Post Job Free

Resume

Sign in

Mechanical Engineer Power Plant

Location:
Pune, Maharashtra, India
Posted:
June 23, 2020

Contact this candidate

Resume:

NAZIR AHMAD

Sadiya Villa, Kailash Nagar, MPHB, Bhilai, Dist. Durg, (CG)490026.

Contact No.:+91-989*******; E-Mail: add0t5@r.postjobfree.com Seeking challenging assignments in Project Management/Installation and Commissioning/Operations & Maintenance with an organisation of high reputed Cement Plant. CAREER SNAPSHOT

A dynamic individual with 30 yrs of experience in Project Management, Operations & Maintenance, Installation and Commissioning and Quality Management.

Presently associated with CEM-VISION FZCO(DUBAI based) for O&M of 4200TPD cement plant of FCKS Angola(Africa) as Sr. Maintenance Engineer Mechanical .

Carried out significant installations and commissioning in the plants; handled functions pertaining to inspection, pre-commissioning and functional testing with Safety.

Ensured operations to be as per the set parameters & standards and experience of developing procedures for operational excellence.

Effectively conceptualised and completed various operations pertaining to maintenance repair and up keeping of various equipment.

Skilled in carrying out efficient troubleshooting in case of problems in functioning of process related equipment. CAREER CONTOUREM

Feb 2018 to Till now Working with CEM-VISION FZCO as Sr. maintenance Engineer Mechanical.(4200 TPD FLS Plant)

Roles and Responsibilities

Overseeing of mechanical maintenance of Crusher to Packing plant. Preparation of maintenance schedule of all mechanical equipment. July2013 to Jan 2016 Heidelberg cement technology center, Indonesia branch as Project Mechanical Supervisor.

Projects : VRM/ Packing plant expansion project in Indocement(Indonesia) Roles and Responsibilities

Overseeing erection of cement silo(IBAU) mechanical equipment, elevator(Aumond), Packer machine(Heaver) and material handling belt conveyors.

31st March’11 to 13TH Jan’13 Heidelberg Cement India Limited, Damoh as Manager Mechanical (Projects) Projects : New 5000 TPD Kiln(FLS) project

Roles and Responsibilities

Overseeing the fabrication of steel structure (6000MT) & erection of steel structure( 6000 MT)&mechanical equipment erection(3200 MT) of 22 KM long Limestone belt conveyor With belt turning device. Successfully commissioned the 22 KM long belt conveyor. Jul ’08 to Dec’11 Ayoki Fabricon Pvt. Ltd., Bhatapara(Raipur)as Dy. Manager (Project) Project: Rawan – New Cement Line Project –7000 TPD Polysius Kiln)in Ambuja Cement Roles and Responsibilities

Overseeing the erection of 7000TPD Kiln (Polysius),Polytrack clinker cooler, Pre-Heater(Six Stage),Stacker

&Reclaimer, Blending silo &accessories(All Static & Rotating equipments) . Key Highlights

Handled the rotating equipment erection such as Big process Fans, Screw compressors& Blowers, Belt elevators

&conveyor, heavy Gearboxes, deep pan conveyors etc. Nov ‘07 to Jun ‘08 Lafarge India Pvt. Ltd., through MO-FAI Sonadih(Raipur)as Mechanical Engineer

(Project)

Project: (Sonadih – New Cement Line Project – 5000 TPD Kiln) Roles and Responsibilities

Handling the erection of 5000 TPD Kiln(TCDRI- China), Pre-Heater (Five Stage), Clinker Cooler (Hydraulic Drive)

&other accessories.

Overseeing the approval of:

o The method of statement, Risk Assessment, FHRA (Fall Hazard Risk Assessment) for Erection

&Assembly work.

o WAH Permit (Working at Height), Hot Work (Welding& Cutting), Scaffolding Permit & execution of the work with Safety Standard of Lafarge Global.

o PTW (Permit To Work).

Key Highlights

Successfully evaluated the quality of erection & assembly work.

Deftly assessed the protocol and conducted approval. Mar ‘07 to Oct ’07 Vandana Global Ltd.,Siltara(Raipur)as Mechanical Engineer- Sponge Iron Division Project: (Raipur–Sponge Iron Unit – 500 TPD Kiln)

Roles and Responsibilities

Handling the erection & commissioning of 500 TPD Sponge Iron Kiln & Accessories. Aug ‘05 – Oct ’06 Yanbu Cement Company, Yanbu(K.S.A) as Mechanical Sr. technician Project: Saudi Arabia – Cement Plant – 7000 TPD Kiln & Raw Mills Roles and Responsibilities

Taking over the maintenance of Cement Plant – 7000 TPD Kiln,Raw Mills, Stacker & Reclaimer. Mar ‘97 to Jun ‘05 ACC Ltd., Yanbu(K.S.A)as Mechanical Sr. technician Project: Overseas project at Yanbu Cement Company (Saudi Arabia, Cement Plant – 7000 TPD Kiln & Raw Mills) Roles and Responsibilities

Managing assignments in 7000 TPD Kiln (KHD- Humbolt) with Double String Five Stage Preheater, Alkali Bypass System, Hydraulic Drive Cooler supplied by CPAG.

Conducting the replacement of Kiln Tip Casting Block, Cyclone Roof Immersion Tube, Cooler Frames/Plates Replacement & Alignment, Coolers Fans Impeller, Electrodes in Hot ESP and Mills Diaphragm Replacement.

Carrying out the repair & maintenance of Cooler Breaker, Cyclone Roof, Crude & HFO Firing System Pumps, Arzen Make Airlift Blower, Screw Compressor Atlas Copco Make, etc. Sep‘89 to Feb ‘97 Modi Cement Company, Bhatapara(Raipur)asSHIFT-INCHARGE(MECHANICAL) Project: Raipur– Cement Plant - 3300 TPD Krupp Polysius Plant. Roles and Responsibilities

Handling the maintenance of Kiln, Cement Mill, Vertical Raw Mills Power Plant with the Wartsila Engine. ACADEMIC

2011 Bachelor of Engineering(Mechanical) from Pacific Institute of Engineering and Management. 2001 Diploma in Mechanical Engineering from IME Bombay. 1989 Artisan course in fitter trade from A.C.C. from Kymore Engineering Institute IT FORTE

Well-versed with using computer fundamentals and implementing Computerized Preventive Maintenance System& Familiar with M.S.PROJECT.

PERSONAL SNIPPET

Date of Birth : 26/06/1967

Present Salary : 3750 USD with free food and accommodation



Contact this candidate