Post Job Free

Resume

Sign in

Engineer Manager

Location:
Tripoli, Tajura wa Arba' District, Libya
Salary:
14000
Posted:
June 23, 2020

Contact this candidate

Resume:

Sudhakar Mukkara

Graduate Civil Engineer (****) With 27 Years Exp.

Tel: +91-950*******; +218*********

Oil&Gas-12Yrs, Mixed Used Building-6Yrs; Other-6Yrs

Email:add0m5@r.postjobfree.com

India-9 yrs, Gulf-16 Yrs, N.Africa- 2 Yrs

Alternate email: add0m5@r.postjobfree.com

Highlights of Experience: (Total 27 years);

1-Execution:

Worked at Different levels includes Client side Area Manager, Lead QA/QCCivil, QA/QC Manager, Project Engineer, Civil, Senior Engineer, with National and International EPC Contracting& Govt.Owned Companies’.

Well experienced in QA/QC procedures & ISO standards, execution of Oil& gas projects, Offshore & onshore projects Fixing of Single Point Mooring (SPM), oil well stations, Port Quay Wall construction, Industrial buildings, Process & Non Process Buildings, Infrastructure projects(Asphalt Roads, infill Roads, Storm Network, Portable & Sewer water Networks) Oil & Gas, Refinery, Chemical Industries, Petrochemicals, Terminals, Ports and Power plants, gas pipeline, crude pipeline, exposure to multi discipline (E&I, Mechanical, Telecom) activities, etc..

Certified ISO 9001-2008Internal/Lead Auditor and ISO 9000 course --- 2008

Familiar with industry standards & codes like BS, ASTM and IS.

Providing technical advices to projects for cost efficiency manner, analysis, manage and mitigate risks for project.

Familiar with Construction Planning, Construction Management, Cost Controlling & Managing Multi discipline.

Reviewing the requirements of the project specification / discussion with clients / analyzing & finalizing.

Preparing/Reviewing/Approving method statements, Risk Assessments, ITP’s and all other quality related documents.

Well versed with Safety & quality standards related to Oil & Gas projects (Onshore and Offshore).

Project implementation – liaison with clients (Licensors), Consultants, Contractors and Vendors.

Participating contractor, client, consultant meetings, weekly, monthly.

Project schedule monitoring and follow up with project manager regarding remedial actions.

Responsible for manpower & material management including MTO’s, Raising material requisitions, material submittals etc.

Managing all phases construction activates during construction / interface with other departments.

Capable of completing the projects through various in-house and outsource agencies, ability to prioritize in a multitasking environment.

Handled multinational work force –Senior Engineer/ Supervisors, QC Engineers/ Inspectors,(Total Manpower at peak 600 No.)

Highly motivated, proactive, with excellent written verbal and interpersonal communication skills. Good Team leader.

2-Design :

Design co-ordination between design contractor and executing contractor(JV). Design Reviewing and commenting, All the design issues/partly design reviews&approval are channeled thru me, and was actively involved in finding effective/economical solutions for the design discrepancies/site hidden construction obstacles in order to achieve smooth progress of the responsible projects.

3-Quality:

Certified ISO 9001-2008Internal/Lead Auditor and ISO 9000

Carry out daily inspections as per the allocation by QC supervisor based on RFI(Request For Inspection) submitted by contractors.

Stringent measures/monitoring the quality system in the assigned projects. Ensuring the contractor strictly adheres the approved PQP/ITP.

Materials inspection at factories as per manufacturer / contractors requirement

Ensuring all the material(Vendor/third party supplied) are in strict compliance to the project/relevant international specification/standards.

Alerting the contractor on maintaining sufficient project materials related civil construction and ensuring to stockpile sufficient quantities to execute the works with the given schedules.

Raising NCR where ever applicable and fallow up for close out of the same with reference to applicable standards/specification/ procedures.

Reviewing and Approving “Method Statements” for specific task at Project site as per the client.

Participating/Conducting scheduled audits as per PQP audit Matrix/Schedules.

4-Safety

Ensuring company/corporate/country safety standards are maintained with a “ Goal Zero” Incident/accident/LTI etc.

Strict adherence to Project HSE plan by all company/contractors/sub-contractors/vendors- involved in the business.

To ensure all contractors equipment, security, sub contractor, safety, main contractor, consultants comply with safety regulation and procedure as per approved HSE plan and client requirements.

Ensuring the contractor execute effective waste management in all the areas includes living units/workshop facilities/project sites etc.

Taken active role in bringing up the “SAFETY First” culture in Hearts and Minds of all the employees i.e. Company and Contractors.

Attending tool box meeting, safety meeting and conducting/witnessing mock drills etc.

:DETAIL SUMMERY OF EXPERIENCE :

Present Employment:

Taknia Libya Engineering Consultant / Harouge Oil Operation- - Since Jan 2018 to Till – Worked as Construction Manager.

Responsibilities:

Project Profile:

Construction and maintenance of oil storage tank farm at Ras Lanuf. New scope preparation and offering for tenders.

Construction and maintenance of Ras Lanuf staff Camp, Loading Terminal and Marine jetty.

Amal well station maintenance works, flow line, new well staking, renovation of pipeline works.

Crude Station maintenance works, manifolds, gas separators, crude separates, gas compressor works.

Reviewing Engineering Drawings and making suggestions for cost perfectness.

Reviewing ongoing contractor’s construction projects.

Contractors material inspection, witnessing of factory tests before procuring materials.

Previous Employment:

Shakti Enterprise / Bureau Viritas Oman- - Since May 2015 to Dec 2017 – Worked as Sr.Construction Manager on Different Client Side Positions for British Petroleum/ Orpic / RSPL etc.

Responsibilities:

Project Profile:

Construction of 57 Well Pads (Total 395) including (Site Grading, Earth Works, Cellar Pit Works, Waste Water and Mud Pits, Mud Mats/Mud Pads etc. and Installation of well site facilities after drilling.

Construction of Khazzan Consolidated Contractors Camp (KCC) with 1500 Beds and associated infrastructure building like clinic, mosque etc.

Construction of BP Permanent staff Living Quarters Project i.e. Khazzan Residential Complex (KRC) with 250 Rooms with allied supporting infrastructure buildings like Canteen & Recreation, swimming pool, Laundry, Sub-station building, Mosque Building, Mechanical and Technical Building and other infrastructure services like Sewer & Storm Water Networks, Landscaping and Asphalt Roads, Interlocking paving’s etc.

Construction of Khazzan Operations Base (KOB) includes total 9Nos of Permanent buildings like Admin building, medical building, Admin &Canteen Building, Gate House Building, District Cooling plant etc. for BP maintenance and operations.

Asphalt Road of 70KMS and Infield Graded Roads(150+ KMS).

Construction of RWTP Plant, Waste Management Area, and Sewage Treatment Plant,

Gathering and Export Pipe Lines up to 36” Dia. and utilities distribution network comprising GRE & HDPE Pipe lines.

Orpic Pet cock Storage Facility silos 2 Nos 40M dia & 50 M height.

RSPL Construction of Boundary wall and early civil works to plant.

Job Function:

Lead The Construction site BP, ORPIC & RSPL. Reporting To The BP Area Construction Manager.

Serve as a member of the HSE/ QA/QC/Construction Teams.

Responsibilities:

Actively participate in promoting site HSE and fallow HSE golden rules. Reporting STOP cards.

Overseeing contractors’ construction activities in line with Project Schedules/HSE & Quality standards in the area of civil discipline.

Reviewing the contractors submittals and making comments / approvals.

Reviewing & Providing inputs from Quality Point of view for site change proposals during construction, including giving fullest support in preparing / Approving shop drawings..

Carry out Daily site inspection as per the RFI allocation on specific areas of construction. Carry out all the inspections as per ITP.

Reporting non compliances with respect to project / standard specification and highlighted/ reported to the line managers.

Up to date materials approvals as per project requirement and keeping a log.

Preparing daily report on Construction / QC Civil Inspections and forwarding it to the line managers.

Preparing weekly report on Construction / QC Civil Inspection and forwarding it to the line managers.

Carry out site QC surveillance visit and find/report the deficiencies if any.

Be part of internal audit team and carry out audits on contractors as per audit matrix.

Co-ordinate external audit team in carry out scheduled audits.

Reviewing the final QCD(Quality Control Dossiers) of responsible projects prior to approval by lead QC supervisors/Managers.

Provide technical support, solution, problem solving and recommendation for obstacles, technical issues, constructability and material substitution or replacement together through the reply of Technical or Engineering Query.

Supporting the construction team in ensuring the availability of Resources and Equipment Prior to Start the Work. (Review and check Manpower/work front Histogram, Bill of Material and List of Equipment required to carry out the task as per scope of work.

Carry out inspection, Monitor the progress construction activities and compliance with Approved for Construction Drawing, Ensure Red Marked up drawing to be issued for as built data.

Evaluate and provide feedback to construction progress and improvement of contractor performance in required areas.

Previous Employment:

Cairn India Ltd, March 2011 to April 2015, Worked as Construction Manager “Bhogat Oil Terminal Project” Offshore & Onshore

Project Profile:

Construction of Process and Non Process Building (Site Grading, Earth Works), Fire Station Building, Control Building, Main Electrical Substation, Medical Building, Masque Building, Main Enterance Building, CTM Sheed, Export Booster Pump Shed, Ware House Building, Main Office Building, Admin Bilding.

Construction of 60 Dia 20M high Crude Oil Storage Tanks 8 No’s, Light Flushing Oil Tanks 3 No’s, Fire Water tanks 3 No’s, etc.

Construction of Cairn Permanent staff Living Quarters Project i.e. 54 Nos independent Buildings,allied supporting infrastructure buildings like Canteen & Recreation, swimming pool, Laundry, Sub-station building, Mosque Building, Mechanical and Technical Building and other infrastructure services like Sewer & Storm Water Networks, Landscaping and Asphalt Roads, Interlocking paving’s etc.

Construction Of Pipe Sleepers and 3 tire Pipe Racks, for the facilitating crude oil lines and related Infrastructures total 86 KM.

Construction of Crude Pipeline 65KM(Heat Insulated Pipe), Gas Pipe Line 35Km.

Asphalt Road of 20KMS and Infield Graded Roads(180+ KMS).

Construction of RWTP Plant, Waste Management Area, and Sewage Treatment Plant,

Responsibilities:

Reviewing contractors / sub contractor submittals on daily basis making comments / approvals.

Arranging meeting with the contractors / sub contractors for delivering all Project related documents submittals on time

Preparing daily Construction / QA/QC report and forwarding it to the line managers.

Preparing weekly Construction / QA/QC report and forwarding it to the line managers.

Reviewing contractors progress, material requirement for the project smooth running.

Reviewing Contractors schedules / Method statements / quality documents / NCR

Carry out site QC surveillance visit and find/report the deficiencies if any.

Material inspections at factory as per requirement of manufacturer / contractor / client

Be part of internal audit team and carry out audits on contractors as per audit matrix.

SPM installation for loading point of Crude Oil

Rejection waterline installation to sea offshore

Installation of 7.5KM crude pipe line to SPM offshore

Actively participate in promoting site HSE and fallow HSE golden rules. Reporting COP cards.

Jan 2010 to Dec 2010 Worked with ED Zublin as QC Manager At UAE “Khalifa Industrial Port Zone Project” (KIPZ) Offshore

Project Profile:

Construction of 3.5KM Quay wall and installation of single mooring points, Double mooring Points & Rail.

Construction of Khalifa Industrial Port Zone Facilities.

Construction of Process and Non Process Building Fire Station Building, Control Building, Masque Building, Export Booster Pump Shed, Fire Pump Shead.

Construction of 60 Dia 20M high Oil Storage Tanks 2 No’s,, Fire Water tanks 1 No’s, etc.

Construction Of Pipe Sleepers and for the facilitating storage oil lines and related Infrastructures total 45 KM.

Responsibilities:

Carry out Daily site inspection as the RFI allocation on specific areas of construction. Carry out all the inspections as per ITP.

Non compliances with respect to project / standard specification are highlighted and reported to QC supervisor to raise NCR.

Up to date materials approvals as per project requirement and keeping a log.

Preparing daily report on QC Civil Inspections and forwarding it to the line managers.

Preparing weekly report on QC Civil Inspection and forwarding it to the line managers.

Carry out site QC surveillance visit and find/report the deficiencies if any.

Be part of internal audit team and carry out audits on contractors as per audit matrix.

Actively participate in promoting site HSE and fallow HSE golden rules. Reporting STOP cards.

Feb 2008 to Dec 2009 Worked with Powerline Engineering Qatar,as QA/QC Manager “Medina Central Project & Porto Arabia 18 Story Buildings

Project Profile:

Construction of Multi Residential Building, Commercial Buildings and related Infrastructure works, Roads, Strome Drains, Portable and Drainage Lines 35KM.

Construction of 18 story Buildings 3 nos and related infrastructure works.

Construction Of Land Scaping and Gardening works for Medina Central Project

Responsibilities:

Preparing Project Quality Plan, Construction Quality Plan, Quality Assurance plan and ITP,s

Keeping a track on design team and day to day site works.

Preparing Method statements and site site quality checks.

Keeping a vigil on QA/QC inspectors for site quality improvement

Up to date all quality document registers maintaining as per project requirement and keeping a log.

Preparing daily report on QC Inspections and reporting to Corporate Quality manager.

Preparing weekly report on QC Inspections and reporting to Corporate Quality manager.

Actively participate in promoting site HSE and fallow HSE golden rules. Reporting STOP cards.

June 2005 to Jan 2008 Worked with STRABAG OMAN as Site Manager “Sohar Methonal Co Project” Offshore and Onshore, Oil Tanking Odeffjell Terminals.

Project Profile:

Construction of Process and Non Process Building (Site Grading, Earth Works), Fire Station Building, Control Building, Main Electrical Substation, Medical Building, Masque Building, Main Entrance Building, Reformer Shed, Export Booster Pump Shed, See Water Pump Sheed, Ware House Building, Main Office Building, Admin Bilding.

Construction of 60 Dia 20M high Methonal Storage Tanks 3 No’s,, Fire Water tanks 2 No’s, etc.

Construction of Equipment Foundations, Piling, Reactor Foundation, Grade Slabs.

Construction of SMO Permanent staff Living Quarters Project i.e. 87 Nos independent Buildings,allied supporting infrastructure buildings like Canteen & Recreation, swimming pool, Laundry, Sub-station building, Mosque Building, Mechanical and Technical Building and other infrastructure services like Sewer & Storm Water Networks, Landscaping and Asphalt Roads, Interlocking paving’s etc.

Construction Of Pipe Sleepers and 3 tire Pipe Racks, for the facilitating Methonal lines and related Infrastructures total 200 KM.

Construction of Oil and Gas Storage spaces for Oiltanking Odeffjell Terminals and related Infrastructure works.

Construction of Methanol Export Pipeline 9KM, Sea water Intake Pipe Line 4Km.

Asphalt Road of 32KMS and Infield Graded Roads(80+ KMS).

Construction of RWTP Plant, Waste Management Area, and Sewage Treatment Plant,

Construction of 60 dia and 20M high tanks 3 nos for Methanol storage space for SMCo.

Construction of total plant infrastructure and road works for SM Co.

Construction of 80 Dia and 20M high tanks 6 nos for Gasoline storage space for Oiltanking

Construction of 30 Dia and 20M high tanks 8 nos for Naphtha storage space for Oiltanking

Construction of 50 Dia and 20M high tanks 10 nos for Jet oil storage space for Oiltanking

Construction of 20 Dia and 15M high Tabks 6nos for Firewater storage space for Oiltabking

Construction of Bund walls and related pipe line works, Pipe sleepers.

Responsibilities:

Follow up with Sub contracts on daily basis

Reviewing the required document drawing, quality documents for the project smooth running.

Methonal loading are fixing offshore facility at Sohar port with Contractor STFA

Rejection waterline installation to sea offshore

Heading team of highly experienced Engineers, foremen’s on site.

oKeeping track of all site progress actives, quality records & Standers.

Maintains Codes as per the contract specifications. Planning, Monitoring & Execution of the project.

To coordinate with the consultant getting updated drawings on time to unable us to delay in progress for the completion target dates.

Arranging site progress & quality meeting to the subcontractor.

Strict compliance of HSE standards for safe working on project works.

Construction quality management through a defined and approved work procedures and methodologies.

April 2002 to April 2005 Worked with Bison Engineering Consultants as a Civil Engineer at Oman For IBRI Municipality

Responsibilities:

Preparation of structural calculation of residential buildings, commercial buildings and getting approval from IBRI Municipality Engineering department.

Structural inspections of residential buildings and on going projects. Review of client necessities, and arranging contractors like civil, Interior decorators, electro-mechanical contractors.

To maintain quality standards as per the requirement of Client

Prepare quantities and settling of payment client and contractor, estimation of approved drawings for bidding of contractors and preparation of bill of quantities.

Feb 2001 to March 2002 Worked with Public Services Co Oman as Project Engineer “Sur Fisheries Harbor Pipeline Project”

Responsibilities:

Headed project as Senior Engineer (Civil) by leading a team of experienced Civil Engineers.

Reviewed a fast track pipe line project planning, monitoring & execution of project civil works like 150Dia of DI pipe 1.5 Kms total length with proper anchoring and necessaries fittings like fire hydrant valve pits, valve chambers and future extensions etc.

Over all in charge of water emergency services at Dhara region and domestic water service connections.

March 1999 to January 2001 Worked with AJ Builders as a Project Engineer at India For Apartment Constructions

Responsibilities:

Worked as Project Engineer assisted by construction civil engineers / civil supervisors and direct reporting to Project Manager.

Review of project planning, monitoring & inspection of project civil & structural works.

Preparation of invoices, sub contractor bills. Manpower allocating, arranging site meetings for speed up the progress.

March 1996 to Feb 1999 Worked with Moderan Arab Construction Co as a Site Engineer at Saudi Arabia For Ainder Cement Plant / Arabian Petrochemicals / Safaniya Power Plant.

Responsibilities:

Worked as Site Engineer and direct reporting to Project Manager.

Review of project planning, monitoring & inspection of project civil & structural works for kiln chimneys at Saudi Cement Company Ainder plant.

Preparation of kiln jacket system and finding out structural cracks and air cracks, identification of delaminated concrete by hammer sound.

Structural cracks repair with WS60 injection and delaminated concrete repair with chipping, sand blasting & adding new steel if damages more then 20% and shot creating.

Monitoring & inspection of complete Civil and Structural work of Existing Power Plant, Completely replacement of foundations like Oil Circuit Breakers (OCB), transmition line foundations, bus bars, feeder foundations, cable tray foundation, gas turbine foundation,, Pipe /Cable Racks,RCC Control room / Electrical MCC Rooms

. Review & certification of contractor’s monthly invoices.

Inspection of construction joints before doing acid proof lining, and filling with WS 63 by injecting with packer rod.

Preparation of walls for acid proof lining and making inspection with client.

To prepare proper mix of Epoxy Ameron chemical material prior to application of acid proof lining as per manufacture recommendations.

Preparation of quantities, review of project drawings & progress.

To prepare measurements & invoices for payment certification by consultant.

March 1993 to Feb 1996 Worked with JNT University as a Cartografer at INDIA For Megalaya Land use & Development Project.

Responsibilities:

worked as Cartographer (Maps Preparation)

Co-ordination with PH.D candidates for their project works.

Interpreted NRSA satellite images to maps to know the land details.

Educational Qualifications-Technical :

Bachelor Of Civil Engineer- Completed in1993 with 2 division (59.5%) From Osmania University -Hyderabad-AP

Passport details: No.M5796150, Date of Issue:28th Jan ’2015, Place of Issue: Hyderabad, Valid upto 27th Jan 2025,

Languages Known: English, Hindi, Arabic basic; Soft Skills: M S Office (Word, Excel, PowerPoint), AutoCad-2005, MS Outlook.

HSE Courses Attended:Chola MS

Personal: Born on 21st day of Dec’1970, 47 years Age, Married, Living with Two kids 15 years & 11 years old.

Reference(s)

Mr. Vipul Kumar- Position: GM( Immediate Reporting); email: add0m5@r.postjobfree.com GSM 009***********

Mr.P.Srinivas - Position: Civil Enng.; email: add0m5@r.postjobfree.com GSM 009***********

Mr.Ramesh Babu – Civil Inspector; email: add0m5@r.postjobfree.com GSM +968-********

Mr.Maru – Advisor for Chem tech: email: add0m5@r.postjobfree.com, Mob:009***********

Driving license:Posses LMV driving license of UAE, Omani, Qatar and Indian, Valid up to 24/06/2021

Achievements:Best Employer award in CAIRN, Certified ISO 9001-2008Internal/Lead Auditor

Present Salary: 400 USD/ Day Rate, 6/3 week rotation job. Free Lodging & Boarding and 100% medical allowances.

Expected Salary: 750 USD/ Day Rate or 14000 USD / Monthly



Contact this candidate