MARK RAYMUND B. MARCELLA
Bldg. No. *** Spar Bldg., Airport Road, Al Wadha, Abu Dhabi, U.A.E.
Email add: add1kd@r.postjobfree.com Contact No.+971*********
SUMMARY OF QUALIFICATIONS
Highly motivated mechanical engineer with almost seven (7) years of experience in Petrochemical and Power Plant construction, shutdown and offshore commissioning works.
Strong understanding and knowledge in implementation of project procedures such as specifications and standards.
Demonstrated proficiency in AutoCAD, Smart Plant Review and MS Office
Strong analytical and innovative skills in reading and interpreting P&ID, schematic diagrams, blue prints, etc.
Highly skilled in effective reporting, technical specification writing requirements and techniques
Displayed ability to interact with the office team and construction team with complex environment and project.
Formerly highly involved engaged with the erection and installation of static and rotating equipment as per approved drawing and project specification.
PROFESSIONAL EXPERIENCE
Mechanical Engineer Hyundai Engineering & Construction Abu Dhabi, U.A.E.
June 02, 2015 - December 02, 2018
Key Project: Satah Al Razboot (SARB) Plant Facilities (Package 4)
– Offshore Commissioning, Siemens AGT Trent 60, Three (3) Trains Gas Compressor
Lube Oil flushing and commissioning works, OTP of Pumps, MRT for Air Fan coolers.
Duties and Responsibilities
Coordinate testing and commissioning activities.
Maintain commissioning records of site observations, testing processes and checklists.
Undertake testing and commissioning activities in line with the specified site requirements such as GT and Compressor Lube Oil flushing, OTP of Pumps, MRT for Air Fan coolers.
Monitor progress, record test result, witness final testing and acceptance.
Provide engineering and technical supports to mechanical work groups.
Key Project: Mirfa Independent Water and Power Plant Project
– Open Cycle Gas Turbine, Installation and Erection of four (4) units GE 9E Gas Turbine,
9A5 Generator, Exhaust, Air Intake system and Accessory skid.
Duties and Responsibilities
Day-to-day management of site erection and installation of major equipment.
Provide engineering and technical supports to all mechanical work groups.
Liaise with Subcontractor and ATH TA as required for resolving any technical issues
Perform site inspection of equipment along with Owner’s Engineer, ATH TA and subcontractor
Directs and supervise the disassembly, check and re-assembly of GT bearing (Unit no. 2)
Monitor and oversee the removal and re-installation of generator rotor (Unit nos. 3 & 4)
Ensures that all necessary records regarding verification of the completed work are maintained and, where required, are agreed with the main contractor and vendor representative.
Assist quality department team on work completion and inspection requests as required.
Mechanical Engineer Daeah E&C Qurayyah, K.S.A.
June 19, 2013 - June 25, 2014
Key Project: Qurayyah Independent Power Plant Project
– Installation and Erection of Six (6) Units of SGT-500 Siemens Gas Turbine,
Generator, Air-Intake System and Auxiliary Equipment
Duties and Responsibilities
Review necessary drawings and ensure that the latest revision is being used.
Collaborate with cost control and planning department in preparing the daily progress reports, plans and work schedule.
Plans the execution of all GTG Mechanical related works including material delivery as per site workability and coordinates the works to other groups.
Daily supervision, implementations and monitoring of all mechanical related works at site as per approved drawings and methods, project specification and safety rules.
Provide engineering and technical supports to all GTG mechanical work group.
Interface with Contractor and vendor representative as required for resolving any technical issues.
Perform site inspection of equipment along with contractor and vendor representative.
Mechanical Site Engineer DS Engineering L.L.C. Abu Dhabi, U.A.E.
November 18, 2011 - November18, 2012
Key Project: Fertil-2 Expansion Project
– Installation and Erection of Belt Conveyors, Reclaimer and Ship Loader; including
dismantling of existing structures, belt conveyors and ship loader.
Duties and Responsibilities
Monitors, tracks and prepare daily production report.
Plans and schedules material delivery as per site workability.
Prepare overall plan and schedule in mechanical works including Belt Conveyor installation and vulcanization, reclaimer, ship loader dismantling and installation, etc.
Prepares and follow-up approval of technical documents such as Method Statements, Rigging Plan, Rectification Request, etc.
Coordinates with PMC/PMT, main contractor and vendor representative concerning site queries, modifications, installation of equipment and technical documents.
Direct and supervise people at site regarding mechanical works.
Reviews and assess contracts of subcontractor for vulcanization works; and advice Site Manager on contract matters.
Cadet Technical Engineer Al Rushaid Construction Co. Ltd.- EEI Corp. K.S.A.
August 17, 2009 – February 17, 2011
Key Project: NCP Ethylene Plant – North Plot Project
– Installation of Above Ground and Off Rack Piping.
Duties and Responsibilities
Prepare weekly planning schedule, three weeks look ahead, three months look ahead and test package completion schedule.
Make as-built drawings due to ISO revisions and construction work sequence.
Prepare and raise Request for Inspection, Work Transfer Sheet; facilitate QCIR and SI disposition prior for compliance.
Review and monitor test packages prior for final inspection and testing.
Check site workability, take off field materials, identify workable spools
Monitor daily production for rig-up, fit-up and full welding of spools
Line checking of pipe lines prior for ISO and test pack completion; and balance material determination.
Coordinate with Main Contractor regarding construction field modifications and inspection matters.
Key Project: Qurrayah Power Plant Project
– Shutdown of Four (4) Units Boiler, 3RY Superheater and 2RY Reheater expansion
and rehabilitation of steam header roof insulation.
Duties and Responsibilities
Prepare plans and detailed schedules in shutdown works.
Monitors and tracks daily production; and prepares daily progress report.
Coordinate with Main Contractor regarding construction field modifications.
Reports to Construction Manager.
Review necessary drawings and ensure that the latest revision is being used.
Provide Technical support and assist supervisors and foremen in the field operation.
OJT Technician AMKOR Technology Philippines Inc. Binan, Laguna, Philippines
January 10, 2006 – June 3, 2006
Student Trainee SpeedCAD Designs and Trainings Bacolod, Negros Occidental, Philippines
April 18, 2005 – May 27, 2005
Student Trainee Sagay Central Incorporated Sagay, Negros Occidental, Philippines
April 18, 2004 – May 28, 2004
EDUCATIONAL QUALIFICATION
Professional Registered Mechanical Engineer October 2008, Reg. No. 0071463
Tertiary BS Mechanical Engineering, April 2008
Technological University of the Philippines Visayas,
Talisay City, Negros Occidental
Recipient, DOST RA7687 Scholarship (Five year duration)
PERSONAL DATA
Date of Birth : July 18, 1986 Weight : 172 lbs
Sex : Male Height : 5’4
Nationality : Filipino Health : Excellent
Civil Status : Married Religion : Roman Catholic
REFERENCE
Available upon request.