Post Job Free

Resume

Sign in

Piping Engineer

Location:
Doha, Qatar
Posted:
June 24, 2020

Contact this candidate

Resume:

DIANA SUAREZ

Piping Designer

Mobile: +974-********

Email: add15p@r.postjobfree.com

Doha, Qatar

Summary: Twelve years of working experience for the projects of LNG, Wellhead and Riser Platform, FPSO, Mining & Metals, Chemicals, Petrochemicals, Power, Mechanical/Plumbing/Fire Protection.

Experienced with SmartPlant-3D, Intergraph PDS, Aveva PDMS, OptimEyes, Microstation, Autocad, SmartPlant-Review, Navisworks and Material Management.

Specific Experience:

Sr. Piping Designer

MCDERMOTT EASTERN HEMISPHERE, LTD. (Airswift) January 2019 – Present DOHA, QATAR

Perform piping layout and modeling of equipment for wellhead and riser platforms using SP3D and PDMS.

Extract and revise isometric drawings.

Prepare drawings such as Equipment Plot Plan, Escape Route and Safety Equipment Layout, and Fire Zone Layout using Autocad.

Prepare MTO from P&ID.

Projects:

North Field Expansion Topsides and Pipelines – FEED Project – Qatargas – Qatar North Field Production Sustainability Project Investment 1, Project 1 EPC – Qatargas – Qatar Bul Hanine EPIC Re-development Phase 1-B Project – Qatargas – Qatar GALLAF Batch 2 FEED Project – North Oil Company – Qatar North Field Production Sustainability Dry & Wet Gas Spare Slot Brownfield Project – Qatar

Sr. Piping Designer

FLUOR DANIEL INC. – PHILIPPINES November 2018 – January 2019 MUNTINLUPA CITY, PHILIPPINES

Perform piping layout and modeling of equipment using SP3D. Assign WBS unit on model and prepare WBS break on P&ID. Project:

Rio Grande LNG (FEED) – NEXTDECADE – Texas

SP3D Data Compliance Checker

SPL CONSULTANCY SERVICES CO., INC August 2018 – September 2018 MAKATI CITY, PHILIPPINES

Perform data compliance check to ensure engineering data submission by contractor meet the requirement by comparing between client’s SEED plant and contractors’ plant and prepare S3D Gap analysis report to record the findings.

Project:

PETRONAS RAPID Plant - Malaysia

Piping Designer

MHPS TECHNICAL SERVICES CORPORATION (Kyoma) July 2017 – July 2018 MANDALUYONG CITY, PHILIPPINES

Perform piping layout and prepare piping isometrics using SP3D. Revise piping plan drawings using Autocad.

Projects:

Nakoso IGCC Power Plant – Japan

Navoi Thermal Power Station Modernization - Uzbekistan

Piping Designer

JGC PHILIPPINES, INC. (Kyoma) April 2017 – May 2017 MUNTINLUPA CITY, PHILIPPINES

Perform piping layout and equipment modeling using SP3D. Project:

LNG Canada (FEED) - Canada

Piping Designer

MITSUBISHI HEAVY INDUSTRIES ASIA PACIFIC PTE. LTD – MANILA Dec 2016 – March 2017 J&S CONSULTANCY SERVICES CO., INC. February 2016 – November 2016 MAKATI CITY, PHILIPPINES

Review vendor drawings of Instrument valves and check its dimensions and properties to support RDB preparation.

Perform piping layout and equipment modeling using SP3D. Prepare piping isometrics using SP3D.

Check hook up lines in between modules.

Resolve model review tags.

Projects:

Fertilizer Plant – TURKMENHIMIYA – Turkmenistan

Methanol & Dimethyl Ether Production Plant – CARIBBEAN GAS CHEMICAL LTD – Trinidad and Tobago

Piping Design Engineer

SAMSUNG HEAVY INDUSTRIES (MTC-INTERNATIONAL CO., LTD) February 2013 – June 2015 GEOJE, SOUTH KOREA

• Piping Test Pack Review Engineer July 2014 – June 2015 Affirm all check sheets and the latest revision of engineering documents have been included in the pressure test packages.

Review PDMS model and piping isometrics along with P&ID. Provide marked-ups to Process Engineer based on as-built. Confirm test pack numbering is correct.

Confirm flushing method and test medium are correct as per line list. Confirm design pressure and test pressure is correct as per line list. Identify in-line items to be removed for flushing and testing as per project’s specification. Confirm test pack boundaries as well as vent and drain points. Resolve rejected test packages.

Coordinate with Samsung design team, subcontractors, Technip and Shell. DIANA SUAREZ-3 of 4

• Hook-Up Piping Preparator February 2014 – July 2014 Identify hook-up piping and clashing points using PDMS model for the lifting and installation of module.

Prepare hook-up spool list and coordinate with Samsung construction team. Mark piping isometrics and P&IDs with Tie-in number using Autocad Cross checking materials.

Verify fabrication and installation status of hook-ups. Support to Integration work pack and report to Integration Manager.

• Piping Engineer (module in-charge)February 2013 – February 2014 Cross check design engineering issued piping isometrics against subcontractor’s fabrication drawings as well as material take off to be in conformance with DEP, project standards, fabrication and installation practices such as spool, piping general and special supports, support location, infill/trimmer and grating hole using PDMS and Autocad. Coordinate the fabrication drawings with Korean subcontractor. Provide MTO of small bore valves from P&ID that are SHI scope. Submit site technical queries and propose solutions to Technip. Estimate volume of piping system with golden welds. Coordinate in resolving clashes and issues related to design, construction and installationby having interface with Technip, Shell, and Samsung design and construction team. Project:

Prelude Floating LNG (Technip / Samsung Consortium) – ROYAL DUTCH SHELL – Australia

Piping Designer

FLUOR DANIEL INC. – PHILIPPINES January 2011 – January 2013 MUNTINLUPA CITY, PHILIPPINES

Perform piping layout and equipment modeling using PDS and SP3D. Prepare piping isometrics using Microstation.

Develop isometric sketches for pipe stress analysis and implement stress analysis comments. Draft drawings for pipe support request.

Resolve clashes and execute Reference Database updates. Review modeled lines and update isometric status using Piping Utilities. Prepare MTO from P&ID and then update quantities and piping components on BOM in accordance to project’s material specifications.

Align material class specifications of Fluor with Client’s standard on FEED project. Input materials specifications on Material Manager Software. Assign line identification numbers to flow diagrams in a logical sequence as well as checking its continuity and input data in to line list.

Perform conceptual modeling using OptimEyes and SP3D. Revise plot plan drawings using Microstation.

Review equipment general arrangement drawings and resolve model review tags. Supervise newly hired engineers.

Interface with local project disciplines and respective counterparts in Haarlem, Houston, Malaysia, Spain and Vancouver.

Projects:

Dow Propane Dehydrogenation – DOW CHEMICAL CO. – Texas LNG Regasification Terminal (FEED) – PETRONAS GAS BERHAD – Malaysia Super Absorbent Polymer Plant – (JV) SAAC & EVONIK INDUSTRIES - Saudi Arabia Vale Long Harbour Nickel Processing Plant – VALE CANADA LIMITED – Canada TAKO 2 Catalyst Plant – BOREALIS AB - Austria

Jr. Estimator MEPF

CONSTECH MANAGEMENT GROUP, INC. March 2010 – September 2010 QUEZON CITY, PHILIPPINES

Prepare MTO and BOQ.

Inquire material pricing from suppliers.

Comply with applicable labor rates and markup pricing. Provide cost estimates of Plumbing/Sanitary, Fire Protection and Mechanical Works for new construction or renovation of commercial and residential buildings. Prepare abstract and summary of bids.

Create and convey of memorandum and bid bulletin thru fax or email. Carry out tasks assigned by the Project Lead and Cost Control Division Head.

Piping Designer / Material Support

FLUOR DANIEL INC. – PHILIPPINES July 2005 – December 2008 MUNTINLUPA CITY, PHILIPPINES

Perform piping layout and equipment modeling using PDS. Prepare piping isometrics using PDS and Microstation. Check modeled lines using SmartPlant-Review and isometrics against P&ID. Produce stress sketches and piping plan for stress system analysis. Incorporate stress comments and process requirements. Draft drawings for pipe support request.

Resolve clashes and execute Reference Database updates. Review modeled lines and update isometric status using Piping Utilities. Review and update P&ID and vendor document.

Review documents for squad check such as supplier equipment drawings, civil foundation and structural steel.

Resolve client’s comments on piping aspects from model review. Assist Material engineering group by preparing of piping material specifications and creation of piping commodity data (PCD) for PDS.

Validate materials and quantities on piping isometrics together with project’s material specifications and generated bill of materials from Material Manager Software. Provide material take-off from Piping General Arrangement drawings. Revise Equipment Location Plan.

Supervise newly hired engineers.

Interface with local project disciplines and respective counterparts in Camberley, Greenville, Houston, and Shanghai.

Projects:

LDK Polysilicon Facility – JIANGXI LDK PV SILICON TECHNOLOGY CO., LTD– China Saudi Kayan Petrochemical Complex U&O – SABIC - Saudi Arabia OL2K LPK Polyethylene Expansion – EQUATE (DowPIC) – Kuwait Yanbu Petrochemical Complex U&O – SABIC - Saudi Arabia Bohai FPSO Phase II Offshore Development – CONOCOPHILLIPS CHINA – China

Education:

Bachelor of Science in Mechanical Engineering(March 2004) University of Santo Tomas, Manila, Philippines

Professional License:

Registered Mechanical Engineer (October 2004)

Professional Regulation Commission – Philippines



Contact this candidate