
III.Work Experience : Page 1
IV.Course & Training Record : Page 2
V.Skills & Experience : Page 2
VI.Expertise : Page 3
VII.Details Work Experience : Page 4-6
VIII.Organizational Experience : Page 6
IX.Certificate : Page 7-8
X.Referrals : Page 8
II. EDUCATION BACKGROUND
Years Attended
Name of School / University
Location
Major
Degree
GPA
2009 - 2011
Institute Sains & Technology
Medan
Mechanical Engineering
Bachelor
3.36 Scale 4
2006 - 2009
Swiss Mechanics-Bandung Institute of Technology
Bandung
Mechanical Engineering
Diploma
3.02 Scale 4
III. WORK EXPERIENCE
Period
Position
Company
Location
2017 – Present
(See Page 4)
Project Engineer
EXXONMOBIL
Cepu, Indonesia
2014 – 2017
(See Page 5)
Senior Piping & Mechanical Engineer
PT PERTAMINA EP
Asset 1, CTDP, BBS & ABG Dev Project
2011 – 2014
(See Page 6)
Piping & Mechanical Engineer
PT. CONTROL SYSTEM
Jakarta
2009 – 2011
(See Page 6)
Piping Engineer
PT. TORGANDA
Medan
IV. COURSE / TRAINING RECORD
Certification/Seminar/Course
Description
Institution
Location
H2S Level II
Training
(Certified)
Bima Nusantara
Cepu
WAH (Working at Height) Level II
Training
(Certified)
Bima Nusantara
Bojonegoro
Welding Inspector
Training
(Certified)
Welding Study Centre
Cepu
Piping Material Selection
Training
Pertamina EP
Jakarta & Bandung
Pipe Stress Analysis "Caesar II"
Training (Certified)
Ap-Greid
Jakarta
Pressure Vessel Design "PV Elite"
Training (Certified)
Ap-Greid
Jakarta
Corrosion Engineer
Training (Certified)
Ap-Greid
Jakarta
Process Engineering Design for Oil & Gas (HYSYS)
Training (Certified)
Ap-Greid
Jakarta
Indonesian Professionals Certification Body Metalworks Machinery Indonesia in the field of Casting and Molding
Certification
Polytechnic of Manufacture Bandung
Jakarta
V. SKILLS & EXPERIENCE
Computer Skill
ICAPS Commissioning, Autocad & Cadworx, PDMS, Piping / Caesar II, Process (HYSYS & PipeSim), Pressure Vessel Design, Corrosion, Primavera
PERSONAL SKILL & EXPERIENCE SUMMARY
More than Ten (10) years experiences in the Static & Rotating Equipment (Piping & Pump) and Detail Design of various projects for oil & gas, That are :
Two (2) years of experience as a Piping Engineer
Proficient in Piping Design tools : Caesar II, PDMS, HYSIS, PV ELITE, Solidwork, Autocad.
Familiar with design codes and standards related to oil and gas, petroleum/chemical refineries like ASME B31.3, B31.1, B31.4, B31.8, ASTM, API.
Six (6) years of experience as a Piping & Mechanical Engineer in overseeing reliability & maintenance activities mainly for Static & Rotating equipment
Experience in asset integrity management for safety, reliability & quality
Experience in root cause analysis condition monitoring analysis
Inventory management
Two (2) years of experience as a Project Engineer
Good Knowledge in both Pumps, Compressor, Piping Design,Piping Stress Analysis, Corrosion, Pressure Vessel Design, Process Engineering Design & Process Safety.
Project Development
As a engineer in department Production Project at PERTAMINA & EXXON MOBIL (The Biggest Oil & Gas Company in my Country), I was involved from the initiation stage until commissioning phase for the project below :
5 years of experience in operating and Commissioning of Oil & Gas Processing facilities & Field developments
5 years experience in a similar position on pre-commissioning and commissioning projects
Specific Process Units experience relevant to the project (CPF, Oil/Gas Separation, Gas lifted wells ) & Utilities.
Project Experience :
-Gas Injection Compressor
-Gas Lift Compressor
-Cooler
-GHCU
-Flare System
-Glycol Pump
-Dehydrator Pump
-Skimming Pump
-Transfer Pump
-AGE & AGRU
-JTB Tie - In
-Shutdown 2018 & 2020
To support the success of the above project we use adequate software, such as: ICAPS Commissioning, Autocad & Cadworx, PDMS, Piping / Caesar II, Process (HYSYS & PipeSim), Pressure Vessel Design, Corrosion, Primavera
VI. EXPERTISE
PROJECT DEVELOPMENT AND MANAGE CONTRACTS OF PROJECTS :
oManage and Control Contract of Projects.
oAssist project teams on matters concerning claims, contentious commercial issues and disputes across all contracts on projects.
oCoordination with SCM to provide contract strategy of project development.
ROTATING EQUIPMENT :
oOversee the installation & maintenance of rotating equipment i.e. pumps, compressors.
oLead assessments and maintenance programs to enhance asset integrity & reliability.
oConduct root cause analysis and ensure to follow up for safety, reliability & quality.
oAnalyze trends for condition monitoring i.e. vibration monitoring, oil particle.
oSupport and participate in projects and turnaround events from initial planning, preparations to execution and post event reviews.
PIPING DESIGN :
oEquipment Layout Design based on project spacing guidelines.
oPipe rack design, Pump/Exchanger/column Piping Layout & Design..
oModeling for pipe Routing & Equipment.
PIPE STRESS ANALYSIS :
oPerform Stress Analysis of Piping systems using CAESAR II software to qualify piping in accordance with ASME codes, specialized in suction Pump Pipe & Compressor Pipe.
oEvaluate calculated stress results, displacements, and pipe support loads.
oCalculate stress form nozzle equipment and flange leakage check.
SAFETY :
oActive in the Permit review & Permit meeting
oLoss Prevention Observation (LPO)
oActive in the investigation team
VII. WORK EXPERIENCE
EXXONMOBIL
Periode : November 2017 - Present
Position : Project Engineer
Job Desc :
Initiation Phase:
Develop Design Basis
Develop Calculation
Prepare Material Specification and Data sheet
Prepare OE (Owner Estimate).
Develop Time Schedule
Develop MOC (Management of Change)
Presentation to management & related group
Preparation Phase:
Check and Review Drawing
Prepare Piping & Pipeline Stress Analysis Basis
Prepare Material Requisition
Prepare and develop tender package and establish scope statement refer to POD/AFE and based on information from Engineering (Specification, Drawing, MTO), QC (QA Plan and ITP),Construction (Construction Plan), Project Team (WBS, Schedule, Scope of Works and Schedule of Rates), HSE (HSE Plan and Requirement).
Implementation Phase:
Responsible for the management of Mechanical construction activities.
Monitors contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings.
Review permit for all activities of contractor
Checks and authorizes all claims for payment from all contractors involved in section of the project to assure accuracy and that proper contractual obligations are met.
Commissioning Phase:
Monitoring the Mechanical completion system implementation
Validation of Systems/Subsystems/Tagging
Verification of procedures for compliance with project design and manufacturer’s recommendations
Ensuring pre-commissioning and commissioning activities are phased in the planned sequence and within the approved schedule
Monitoring and expediting spare parts availability and specialized contractors’ mobilization
Witnessing pre-commissioning activities and monitoring B-ITRs preparation and uploading in the MC database
Witnessing commissioning activities and monitoring C-ITRs preparation and uploading in the MC database
Participating to and facilitating the completion walk-down activities
Monitoring and expediting punch-lists management and punch items close out
Facilitating systems’ hand-over to start-up or operations
My Project :
Gas Injection Compressor Improvement (2017 – 2018)
Gas Lift Compressor Improvement (2019)
Upgrading Flare System (2018)
Upgrading Glycol Pump (2018)
Upgrading Dehydrator Pump (2018 – 2019)
Upgrading Skimming Pump (2018 – 2019)
Shutdown 2018 & 2020
PT. PERTAMINA EP
Periode : January 2014 – October 2017
Position : Senior Piping & Mechanical Engineer
Job Desc :
Responsible for the management of piping construction activities.
Monitors contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings.
Prepare Design Basis
Prepare Calculation
Prepare OE (Owner Estimate).
Prepare Material Specification and Data sheet
Prepare Material Requisition
Prepare Piping & Pipeline Stress Analysis Basis
Establishment Material Service Class
Check and Review Drawing:
Oversee the installation & maintenance of rotating equipment i.e. pumps, compressors.
Lead assessments and maintenance programs to enhance asset integrity & reliability.
Conduct root cause analysis and ensure to follow up for safety, reliability & quality
My Project :
Trunkline 10 Inch 27 KM, Flowline 4 & 6 Inch CTDP Pondok Makmur
Pipig & Pipeline HPCS (High Pressure Compressor Station) Rantau Field.
Suban Compression Project.
Trunkline gas from SP XVII to Sungai Buluh Rantau Field
Loading Line 20 " – Pangkalan Susu Field - North Sumatra
Upgrading Pipa Export - Import Bentayan - Ramba Field - Palembang
Trunkline from SPV to Ukui - Lirik Field – Riau.
Upgrading Trunkline from Sei Gelam to Jumper Line - Jambi Field.
Water Distribution Pipe (HDPE) From WTP to MGS – Pangkalan Susu Field – North Sumatra
Distribution Line & Injection Station (SP-VII) c/w Cartridge Filter Rantau Field.
Production Tank 2000 BBLS, 5000 BBLS (Welded & Bolted)
PT. CONTROL SYSTEM
Periode : October 2011 - January 2014
Position : Piping & Mechanical Engineer
Job Desc :
Where budget bid enquires are prepared, check technically both the issuance and bid analysis that they are of the correct quality.
Responsible for undertaking, piping, painting and insulation design reviews in accordance with appropriate technical standards and specifications associated with the services provided by the Engineering Contractor.
Ensure that the local Tie-ins and As Built documentation are reviewed correctly and correctly taken into the design. Resolve problems in 3D environment
Prepare and participate in design reviews and other meetings, as necessary
My Project :
Custody Gas Metering - VICO CBM (Kalimantan) Gas Metering Package Petrochina Jabung (Jambi)
Meter Tube Star Energy (Kakap).
Meter Tube Conoco Phillips (South Belut).
PT. TORGANDA
Periode : October 2009 – October 2011
Position : Piping Design
Job Desk :
Design & Drafting Piping Lay Out.
Tie-in Plan drawing
Piping Route Underground Drawing
Isometric Drawing & MTO Detail Drawing
VIII. ORGANIZATIONAL EXPERIENCES
Place
Position
Year
INDONESIA
Captiva Community Indonesia
Present
POLMAN BANDUNG
Chairman of Jansen Foundation
2006 – 2009
POLMAN BANDUNG
Vice Chairman of Minang Saiyo Polman
2007 – 2008
IX. CERTIFICATE
X. REFERAL
Name
Title Position
Company
Phone
Khalid Septiandri
Engineer
ExxonMobil
add6mb@r.postjobfree.com
Panglima Machmud SA
Senior SF Engineer
PT Pertamina EP
add6mb@r.postjobfree.com
Anes Danubrata
Surface Facility Engineer
PT Pertamina Ep Asset 1
add6mb@r.postjobfree.com
I hereby certify that the above information is true and correct.