DARIO C. APAO

Blk * Lot **, Everest Drive

Veraville Fremont, Las Piñas City

Cell # = +639********* / email address: add34s@r.postjobfree.com

Personal Data:

Profession : Civil Engineer (PRC no. 021955 dated December 21, 1979)

Other Qualification : Materials Engineer (DPWH Accreditation no. 3037 )

Nationality : Filipino

Date of Birth : October 17, 1958

Spouse : Luisita Yu Hiu Tian

Provincial Address : Carrascal, Surigao del Sur

Education:

Graduated Bachelor of Science in Civil Engineering (BSCE), Misamis University,

Ozamiz City [ March, 1979 ]

Advance Studies : Master in Business Administration (MBA) – University of Mindanao, Davao City. [ Oct. 1983 ]

SEMINARS AND TRAINING ;

1.Quality Management System (QMS ) Saudi-ARAMCO, Saudi Arabia 2012

2.Quality Control and Material Testing -- ( Arabian Consulting

Engineers, Saudi Arabia ) --- 1990

3.Construction Management (NIA- Philippines ) ---1983

4.Programming and Scheduling, PERT/CPM ( NIA- Philippines) 1983

5.Contract Management ( NIA- Philippines ) – 1982

6.Advance Micros oft Office

7.Construction Occupational Safety and Health ( COSH ) 2016

POLITICAL AFFILIATION :

SANGUNIANG BAYAN ( SB) MEMBER, LOCAL GOVERNMENT,

CARRASCAL, SURIGAO DEL SUR, JULY, 1998 TO JUNE, 2007

( 9 CONSECUTIVE YEARS )

Years of Work Experienced :

1.Project Quality Management and Supervision ( Saudi Arabia) -14 yrs

2.Project Management and Supervision ( Philippines ) – 26 yrs

SUMMARY OF PROJECTS UNDERTAKEN ( LOCAL AND ABROAD )

Company/Address : EC DE LUNA CONSTRUCTION CORPORATION

281 Connecticut Street, Greenhills,

San Juan, Metro Manila

( June 20, 2015 to June 30, 2020 )

Position : PROJECT MANAGER

( Roads, Highways, Bridges and Viaducts )

Project : MAHARLIKA HIGHWAY

PBM 2, SECTION- 1

Sta. Rita, Bulacan To Cabanatuan,Nueva Ecija

Provinces of Bulacan and Nueva Ecija

Road Upgrading and Preservation Projects ( L= 75 Km. )

JICA FUNDED PROJECT

Project : MAHARLIKA HIGHWAY

PBM2, SECTION 2

Cabanatuan City TO Nueva Ecija/Nueva Vizcaya Bdry

Province of Nueva Ecija

Road Upgrading and Preservation Projects ( L = 95 Km )

JICA FUNDED PROJECT

Consultant : Renardet SV and Associates International

Project Cost : 3.5 Billion Pesos

Project Duration : 60 Months ( Completed )

Owner : DPWH – UPMO CLUSTER 1

Project : MINDORO WEST COAST ( MWC )

Sta. Cruz To Mamburao Section

Package 5

Road Upgrading and Preservation Project

( L = 24 Km, 2 RCDG Bridges )

JICA LOAN PROJECT

Consultant : Renardet SV and Associates International

Duration : 28 Months ( Completed )

Project Cost : 470 Million Pesos

Location : Province of Occidental Mindoro

Owner : DPWH—UPMO CLUSTER 1

SCOPE OF WORKS ; Manage Project Implementation in compliance to Project

Plans and Specifications, Quality Assurance and Quality Control in accordance to ISO Standards and Specifications, Project Schedule, Budget Constrained according to Resources, Traffic Management, Safety and Health Management.

PROJECT COMPONENT, RE ;

ROADS, EXPRESSWAY, BRIDGES, VIADUCTS, IRRIGATION, SEAPORTS, WATER SUPPLY AND SEWERAGE SYSTEM ;

A) Embankment formation, S ubgrade and Aggregate Sub Base Preparations,

B)Concreting of Pavements and Asphalt Concrete Overlays

C)Improvement of Existing Concrete Pavement Base thru Break and Seat Methodology,

D) Introduction of Concrete Treated Base Course on Base Materials with CBR value less than Specifications,

E)Grouted Riprap, Stone masonry Walls and Retaining Walls and Slope Protection

F)Bridge Foundation and Bored Piles, Super Structure Deck Slab and Girders

G)Quarry Source, Crusher and Asphalt Plant Operations and Management,

H)Coordinate with the Consultant and Client for the Project Implementation

I)Traffic and Safety Management

J)Familiar with ISO Standards ( ASTM, AASHTO, ACI,BS Standards )

Company/Address : UNISIS ENGINEERING

Al Khobar, Kingdom of Saudi Arabia

( January 28, 2011 to June 15, 2015 )

Position : DEPUTY PROJECT MANAGER

(Roads, Bridges and Infra-Structure, Oil & Gas, Power Plant )

Project : WASIT GAS PROJECT PROGRAM

PACKAGE NO. 1

Jubail Industrial City 2

Consultant : Saudi Arabia Consulting Engineers

Duration : 12 Months

Location : Jubail, Saudi Arabia

Owner : Saudi Arabian- American Company (ARAMCO )

Project : YANBU ARAMCO SYNOPEC REFINERY PROJECT

(YASREF, EPC – 3 ), Yanbu Industrial City

Duration : 18 Months

Location : Yanbu, Saudi Arabia

Owner : Saudi Arabian- American Company ( ARAMCO )

Project : RABIGH POWER PLANT 2

Consultant : Parson Brinckerhoff Consulting Engineers

Duration : 25 Months

Location : Rabigh, Saudi Arabia

Owner : Saudi Arabia Electric Company ( SECO )

SCOPE OF WORKS :

PROJECT MANAGEMENT AND QUALITY CONTROL, RE :

1. Construction of Foundations of Main Pipe Rack ( Oil & Gas)

2.Construction of Foundations of Equipments and Boilers ( Oil & Gas )

3.Construction of Sub-Stations, Foundations and Erection of Overhead

Transmission Lines (OTL )

4.Layout and Installation of Underground Pipes Lines for Oil Refinery Plants, Water Supply Pipe Lines and Drainage/Sewerage System Under-ground

Pipe Lines

5.Construction of Roads and Bridges, ( Concrete Pavement and

Asphalt Paved Roads and Bridge Foundations )

6.Construction of Water Supply and Storm Sewer System

7.Construction of Irrigation System for Large Agricultural Projects

8.Batch Plants Production Management ( Concrete and Asphalt

Batch Plant )

9.Grouting of Equipment Foundations and Pedestals

10.Coating and water proofing Concrete Foundations and Steel Structural

Members

11. PRE—CAST Fabrication and Erection of Concrete Structural Members

12.Documents Preparation and Review for Project Implementation

13. Familiar with SAUDI ARAMCO CODES AND STANDARDS

14. Familiar with ISO, ACI, ASTM, AASTHO AND BS STDS.

Company/ Address : STEIDLEY SAUDI ARABIA COMPANY, Ltd.

(January 8, 2010 to January 8, 2011 ) Ready Mix Concrete, Al Khobar, Kingdom of Saudi Arabia

POSITION : PRODUCTION AND QUALITY CONTROL MANAGER

PROJECT : KING FHAD INTERNATIONAL AIRPORT ROAD

CONSULTANT : SAUDI CONSULTING ENGINEERS

CLIENT : MINISTRY OF COMMUNICATION

KINGDOM OF SAUDI ARABIA

Company/ Address : AL OWAIDAH CONTRACTING COMPANY

RIYADH, SAUDI ARABIA

( July 18, 1985 TO July 30, 1993 )

Projec t : RIYADH -- TAIF EXPRESSWAY LCW ( 950 Km )

Consultant : Arabian Engineering Bureau ( AEB )

Position : MATERIALS ENGINEER

Roads & Bridges, INFRA-Structures and Utilities

Client : MINISTRY OF TRANSPORTATION

Riyadh, Saudi Arabia

Company/Address : CARRASCAL INTEGRATED ENTERPRISE

Sto. Nino, Cebu City

( January, 2003 to December, 2009 )

Position : CONSTRUCTION MANAGER

( Roads, Bridges and Infra-Structure )

Owner : DPWH, Region XIII, Butuan City

Projects ; SURIGAO -- DAVAO COASTAL HIGHWAY PROJECT

: Construction of Steel Module Bridges(Austrian Gov’t Assisted Project)

: Construction of RCDG Bridges (Japan International Cooperation Agency Assisted Project)

: Concreting of Roads, constn of box culverts, slope protection, grouted rip Rap and stone masonry, Installation of Gabions, Casting and driving concrete piles for bridge Foundation., retaining walls and Irish Crossing.

: Construction of Viaducts

: Earthmoving and Embankment Construction

Company/ Address D.T. A. BUILDERS, Carrascal, Surigao del Sur

( October, 1993 to December, 2002 )

Position : PROJECT MANAGER

( Roads and Infra—Structure )

Owner : National Irrigation Administration Region XIII, Butuan City

( World Bank Assisted Project )

Project : Construction of Irrigation Project ( dam, concrete irrigation canal, sluiceway, box culverts, earth moving activities, casting and installation of RCPC 18”O, 24”O, 36”O.

Owner : Local Government Unit of Cantilan and Carmen, Surigao del Sur

Project : Construction of Water Supply and Sewerage System [construction of

: elevated reservoir, installation of water supply pipes)

Owner : Department of Education, Province of Surigao del Sur

Project : Construction of concrete school buildings ( medium )

Sports and Recreation Complex Bldg,

Owner : Local government Unit of Carrascal, Surigao del Sur

Project : Seawall and Flood Control,wharves, ports and harbor.

Construction of RCDG Bridges, concreting of roads and pavement, Commercial buildings, farm to market roads.

.

Company/ Address : AL OWAIDAH CONTRACTING CO., Riyadh, K.S.A. [ July, 1985 – July, 1993 ]

Position : MATERIALS ENGINEER( Soil, concrete, asphalt, aggregates )

Owner : MINISTRY OF COMMUNICATION

Kingdom of Saudi Arabia

Projects : Construction of Bridges and Inter-Changes and Overpasses,

: Construction of Roads ( Expressway with Bituminous Pavement) (Preparation of concrete and asphalt mix design, control of Bituminous mixproduction in the asphalt plant and concrete Mix in the batching plant, check bituminous mix in conformance To established job mix formula, check quality test of aggregates, Preparation of monthly materials report. Familiar with ACI, ASTM And AASHTO standards.

Company/Address : National Irrigation Administration ( Jan. 1980 – April, 1985 ) Region XI, Davao City

Position : PROJECT ENGINEER ( Civil and Infra-Structure )

Project : Construction of Irrigation Project ( Potential irrigable area= 3000 Has.)

( Construction of Diversion Dam, In-take Tunnel, Thresher crossing and Box culverts, concrete canal linning and access roads )

Source of Funds : World Bank

Scope of Work :

: Construction of RCDG Bridges and Overflow Bridge,

: Construction of Overhead Flumes and Siphon

: Construction of Trapezoidal Open Channel and Appurtenant Structures for waterways

: Installation of RCPC for Irrigation Channels

: Construction of Access and Farm to Market Roads

WORK ACTIVITIES

A) As Project Manager :

+ Project management and supervision in the project implementation in accordance

To plans and specification, Time Schedule and Budget Requirements, Quality Control, Traffic Safety and Health

+ Organized and estimates manpower, equipments and materials for the project.

Familiar with ghant chart, CPM and S- curve control system.

+ Monitor all project activities in accordance to plans and specification considering

The cost and duration of the project.

+ Preparation of documents for bidding and monthly accomplishment for billing

Purposes.

+ Coordinate with local government ordinances affecting the project implemention.

B) As Project Engineer :

+ Supervision in casting concrete piles and concrete pile driving activities for

Bridge foundation.

+ Supervision in the construction and erection of steel modular bridges. ( WAAGNER-BIRU Austrian Govt. Assisted Project )

+ Supervision in the construction of Re-enforced Concrete Deck Girder bridge.

+ Supervision in earthmoving and embankment construction for DPWH Road projects.

+ Supervision in the construction of Irrigation dams and irrigation facilities.

+ Supervision in the installation of water supply line and sewerage system

( RCPC, PVC and GI pipes )

+ Supervision in the construction of Highrise Concrete Office Building.

+ Familiar with ACI, ASTM, AASHTO and BS standards.

C) As Materials Engineer ( Soils, concrete, asphalt .aggregates ) Knowledgeable in ACI, ASTM, AASHTO and BS Standards.

+ Conversant to all laboratory testing relative to concrete and bituminous

Materials for roads, bridges and buildings.

+ Conversant to all quality test required for coarse and fine aggregates for

Concrete and bituminous mixes.

+ Conversant to all quality test required for earthworks for embankment

Sub-base courses.

+ Conversant in Concrete mix and Asphalt mix design for all types.

+ Control of concrete mix production at the batching plant.

+ Control of bituminous production at the Asphalt Plant.

+ Control of aggregate production at the crusher plant.

+ Preparation of monthly materials reports.

D) As Production Engineer in the Asphalt Plant :

+ Check hot bin gradation of aggregates and blend aggregates to satisfy specification and job mix formula.

+ Check aggregate feeder at cold bin to satisfy the job mix gradation at bituminous mix and other physical property of the mix.

+ Take sample of bituminous mix at asphalt plant and prepare laboratory test for Marshall mould to check the physical properties of the mix in compliance to specification.

+ Check the mixing temperature and the mixing time at the pug mill.

+ Check regularly the calibration of the aggregate scale

+ Estimates the quantity of materials to be used in the daily production of

Bituminous mix.

+ Prepare schedule of transportation for hauling the required volume of materials

Needed in the production.

+ Check regularly all materials delivered at the asphalt plant.

+ Prepare suitable transportation of bituminous mix to the jobsite considering the

Temperature of mix upon arrival at jobsite.

+ Prepare daily production reports.

Duties and Responsibilities as Batching Plant Production Manager:

a) Prepare concrete mix design requested by clients in accordance to ACI and

ASTM standards.

b) Estimate daily requirements and supply of materials for concrete production.

Recoarse, medium and fine aggregates including the type of admixture and cement to be used.

c) Prepare transportation schedule to accommodate the Hauling of materials required for production.

d) Check the quality of the concrete mix before delivery to the jobsite.

e) Check the quality of aggregates every time supply arrives from crusher or source.

f) Conduct quality test of concrete mix in accordance to ACI and ASTM

standards.

g) Prepare quality test reports of concrete mix and aggregates regularly/ monthly. h) Prepare cost estimates of production.

# DUTIES AND RESPONSIBILITIES AS DEPUTY PROJECT MANAGER

CONDUCT INSPECTION AND SURVEILANCE OF ALL CIVIL WORKS IN-PROGRESS

COMPLIANCE TO SAUDI ARAMCO STANDARDS, PLANS AND SPECIFICATIONS.

ASSIST PROJECT MANAGER IN FULL BLAST IMPLEMENTATION UNTIL COMPLETION OF THE PROJECT.

ISSUE MEMORANDUM AND GUIDELINES FOR FULL CONTROL AND IMPLEMENTATION OF PROJECT ACTIVITIES IN ACCORDANCE TO QUALITY CONTROL STANDARDS AND PROCEDURES.

MONITOR AND EVALUATE PROJECT ACCOMPLISHMENT RELATIVE TO PROJECT COST.

INITIATE CRUSH PROGRAM OF PROJECT ACTIVITIES TO ACHIEVE THE DURATION FRAMEWORK OF THE PROJECT. .

INSURE SAFETY STANDARDS AT ALL TIMES UNTIL COMPLETION OF THE PROJECT.

MONITOR PROCUREMENT AND DELIVERY OF MATERIALS AT ALL TIMES IN COM-

PLIANCE TO PROJECT STANDARDS AND SPECIFICATIONS.

MONITOR AND CHECKED ASPHALT AND CONCRETE BATCH PLANTS OPERATIONS IN PROGRESS COMPLIANCE TO SAUDI ARAMCO STANDARDS.

Prepared by: Dario C. Apao