Post Job Free

Resume

Sign in

Plant Social Media

Location:
Fereej Ibn Dirhem, Qatar
Salary:
5000
Posted:
June 25, 2020

Contact this candidate

Resume:

Paresh Ajmeri

LNG Process Operation Supervisor / DCS Panel Co Room Operator

Professional Summary: -

Highly energetic, Respected and self-motivated professional with more than 23 years of

Hydrocarbon Industry working experience out of which 12Years in LNG Operation experience. Extensive experience in LNG Mega Trains Pre-commissioning,

Commissioning, Start-up, Shutdown and Trouble shooting. Highly skilled in Chemical process operation and maintaining the key performance indicators and ensuring the mandatory training of subordinates. Proven ability to lead the multinational team professionally during LNG Train Commissioning, Start Up and normal Operation. Consistently receive outstanding feedback from managers, co-workers and third party interactions.

I have strong experience to develop of Safety Operational Management System Procedures (Work Permit and Safety Works, Management of Change, Incident/Near Miss Management, Emergency Response, etc.)

I am experienced to ensure that the project documents are prepared, reviewed, approved and issued as per company controlled discipline i.e. Documents corresponding, Document review and approval, Document distribution matrix, Engineering document procedure and final document preparation.

I have strong management skill, leadership and knowledge for Operation Project Engineering specifically LNG projects (Operation Readiness & Assurance) i.e. Detail design, HAZOP study, P & ID’s review, F & G (Fire and Gas), DCS (Distributive Control System) FAT’s (Factory Acceptance Test), ESD (Emergency shutdown system) review study, Alarm Management System (AMS), Plant 3D Model review and OTS (Operator Training Simulator), Construction and Pre-Commissioning (Static Commissioning to Dynamic Commissioning), Commissioning, Supervision and Coordination skills in liaising between Client (Operating Company OPCO) and EPCM (Engineering, Procurement, Construction & Management) Contractor during project phase.

Professional Experience

2007-10 - DCS Panel Officer / Shift Supervisor

present Qatar Gas Operating Company, Qatar

Ihave Vast Experience of Pre-commissioning, Commissioning, Startup/Shutdown and Troubleshooting of 04 LNG Mega Trains at QATAR GAS each with a capacity of 7.9 MTA (1500 MMSCFD). I have gigantic experience in understanding the PLC, IPS, HIPPS and anti surge control Systems.

Deep study of process control strategies including sequences, feed forward control, cascade Control, duty/standby, and supervisory control structures. Detailed understanding of Critical Function Testing & Electrical Control Management Systems (incl. Power Management Systems). All these actions are described in my daily duty but not limited to: -

Roles and Responsibilities:-

All my activities always based on Company Policies & Procedures to meet the

State and International Laws.

• Safely and efficiently, lead the Team for start-Up/Shutdown LNG trains at DCS (Emerson Delta-V) Panel having capacity of 1500 MMSCFD Sour Gas from

Offshore.

• Monitor all the parameters and take actions accordingly if any abnormality occurred during normal operation.

• Always maintain the daily production sheet and making sure to complete the

Personal Info

Date of birth

1974-10-14

Address

FlatNo-C19311, AL Khor community, AL Khor- Qatar

Phone

+974********

E-mail

add3j1@r.postjobfree.com

Social media

LinkedIn

https://www.linkedin.com/in/paresh-ajmeri-6470a7a/?trk=hp-identity-photos

Skills

LNG Train Commissioning and Start Up Operation

NGL Recovery Process (Ortloff Process)

Dehydration Process (UOP)

Helium Recovery Process (APCI)

AP-X Liquéfaction Process

Boiler Operation (Macchi)

DCS (Emerson) Operation

e-PTW Authorization

Fire Fighting

Hazardous Material Handling

Formal Risk Assessment

Petrochemical Plant Operation

LNG Process Operation Resume

daily target.

•Taking the emergency actions in case of sudden upset in the LNG train.

•Planning the Shutdown & start-up timeline to keep within the maintenance target window.

•Preparing the e-shift Report through ESMS database.

•Reporting incident and near miss through e-INR system.

•Trained the newly Joined LNG operation team members as per company policy and procedures.

•Working as Incident Commander in case of any type of incident. i.e (Fire, Hydrocarbon Leakage).

•Monitor the LNG train parameters on POIS and other Databases (Process Operation Integrated System).

•Authorizing the advance e-PTW as required.

•Handling SAP system and other maintenance request system.

•Initiating e-MOC (Engineering Management of Change) required to install/modify/Upgrade the existing Safety/Operation system for improving the Safety system, Plant reliability/Integrity and improving the LNG train performance.

•Maintaining the Shift Team Key Performance Indicators that is improving and maintaining the SHE indicators and Occupational Health.

•Review all the Standard Operating Procedure and modified it accordingly with Management committee.

Key Accountabilities

While working in this position i am accountable for the following responsibilities: -

•Commissioning & Start up Activities: - To manage all the LNG trains commissioning and start up activities by using all the valid procedures and policies through the proper communication with senior management and subordinates.

•Planning & Supervision of Shift Activities: Plan, prioritize, allocate and supervise the activities of subordinate staff in allocated area to ensure operational targets are meeting through the optimization of production processes and cost-effective operations.

•Budget Input: Assist in the preparation of departmental budget through providing inputs, ensuring that adequate provision has made for the funding of all planned activities in allocated area. Adopt a cost-conscious approach to utilization of approved budget resources.

•Procedures Development/Implementation: Participate in the development and post-approval implementation of production procedures and practices that facilitate the achievement of enhanced efficiency and effectiveness. Conduct continuous reviews to identify enhancement potential.

•Manpower Deployment: Participate in developing work force plans for the deployment of staff resources that best meet operational requirements and operational objectives. Continually monitor progress and priorities and make necessary adjustments to meet changing needs.

•Maintenance Planning/Co-ordination: Participate in day-to-day maintenance planning and co-ordinate all activities to ensure equipment is in optimum operating condition and that downtime is keep to a minimum level.

•Training & Development: Identify training gaps, recommend and implement training and development programs and evaluate individual performances in order to guide and counsel staff in realizing their potential.

•Incident Controller: Act as Incident Controller during emergencies in allocated area, with responsibility for deciding on first-line intervention action in advance of dedicated emergency service personnel.

Incident Handling and Reporting

Gas Turbine (GE) Operation

Budget Input

MPC Control Operation

Steam Generation System

Maintenance Planning & Co ordination

LNG Train Upset Handling

MS Office

Adobe Acrobate

SAP system Handling

e-Shift Reporting System

Languages

English

Hindi

Gujarati

LNG Process Operation Resume

•Health Safety Environment & Quality Compliance: Ensure the implementation and adherence to approved health, safety, environmental and quality procedures that protect Company staff and assets and meet their community responsibilities.

•Management Reporting: Prepare regular and ad-hoc line reports on issues setting out details of progress, Incidents, initiatives taken and recommending ways forward.

2006-07 - Production operation Lead

2007-09 Sohar Refinery Oman

Safely and efficiently start/Shutdown GAS train at DCS Panel (YokuGuwa) having capacity of 300 BPCFD Sour Gas.

Monitor all the parameters and take actions accordingly if any abnormality occurred during normal operation.

•Always maintain the daily production sheet and making sure to complete the daily target.

•Taking the emergency action in case of sudden upset in the LNG train.

•Working as On Scene Commander in case of any type of fire.

•Monitor the train parameters on POIS (Process Operation Integrated System).

•Authorizing the advance PTW as required.

•Reporting any kind of abnormality through SAP system.

Consists of following units: -

LPG GAS UN SAT / SAT PROPANE+BUATNE GAS SEPRATION,

C1+C2+C3+C4 GAS SEPRATIONCRUDE DISSTLLER –CDU unit : (cap 116 bpsd ) / Unsat. LPG Gas

Acid Gas Removal Unit: - Using aMDEA as an absorption solvent.

Dehydration and Mercury Removal Unit: - Using molecular sieve as an adsorbing agent.

Feed to this unit is unestablished naphtha from RFCC unit Refinery off gases separated

IntoC3/C4 rich C1/C2 in Gas sections. Unestablished naphtha including off gas compress and

separated in High Pressure Separator. Liquid Section of HP Separator operates Stripper,

Debutanizer Gas section of HP Separator operates primary absorber,

Sponge gas absorber, Sponge Gas Amine Absorber, Lean Gas KOD, Fuel Gas System

Fuel Gas Amine Treating > DIPA is used as a lean amine solution

Reliance Industries Ltd. (Refinery Division), Jamnagar) JAN 2005 to OCT 2007 as a DCS PANEL CR SUPERVIOSR / ENGINEER

Operation of DCS PANEL Control room Operation FOXBROX/ PLC/SCADA/ ADVANCE PROCESS CONTROL

Bentley/ Nevada, vibration monetizing system

Refinery DCS / PANEL OPERATION

DCS ALARAM MAGENTS

Plant / Process emergency

Steered operations of:

CDU (CRUDE DISTLLER) VDU (VACUEM DISTTLER) SAT /UN SATPLG TREATING

LPG GAS PLANT HANDNNLING OF, REFINERY OFFGASES LIKEDS, LPG MEROX UINT, FCC UINT, COCOKER UINT, COKER DRUM RECOVERY, AMINE SAGS TERTING UINTS, AROMATICS UINT AND OTHES UINITS.

LPG GAS and sat Naphtha unit

having H.P. Receiver, stripper, stabilizer, Absorber and Lean Gas KOD process off gases from diesel/platforming/vgo/light naphtha unit-fining unit and overhead liq from light naphtha

Unit-fining/diesel unit-fining units. Giving valuable products is L.P.G., SAT NAPHTHA routed to further process in union fining unit.

LPG plant saturation gas striping units capacity of distilling and recovery treating 21,000 MTA, Various refinancing units lpg, butanes, C1+C2+C3+C4+C5, off gases recovery and > distillations, its hydro carbon recovery and lpg gases separations, Lpg stripping and naphtha, H2S . Sulphur gas recovery and separations, LPG gas plant handling of, refinery

Feed to this unit is unestablished naphtha from crude unit, refinery off gases is separated into C3/C4 rich, C1/C2 For fuel gas, stabilized naphtha operations of primary absorber, sponge gas absorber, operations of stripper

Operations of High Pressure, Turbine Driven Centrifugal Pump

Operations of Six Stage High Flow Turbine Driven Centrifugal Compressor

Operations of Hydro treating Reactors

Removal of Sulfur and Nitrogen from Hydrocarbons by treating with amine (MDEA)

Stripping of LPG, Naphtha, Kerosene, Diesel, VGO by using their cut point

Operations of gas scrubbing section on LPG

CRUDE DISTLLER –CDU UNIT/ VACUEM DISTTLER VDU UNIT:

Heater (Fired Heater) operation, Preheat Train, Crude column operation, Vacuum column operation, Net gas compressor, Flare K.O.D, Steam Turbine pumps, Ejectors, Condensate system and all types of pumps, columns, vessels operation performs distillate crude (heavy / > light ) given products is C1-C5, LIGHT NAPHTHA, HEAVY NAPHTHA, JET FUEL, LIGHT GAS OIL, RCO, VGO

Asian Paints (I) PETRO. Ltd. As a sr. Supervisor (DCS–Panel shift plant operation) Jun’97-Jan’05

DCS Panel in Phthalic Anhydride Plant, Petro Chemical plant Licensed by Wacker AG, Germany. Manufacturing of Phthalic Anhydride – Capacity 24,000 TPA.

Handling of Control Room Operations based on Foxboro version - 6.3. Fully monitoring and controlling different operations like

Gas to liquid phase reaction, tubller reactor fixed catalyst base

Gas to liquid heat reaction gas cooling gas cooler

Gas phase to liquid phase switch considers logic, and operation

O-xylene gas phase fixed bed catalyst bed rector, phase gas absorbents m evaporation and partial oxidation reaction. distillation, vacuum distillation unit operation

handling of overall shift operation DCS and fields plant operation with 8 shift member crews and EHS departments

handling all plant process, instrumentation utility steam power generation plant steam turbine,

sop fire and safety Systems, EHS

handling of flaking and granulator operation

Administered a wide gamut of activities such as control room operations, maintenance,

. Monitor distillation control operations based on FoxPro ver- 6.3Well versed with O-XYLENE Storage Tank Farm (Capacity 4,800 KL) field operations

Nitrogen plant operations, fluid heater operation, cooling tower operations, cooling water pump system operations, D.M. water plant operations, Terminal oil and fluid oil

Operations, 1.2 M. W multistage steam turbine, blower operations and scribbler system, vacuum dissolution operation and flaking operations, petroleum class storage tank etc.

Previous Experience

Pesticides (I) Ltd., Panoli as Production Supervisor Oct’96 to May’97

Lupine Agro Chemicals (I) Ltd., Panoli as Plant operator Dec’95 to Sep’96

If unique Pharmaceutical Ltd,Ankaleshwar as Shift Chemist Jun’95 to Nov’95

Education

PGD in Environment Mgt and Eng. GTEB, Gujarat 2003

PGD In Safety Eng. GTEB, Gujarat 1998

B.Sc. – Chemistry from South Gujarat University 1995.

Msc in OIL GAS ENGG USA, WEVAC UNI JAN 2010

GARD IOSH HSE SAFETY NeBOSH UK London

Health Safety HSE / DCS –PANEL / Plant Operation Training

Quality Works System: - ISO 9002, ISO 14001

Various Type of Industrial Visits in different Industrial Areas and Well-known Companies

Effective teamwork.

World-class manufacturing.

Handling of H2S gas leakages trainings

How to safe H2S gas and hazardous gas operation

Delta V Emerson Process Management.

Medic First Aid by Total Safety.

MHI Turbo Machinery (Compressor and T).

Alderley Metering Skidurbine.

Safety Leadership Coaches By Qatar Gas.

Approved Gas Tester by Total Safety.

Fire and Safety Level 2 by Total Safety.

IT Credentials-

Windows XP/Vista/ Windows-7, Mac Operating- Apple, MS-Office 2007/2010,SAP,CDMS, TDMS,

Fusion, POIS, LIMS, ADOBDE Poff., HYSIS, P& ID, PID, PFD, ACROBAT profanation ALL TYPES

LNG Process Operation Resume



Contact this candidate