TRANSFERABLE ( WITH NOC )
POSITION APPLIED:
ELECTRICAL FOREMAN / SUPERVISOR
Ramon S. Legaspi, Jr
Street ** **. ** ******* **. Industrial area, Qatar Contact no. : +974********
e-mail address : *********************@*****.***
PERSONAL SUMMARY
A competent Electrical Foreman with a registered master electrician license and comprehensive knowledge Electrical Building Construction. Installation of electrical systems with their corresponding test and commissioning is my fortitude. With 14 years of experience in Electrical System installation processes with specific emphasis on quality work output, safety and on-time accomplishment. OBJECTIVES
Seeking an opportunity where I can apply a practical and analytical expertise in the Electrical system installation learned in many years of work, development trainings, IIEE affiliation seminars and in college. To be able to land in a company that promotes team effort and values individual suggestion in offering good solution to complex challenges.
ELLIGIBILITY AND SKILLS
Professional Regulations Commission Registered Master Electrician – License no. 0047451
IIEE Institute of integrated Electrical Engineers of the Philippines – Associate member
Completed the Competency based skills training in GENERAL ELECTRICITY ( Industrial and Building Wiring) UTPRAS – TESDA Reg. No. 050*******
40-Hours Training Rating Forming Part of a Manned or Periodically Unmanned Engine Watch Keeping on Sea going ship powered by Main propulsion machinery of 750KW propulsion Power.
Knowledgeable in Basic computer works ( MS word, Excel, Power point) and able to work with Auto cad.
With Valid Philippine driver’s license
WORK EXPERIENCE
Company: HCC Hassanesco Contracting Company WLL. – Qatar (overseas ) Inclusive dates: May 2, 2018 up to date..
Project: Ministry of Interior Project P220 – Administration Bldg., Main Security Post Bldg. And Substations
Position: Electrical Supervisor / Foreman
Job description:
Reading coordination drawing, schematic drawing, single-line diagram as per the approved shop drawings and IFC drawings.
Execution of as-built drawings as required in the actual site condition without compromising relevant standards.
Arrangement of manpower resources as per the site condition and project requirement.
Guiding and providing training to workers for better outcome and safe work.
Preparation of Bulk MTO (Material Take Off) from approve lay out that correspond to actual site requirement relative to approve material submittal and forward to site engineer to be send to procurement dept.
Issuing the materials as per site requirements.
Supervision and ensuring that the installation is as per approved drawing, specification, method statement and relevant code.
Prepare sketch drawing and asking to submit request for information (RFI) to consultant for any changes in the drawing prior to start the execution.
Requesting to raise RFI at every stage following the approved inspection test plan (ITP).
Make day to day planning and execution monitoring the progress at site
Attend site progress meeting and report to engineer or project manager.
Attend regular meeting with supplier for site clarification or RFI.
Conduct test and commissioning.
Prepare daily activity report for manpower distribution and daily material requisition. Various electrical system installation involve in the project. 1) Suppression system such as FM 200 and Foam system installation. 2) Fire alarm detection and alarm system installation 3) Access Control System installation
4) ICT system installation
5) SmartTV system installation
6) Lighting and power system installation.
7) VRF system installation
8) Micc Cabling and installation
9) Containment system installation
And more..
Company: Anvic Construction Philippines Inc. – Pasig City, Philippines (local) Inclusive dates: October to December 2017
Project: Coast Residence High-rise Condominium Project Position: Electrical Foreman
Job description:
In charge on the execution and completion of Power Service Entrance Encasement.
In charge on the execution and completion of Auxiliary Service Entrance.
Responsible in the installation, Roughing-ins and Cabling Substation equipment ( Metering vault, High-voltage Switchgear, LV switchgear, Transformer, Capacitor bank, Synchronizer and Gen set )
Responsible in the installation, Roughing-ins and Cabling of 3phase 440V motors Motor controller system and inductive loads (easy pumps, Chiller, Fire pumps, STP pumps, potable and non-potable pumps)
Responsible in the implementation roughing-ins and Cabling of Feeder system ( Cable or Bus way from EMB to EE rooms ) Roughing-ins and Cabling Air handling unit and VFD
Responsible in Panel board installation, Cabling and Termination ( Sub main distribution board, distribution board, ATS panel, plug in and other circuit breakers, FACP and VFD.
Responsible in the installation of Auxiliary System Feeder ( Telephone system, CCTV, Intercom System and Fire alarm System including Service Entrance.
In charge in the execution and monitoring in Electrical Testing and commissioning.
Responsible in Feeder system manpower management. Company: Venray Construction Corporation – Cebu City Philippines (local) Inclusive dates: October 5, 2016 – April 9, 2017
Project: City Mall Danao Project
Position: Electrical Foreman
Job description:
Over all in-charge of all electrical installation activities and implementation.
Preparing as built design for site implementation and preparing RFA Shop drawing using Autocad.
Responsible in the installation, roughing ins and Cabling of Grounding system ( Grounding main bus, equipment grounding and Lightning arrester)
In charge in conducting testing and commissioning of equipments ( Ground earth testing, megger testing, voltage and current reading, Circuit-live testing and voltage drop calculation on as-built plans)
Design and estimation (Electrical design as per code provision and minimizing material loss )
Responsible in installation and cabling of Low current auxiliary system addressable FA system (signaling line and notification app. circuit Roughing ins and cabling of PA system ( Public address system ) Wired intercom system Keycards and sensor actuated automatic switches Close circuit television ( CCTV ).
Conducting electrical material requisition and estimates.
Manpower handling ( Giving scope instruction, conducting toolbox meeting and site monitoring Inspection )
Making monthly accomplishment reports for billing purposes, etc.
Other electrical scopes and its corresponding trouble-shooting. Company: J Espiritu Electrical Services Philippines – Quezon City, Philippines (local) Inclusive dates: June 5, 2014- April 20, 2016
Project: SM Seaside City Mall- South Road Properties Cebu City Position: Electrical Foreman
Job description:
Responsible of all Electrical works under Feeder system.
Implementing as-built drawing on as per site condition.
Giving instructions as far as Feeder system scope is concern.
Conducting inspections of scopes done in feeder system.
Responsible in as-built design, making shop drawing and requesting for approval.
Making daily activities/manpower scope of activities.
Making sure that all electrical work be done under the provision of the code.
On-hand supervision on all roughing ins work concerning feeder system.
On-hand supervision on all feeder system cabling activities.
On-hand supervision on all equipment installation in Substation to EE room.
On-hand supervision on the testing and commissioning stage Company: UNISTAR Contracting Company Limited – Riyadh, KSA (overseas ) Inclusive dates: March 22, 2012 – May 21, 2014
Project: KAFD King Abdullah Financial District. Parcel 109 Motaqwas Tower Highrise bldg. Position: Electrical Foreman
Job description:
Studying production schedules and estimates worker hour requirements for completion of job assignments.
Interpreting specifications, design drawing, and job orders to workers, and assigns duties.
Establishing or adjust work procedures to meet production schedules.
Recommending measures to improve production methods, equipment performance, and quality work.
Responsible in the installation, Roughing-ins and Cabling Substation equipment ( Metering vault, High-voltage Switchgear, LV switchgear, Transformer, Capacitor bank, Synchronizer and Genset )
Responsible in the installation, Roughing-ins and Cabling of 3phase 440V motors and Motor controller system (easy pumps, Chiller, Fire pumps, STP pumps, potable and non-potable pumps
Responsible in the roughing-ins and Cabling of Feeder system ( Cable or Bus way from EMB to EE rooms )
Responsible in the roughing-ins and Cabling Air handling unit and VFD
Panel installation, Cabling and Termination( Sub main distribution board, distribution board,ATS panel, plug in and other circuit breakers, FACP and Direct Digital Controller(DDC).
Support in the execution and installation on BMS for Power and DALI System.
Suggesting changes in working conditions and use of equipment to increase efficiency. Analyze and resolve work problems, or assist workers in solving work problems.
Estimating, requisition, and inspect materials.
Conducting talks on toolbox meeting for safety purposes.
Having a Regular meetings with the consultant for IR’s.
Raising IR’s for work accomplished and executing comments.
Accomplishing request for site materials etc..
Checking for worker’s daily attendance and work tardiness Company: Ayin Contractor and Trading Corporation - Quezon City, Philippines (local) Inclusive dates: June 10, 2011 - January 8, 2012
Project: J CENTRE MALL – Mandaue City, Philippines Position: LV Terminator – Commissioning Foreman
Job description:
* Testing and Commissioning of Electrical Cables and Equipment.
* Glanding and Panel Board cable termination.
* Installation of Lightning arrester.
* Conducting Ground Resistance Test for Equipment grounding main bus.
* Cable Ladder and Cable Tray Installation.
* Conducting Megger Insulation test.
* Assisting High Potential Test for Power cables.
* Electrical Equipment mounting and installation and trouble shooting. Company: RNS power System – Kagudoy Rd. Basak, Lapu-Lapu City Philippines (local) Inclusive dates: October 2010 – May 11, 2011
Project: I.T. tower BPO Aegis People Support Project - High rise Project Position: Electrical Leadman
Job description:
* Lighting system wiring and Lighting fixture installation.
* Power system wiring for Inductive Loads.
* Gutter and Cable wire way installation.
* Pipe installation for Main electrical raceways.
* LP and PP panel board installation.
* Grounding system Cadwelding works.
* Free standing MDB Panel Mounting.
* Lighting and Power Panel cable termination.
* Cable Pulling for feeder system.
Company: Arabian Petrochemical Company- Jubail, KSA (overseas) Inclusive dates: May 15, 2010 – September 20, 2010 Project: Butene-! Plant Petrochemical Complex Al Jubail Industrial City Position Electrical Foreman
Job description:
Supervision and ensuring that the installation is as per approved drawing, specification, method statement and relevant code.
Suggesting changes in working conditions and use of equipment to increase efficiency. Analyze and resolve work problems, or assist workers in solving work problems.
Supervision and provide technical assistance to installation procedure.
Conducting testing and commissioning to electrical equipment.
Supervision and giving installation techniques in the installation electrical system, and equipment
Participate to implement and maintain an effective project HSE programs at site. Company: Dulb Trading and Contracting Company Ltd. – Riyadh, KSA (overseas) Inclusive dates: March 14, 2008 – April 14, 2010
Project: Ministry of Health (800-beds Malik Faisal Hospital) Al Taif KSA Position: Electrical Charge-hand
Job description:
Planning new or modified installations to minimize waste of materials, provide access for future maintenance, and avoid unsightly, hazardous, and unreliable wiring, consistent with specifications and local electrical codes.
Planning wiring and installation of equipment and fixtures such as motors, generators, as well as control and distribution apparatus such as switches, relays, and circuit-breaker panels.
Preparing sketches showing location of wiring and equipment, or follow diagrams or blueprints, ensuring that concealed wiring is installed before completion of future walls, ceilings, and flooring.
Giving instruction on how to measure, cut, bend, thread, assemble, and install electrical conduit. Pull wiring through conduit. Splice wires by stripping insulation from terminal leads, twisting or soldering wires together, and applying tape or terminal caps. Connect wiring to lighting fixtures and power equipment.
Connecting power cables to equipment, such as electric range or motor. Install grounding leads.
Termination of cables, and making sure that circuiting is properly done.
Doing electrical cable trays, trunking and raceway for different electrical system
Coordinating with foreman and engineers on electrical technical work specification.
Reporting all works and making sure that works be done on time.
Conducting site evaluation and inspection, reporting to direct superiors. Company: RNS power System – Kagudoy Rd. Basak, Lapu-Lapu City Philippines (local) Inclusive dates: October 2007 – February 2008
Project: Crown Regency Hotel- 5star High rise Project Position: Electrician
Job description:
* Lighting system wiring and Lighting fixture installation.
* Power system wiring for Inductive Loads.
* Gutter and Cable wire way installation.
* Pipe installation for Main electrical raceways.
* LP and PP panel board installation.
* Grounding system Cadwelding works.
* Free standing MDB Panel Mounting.
* Lighting and Power Panel cable termination.
* Cable Pulling for feeder system.
Company: Globalflex – Mandaue City Branch (local)
Inclusive dates: January 20, 2006 – February 10, 2007 Position: Maintenance Electrician
Job description:
Electrical Building wiring installation.
Electrical Motor and motor control installation and trouble shooting.
Roughing ins using emt, imc and rsc conduits.
Panel board installation and cable termination works.
Termination and commissioning works.
Maintenance of power tools.
Motor and motor controller installation and trouble shooting.
Electrical rewiring and circuit trouble shooting. Company: Office of the Barangay, Poblacion Impasug-ong Bukidnon (local) Inclusive dates: June 1997 – March 1999
Position: On-Call Barangay electrician
Job description:
Conducting all electrical installation and maintenance of barangay properties including temporary electrical connection needed during official activities.
Conducting house wiring installation and trouble shooting. EDUCATIONAL BACKGROUND
Cebu Reliable and Excellent Seafarers Training Center (CREST )
60Hours Basic Training in Personal survival techniques, Fire prevention and Fire fighting Elementary first aide and Personal safety and social responsibility
Ratings forming part of a watch in a manned engine-room or designated to perform duties in a periodically unmanned engine-room. Serving on seagoing ships powered by main propulsion machinery of 750KW propulsion or more.
Crowd crisis management for personnel serving onboard domestic roro/ passenger and cargo ships.
Diploma
Technical – Vocational Graduate in General Electricity ( Industrial and Building Wiring ) Department of Manpower, Development and Placement – Tesda accredited Technical school 2007
College Education
Central Mindanao University ( 1999 – 2002 )
Bachelor of Science in Environmental Science
Liceo de Cagayan University (1996 – 1998 )
Bachelor of Science in Civil Engineering – Undergrad Secondary Education
Pusok National high School ( 1992 – 1996 )
TRAININGS AND SEMINARS
Basic Electricity ( Building Wiring ) June 1996
Mindanao Arts and Technological Institute Short course Malaybalay, Bukidnon
Employment Readiness Seminar August 2007
Department of Manpower, Dev’t and Placement
DMDP Ramos, Cebu City
Basic Safety Course October 2013
Unistar Contracting Company Ltd. ( SBG- PBAD )
Dal Al Riyadh Safety Consultancy
Electrical System Design for Industrial and High rise Bldg. July 2015
( JEES ) J. Espiritu Electrical Services / ABCEDE Consultancy
Actual Power Plant Commissioning Familiarization September 2007 Kawasan Falls Hydroelectric Power Plant I
DMDP Field trip to Badian, Cebu
NC II ( Industrial and Building Wiring ) On-schedule Competency assessment Tesda Region VII
BT- Solas Basic Training May 2016
Crest Training Center – Escario, Cebu City
Crowd Crisis Management Training
OTHER SKILLS BACKGROUND
Welding
Fabricator/Fabrication of Supports and Fittings
Refrigeration and air-conditioning
Knowledge in Autocad
Excellent in MS word and excel.
Knowledge in Mechanical Ducting installation
Knowledge in ratings forming Engine watch keeping for ships
Knowledge in Basic life support and Crowd management
Background in plumbing works.
Driving skills
Background in gypsum board installation( wall and ceiling )
Background in elevation surveying
PERSONAL DATA
Date of birth: April 29,1979 Age: 41
Marital status: Married Height: 163 cm
Language spoken: English, Arabic, Tagalog, Bisaya Weight; 78 kgs. Religion: Christian
CHARACTER REFERENCES
Engr. HipolitoIndig REE Engr. Ruben Lanutan PEE
Quality Control Engineer Manager- PROPRIETOR
J. ESPIRITU ELECTRICAL SERVICES DANFILL Electrical Contractor Contact# 092********
Marlou Davis Engr. Donald Abarques REE
Senior Supervisor FreeLance Contracting Engineer
J. ESPIRITU ELECTRICAL SERVICES Contact# 092******** Contact# 093********
Engr. Ahmed Afara Engr. Rodelio Canon
Senior Elect. Engr, Site Engineer
HCC – Qatar HCC- Qatar
Contact# +974******** Contact# +974********
Engr. Afzal
Consultant P220 Project Qatar
CEG Consultancy
Contact # +974********
QUALITY TRAITS
I am a hardworking person, Passionate on the field of my expertise and can work long hours. I am good team member and can work with less supervision. I am willing to share my knowledge and capabilities in electrical installation and maintenance. And bring all these abilities to a much greater heights in building and industrial electricity.
Passport # P5056096A Issued on : NOV.17,2017 Issued at: DFA MANILA SIRB # Issued on: MAY 16, 2016 Issued at: Marina, Cebu Ramon S. Legaspi, Jr