Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Fereej Ibn Dirhem, Qatar
Salary:
12000-14000
Posted:
June 24, 2020

Contact this candidate

Resume:

Contact Information:

NAZAR ABDUL KADER JAILANI

Contact no: +974-********

Email: add1zd@r.postjobfree.com

Valid Driving license

Transferable visa & NOC

Career Objective:

Highly focused individual with strong desire to work with an organization, which offers an Interesting and challenging position with a team environment, where I can expand my Professional prospect by making best use of my qualification and experience.

Personal Information

Date of Birth

12-02-1986.

Place of Birth

Madurai, Tamilnadu

Gender

Male.

Marital Status

Single

Nationality

Indian.

Education

Institute:

Anna University, Chennai.

Country:

Chennai, Tamilnadu.

Degree:

Bachelor – Electrical and Electronics Engineering.

Year of Graduating:

2009.

Technical courses

CSWIP LEVEL-2

NDT LEVEL-2 ( RT,UT,PT,MPI)

Skills

Computer Skills

Level

Ms word

Good

Ms excel

Good

Auto cadd

Good

OR cadd

Good

PC-schematic

Good

Primavera

Good

Revit

Navis works.

Languages

Speaking

Reading

Writing

Tamil ( Mother tongue )

Good

Good

Good

English

Good

Good

Good

Telugu

Good

Fair

Fair

Malayalam

Fair

Fair

Fair

Hindi

Fair

Fair

Fair

Career Summary

With 10+years of extensive experience in the Project Management & Construction.

Possesses good understanding of quality requirements and ability to adhere to the requirements in the execution of works.

Expertise in swiftly ramping up projects with competent cross-functional skills.

Coordinating with Consultants and ensuring the sub-contractor and project team members that the project is constructing in accordance with the Project specifications and standards.

Exemplary relationship with management and strong communication skills to coordinate with project members, consultants and contractors with consummate ease.

Well proficient with present methodologies and systems in compliance with the quality standards.

Work Experience-1

Period:

Company:

Location

Sep 2018-Oct 2019

ALYSJ-JV (Gold Line)

Qatar

Position: Civil defense Completion engineer.

Project: Gold Line Underground Stations. (Aziziyah, Sports city, Al-waab, Al-sudan, Johaan, AL-saad, National museum of Qatar, Souq wafi, Bin Muhammed, Ras bu aboud) Switch Box(Sudan, Bin Muhammed, Sports city) Centralized cooling plant, Stabling yard and Emergency Exit)

Roles And Responsibility:

Lead the Fire life safety teams in STATION and conducting Dry run (trail run) prior to the Civil Defense Inspection.

Monitor and reporting the MEP services and civil works which are not comply with NFPA standards.

Preparing the check list and follow the ongoing MEP activity of 10 metro station& switch box in gold line metro ststions.

Support the Testing and commissioning of MDB, MCCB Panels, ACMV, Mechanical and Electrical services.

Monitor the Testing and commissioning team for all dry and wet utility services

Inspecting the status of Electrical, Mechanical &ACMV systems readiness according to the NFPA standards.

Testing the interface of Fire Life safety systems & ACMV with BACS.

Support and monitor the Installation of fire alarm panel and backbone networks.

Testing of Fire alarm panel interface with corresponding devices and equipment’s and it is functions according to the C&E Matrix.

Ensuring the integrity of the station buildings as per NFPA standards.

Implementing the scenario test with corresponding team to ensure all equipment’s are interfaced and performing as per QCDD Approved cause and effect Matrix.

Coordinating with BACS team to resolve the service related feedback issues in BACS systems.

Installation inspection of tunnel emergency lighting systems and fire life safety systems in cross passage, emergency exit, tunnel and switch box of metro stations.

Preparing the weekly report to identify the site installations which is lagging from the project schedule.

Ensuring the FM200 rooms are maintaining the integrity and it is functionality as per NFPA.

Periodical inspection on every stations and ensuring the Station readiness for Civil defense inspection.

Organizing the station teams and prepare the necessary documents and materials for The QCDD Inspection.

Supporting the progress meeting and update MOM and report accordingly.

Support T&C and resolving the issue with Consultant and comply the queries.

Interacting with civil defense inspectors and explaining the functions with specialization support.

Complying the QCDD comments and providing the necessary document for QCDD re inspection by supporting the consultant.

Work Experience-2

Period:

Company:

Location

March 2015 – Sep 2018

Yuksel Construction Co. INC

FYAP- Yuksel JV.

Doha, Qatar.

Position: M.E.P- Engineer-Red Line south elevated-At Grade (Al-Wakra station);

Project : Red Line south elevated-At Grade (Al-Wakra station);

Roles And Responsibility:

VIADUCT: Redline South Elevated At Grade (Al-wakra station to Economic zone station)

Heading the installation of M.E.P services in RED LINE SOUTH ELEVATED AT-GRADE viaduct over 6.8 km(Plumbing, LV, Earthing and bonding)

Responsible for the installation of Electrical and mechanical services in piling, pier column and pier cap and viaduct segments in site and precast.

STATION: Al-Wakra South Elevated Metro Station.

Lead the MEP systems in Al-Wakra Station (Redline South elevated station)

Interface coordinator between ELV signaling Contractor and other respective subcontractors.

Interface coordinator between Fit-out contractor and MEP terminations.

Responsible for Three major Sub Contractors in Al-Wakra station and their corresponding activities.

L&T - Building Automation Control System

KONE -Vertical Horizontal Transport System

ANEL MEP - Mechanical Electrical Plumbing

Responsible and coordinator for systems listed in Al-wakra station.

Earthing and bonding, Lightning and bonding system

Medium voltage and Low voltage system.

General lighting and power system

Plumbing and drainage system

Firefighting system

Fire alarm system.

Fire suppression system-FM 200

HVAC system

Façade lighting system.

Chilled water system

Portable water system

Security and signaling system.

Building automation control systems

VHTS systems

Ensuring inspecting the Equipment and materials in site according to material submittal and approved ITP documents prior to the site installation.

Monitoring the approval of MS, MAR, SD, ITP and RAL.

Recording and monitoring the materials availabilities according to the2-weeks ahead plan submitted by a concern contractor, and ensuring work flow accordingly.

Witness for the SMDB and MDB erection, Cabling and routing (conduit, tray, trunking, ladder) installation and T&C.

Supporting the BACS in server installation, backbone network routing and field panel connection with the corresponding Equipment.

Monitoring the installation and troubleshooting the fire alarm panel and network by respective contractor.

Monitoring and recording the SCADA and BACS Interface.

Resolving design issues with contractor, proposing as built as per site condition for effective solution.

Verifying the cabling and termination according to the designed Load schedule plan.

Interfacing between civil and MEP contractor to resolve the site issues and open work front for MEP activities

Reviewing the Design drawings and Co-ordinate with shop drawings in site as per Methods statements

Witnessing the stage by stage Inspection and ensuring the installation are as per standards.

Supporting the service Inspection according to the Project ITP(Inspection Test Plan)

Inspect and support the testing and commissioning of MEP,BACS,VHTS systems,

Monitoring the building automation systems installation (RIO panel, PLC and its corresponding field device installation and interface programming.

Ensuring all life safety systems are interfaced with BACS and it is stand-alone functions.

Coordinating with FITOUT sub-contractor and resolving the related functionality issues in station.

Recording the day by day MEP activities and submit the cumulative work progress in every week.

Attending the client meeting and discuss the work flow with respect to the project schedule.

Worked as part of Testing and commissioning for MEP systems.

Preparing the QCDD tracker and to ensuring all the Life safety systems interface & operations.

Conducting Pre-QCCD inspection and coordinate with all interface parties and ensure the systems are in place.

Preparing a detail report of FM200-Integrity and the system functionality prior to the QCDD inspection.

Ensuring all the FIRE scenario with respect to each level of the station are in place, and ensuring it is functionality.

Closing all the snags, NCR, ICF and handover the systems to operation and maintenance team.

Work Experience-3

Period:

Company:

Location

July 2013 – Jan 2015

Rising star Electro-mech contracting company.

Chennai, India.

Position: MEP Project Engineer.

Roles And Responsibility:

Planning the overall Project schedule according to the client requirements,

Coordinating with the client, consultant and other contractors/logistics activities, implementing effective and proven techniques to bring efficiency in operations, improving quality standards & achieving cost savings.

Reviewing of technical specification, data sheet and techno commercial offer evaluation.

Coordinating with Design team, consultants, sub-contractor and other interface contractor for successful completion of project.

Lead the team in testing and commissioning of MDB, DBs, MCC Panels &lighting control systems.

Responsible for ELV & Security systems.

Monitoring manpower thereby ensuring the timely achievement of group & individual target.

Monitoring and recording the weekly activity and reviewing the progress and test plan graph.

Ensuring the safety on the work place and Carryout safety inspection to improve safety levels.

Conducting the weekly drill to make sure the safety measures are in place and followed.

Coordination with Testing and Commissioning team and boost up the progress.

Work Experience-4

Period:

Company:

Location

July 2012 – June 2013

Aries Marine &Engg. Services, Sharjah/India-LLC

Sharjah-LLC, U.A.E

Position: QA/QC Engineer

EQUIPMENTS HANDLING

Ultrasonic Machines (USM 33,USM 35)

Magnetic Particle Testing Equipment’s( ELECTRO MG,PERMANENT MG)

Vacuum kit.

Hardness testing.

PWHT

RESPONSIBILITIES

Review SD drawings and interaction with third part inspectors and Client.

Inspecting the panel board and generator.

Inspect the materials as per specification and approved Material submittal.

Preparation of all QC check lists, Test Reports.

Preparation of weekly QC reports for client.

To attend progress / Weekly meeting with the clients and solve the issues.

Final meeting with project Client regards final report.

Work Experience-5

Period:

Company:

Location

September 2009 - May 2012

M/s Regen Power tech Pvt Ltd.

Tada, Andrapradesh.

Position: Electrical/Maintenance Engineer-Generator Manufacturing.

Roles And Responsibility

Heading a Production and responsible for Stator manufacturing

Scheduling the maintenance plan and maintained zero break down.

Responsible for the installation of MDB,SMDB and switch gear and it is maintenance,

Designing DB according to the power demand.

In charge for generator assembly and testing.

Implement the work as per approve SD and monitor the progress.

Planning day-to-day activities, production schedules and work allocation for achieving of monthly production targets by optimum use of available resources.

Monitoring and controlling product quality –Rejection and Rework rate.

Visual inspection in stator welded area and approval for next processes.

Monitoring and Controlling cost reduction activities to keep all input.

Monitoring and Controlling shop operation efficiency, Man-hour, Downtime, Production Plan vs. Actual and Delivery Performance.

Check the availability of materials as per BOM for each assembly.

Quality Assurance & Control:

Final Testing of Generator (No-Load Test).

Air gap checking after assembling of Generator.

In-process inspection of Stator at all stages (after Stacking, after Coil Insertion & Wedging, after Inter-connection, after Outer-connection or before Impregnation and after Impregnation of Stator).

Polarity checking of Rotor after Magnet Gluing.

Checking the critical aspects during every process.

Monitoring the process of Stator Manufacturing activities (Stacking, Coil insertion, Connection & Impregnation), Ensure those are carried out as per document and Recording the measurements.

Identify the areas of quality failures and take steps to rectify them.

NAZAR.A



Contact this candidate