Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Jenks, OK
Salary:
126,000 yearly
Posted:
June 23, 2020

Contact this candidate

Resume:

Mobile: 918-***-**** add0zi@r.postjobfree.com

STEVE L. HALL

QUALIFICATIONS

** ***** ** *** *********** field. Proficient in ASME pressure vessel, ANSI B 31.3 piping, Instrumentation (transmitters, pressure devices, automated valves, flow measurement, and relief valves) Structural Steel, Filtration, and Packaged Systems

PROFESSIONAL EXPERIENCE

Arrow Engine Company, Tulsa,OK May. 2019 – Present

Application Engineer

Handles sales and project execution of Reciprocating Compressor packages for the oil and gas Industry,

Performs direct process engineering, mechanical engineering, structural engineering, and control engineering for the timely delivery of drawings and calculations, to the customer for the fabrication of the reciprocating compressor packages

Aids procurement by writing specifications for equipment and the selection of outside fabrication when warranted

Preparation of quotations

Inspects equipment during the fabrication cycle

Reviews customer specifications, weld procedures for fabrication, and purchase requirements for new orders; maintains customer correspondence for both proposals and order report to Director of Sales and Project Management

GARDNER DENVER GARO (ITALY), Charleroi, PA Jun. 2018 – Mar.2019

North America Sales Manager (Remote)

Handles sales and project execution of Liquid Ring Compressor packages for the oil and gas Industry, including sale of chemical and chlorine compressor-based packages utilizing liquid ring compressor technology

Performs direct process engineering, mechanical engineering, structural engineering, and control engineering for the timely delivery of drawings and calculations, to the customer for the fabrication of the liquid ring compressor packages

Aids procurement by writing specifications for equipment and the selection of outside fabrication when warranted

Assists in the preparation of quotations

Inspects equipment during the fabrication cycle

Reviews customer specifications, weld procedures for fabrication, and purchase requirements for new orders; maintains customer correspondence for both proposals and order report to Director of Sales and Project Management

FILTRATION GROUP, Nowata, OK Mar. 2018 – Jun. 2018

Senior Estimator

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders, generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and overseeing the Shop Supervisor for schedule and compliance to job specifications

Assisted the President in day to day operation and future planning

Reported directly to the General Manager

ZEECO, Broken Arrow, OK Jun. 2017 – Mar. 2018 Project Engineer

Handled project execution of Flare Gas recovery equipment orders

Handled direct process engineering, mechanical engineering, structural engineering, and control engineering for the timely delivery of drawings, calculations, to the customer for the fabrication of the flare gas recovery packages

Aided procurement by writing specifications for equipment and the selection of outside fabrication when warranted

Assisted in the preparation of quotations

Inspected equipment during the fabrication cycle

Reviewed customer specifications and weld procedures for fabrication, reviewed purchase requirements for new orders, and maintained customer correspondence for both proposals and order Report to Manager of Vapor Control Products Management

T&D FABRICATION, Drumright, OK Sep. 2016 – Jun. 2017

Senior Engineer

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and overseeing the Shop Supervisor for schedule and compliance to job specifications

Assisted the President in day to day operations and future planning

Reported directly to the President

ZEECO, Broken Arrow, OK Mar. 2014 – Sep. 2016 Project Engineer

Handled the project execution of Flare Gas recovery equipment orders

Handled direct process engineering, mechanical engineering, structural engineering, and control engineering for the timely delivery of drawings, calculations, to the customer for the fabrication of the flare gas recovery packages

Aided procurement by writing specifications for equipment and the selection of outside fabrication when warranted

Assisted in the preparation of quotations

Inspected equipment during the fabrication cycle

Reviewed customer specifications, weld procedures for fabrication, and purchase requirements for new orders; maintained customer correspondence for both proposals and order reports to the director of Engineering and Project Management

SOUTHWEST FILTER COMPANY, Tulsa, OK Sep. 2011 – Mar. 2014

Engineer

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and overseeing the Shop Supervisor for schedule and compliance to job specifications

Assisted the President in day to day operation and future planning

Reported directly to the President

VELCON, Colorado Springs, CO Dec. 2009 – Aug. 2011

Application Engineer

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and handling quotation preparation and equipment applications

Reported directly to the VP Sale Manager

JOHN ZINK, Tulsa, OK Oct. 2008 – Nov. 2009 Project Manager

Handled project execution of Flare Gas recovery equipment orders

Performed direct process engineering, mechanical engineering, structural engineering, and control engineering for the timely delivery of drawings, calculations, to the customer for the fabrication of the flare gas recovery packages

Aided procurement by writing specifications for equipment and the selection of outside fabrication when warranted

Assisted in the preparation of quotations

Inspected equipment during the fabrication cycle

Reviewed customer specifications, weld procedures for fabrication, and purchase requirements for new order; maintained customer correspondence for both proposals and order

Report to the Director of Engineering and Project Management

FACET INTERNATIONAL, Tulsa, OK Mar. 2004 – Oct. 2008

Application Engineer

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and handling quotation preparation and equipment applications

Reported directly to the Inside Sales Manager

SOUTHWEST FILTER COMPANY, Tulsa, OK Sep. 1992 – Mar. 2004

Chief Engineer

Handled sizing of filtration equipment for quotations, generating equipment proposals

Oversaw drafting for new equipment orders generating ASME code calculations when required, reviewing customer specifications, weld procedures for fabrication, and purchase requirements for new orders, maintaining customer correspondence for both proposals and orders, and overseeing the Shop Supervisor for schedule and compliance to job specifications

Assisted the President in day to day operations and future planning

Reported directly to the President

FACET QUANTEK, INC., Tulsa, OK Mar. 1982 – Sep. 1992

Project Engineer

Handled start-up and service of new and existing equipment

Handled Research and Development of new products relating to the Industrial filtration and Environmental fields

Handled quotation preparation and equipment applications

Supervised one Electrical Engineer, two Designers, two Service Technicians and aided Production Engineering and the Sales Department by training personnel on new equipment

Reported directly to the Director of Engineering

MALONEY CRAWFORD CORPORATION, Tulsa, OK Oct. 1980 – Mar. 1982 Plant Coordinator

Prepared quotations for oil and gas production equipment, originally, then was transferred to a Manufacturing plant

Prepared weekly labor schedules for welders, fitters, assembly, and paint personnel

Purchased raw material for plant and production requirements

Started and implemented a safety program

Aided customers with engineering related problems

Reported to the Vice President of Manufacturing and the Plant Manager

FACET ENTERPRISES, INC., Tulsa, OK May 1979 – Oct. 1980

System Designer

Designed oily water separators, consisting of structural, piping, electrical, and pressure vessels

Detailed fabrication drawings; handled quote preparation and material selection

Tested separators before shipment and start-up of equipment in the field

EDUCATION

TULSA AREA VO-TECH

535 hours advanced static and strength of Materials

CLEVELAND SCHOOL OF ELECTRONICS



Contact this candidate