Post Job Free
Sign in

Project Incharge Cement Plant

Location:
Camabatela, Cuanza Norte Province, Angola
Salary:
As per company Policy
Posted:
April 28, 2020

Contact this candidate

Resume:

till

Results-driven and dedicated with wide-ranging experience planning and leading operations & project. Track record devising, evaluating, and implementing continuous process improvements to minimize waste and reduce costs while maximizing quality and yield. Establish effective quality control and safety programs with cost efficiency and manpower planning, encouraging proactive participation across the manufacturing floor. Excellent communicator; success building cohesive teams focused on production goals, safety, and throughput. B.E. (Industrial Engineering) professional with >25 years of mixed rich experience (>13 Years in Plant O&M and 12 Years in Project Execution) in the field of Operation and Maintenance of Integrated Cement Plant, Project Management, Equipment Erection, Pre-Commissioning & Commissioning (Dry and Hot run). Presently working in Angola as Director Plant and in-charge for 1.5 MTPA Integrated Plant located in Sumbe site Luanda.

Summary of Skills

Ability to survive and excel in a constantly challenging environment

Skilled in team building and management

Well versed with safety and quality standards adopted in a plant

Proficient in the operation, repair, and maintenance of the most common machinery and equipment used in a plant

Passionate to succeed through hard work and dedication while learning new skills and techniques Key Skills in Operation and Maintenance techniques

Well conversant with the techniques of predictive and preventive Maintenance of plant equipments.

Ability to identifying areas of Bottlenecks / breakdowns proactively and having ability to take corrective steps to rectify the equipments through application of troubleshooting tools.

Devising and implementing checks and ensuring compliance of safe and sound technical practices for the smooth functioning of the plant with the aim of achieving zero mechanical failure.

Accurate Spare parts and resource planning according to planned job. Details of Work Experience

Since July’94 with ACC Limited

Worked in Lafarge Holcim ACC Limited, in Chattisgarh near Bhilai as Vice President/Director Project job of Jamul (9000 TPD plant) and Sindri (1.1 Million Tons Grinding Unit) since June’17. Before this position, I was the Quality Head of both the Projects and responsible for Fabrication, Construction, Erection, Commissioning and handing over to the Plant O&M team.

Before this, I was In-charge of full-fledged plant of 0.8 MTPA with 25 MW Power Plant. The Growth Path within the Company

1. Since April 2018 : Director Plant at Angola

2. Since March 2017: Vice President Projects

3. Since June 2016 : Plant In-charge in June 2016. Responsible for 0.8 MTPA Integrated plant (later on all 3 Nos.of Kilns had to stopped due to environmental Issue), 23 MW Power Plant, Packing house, Plant IR issues etc.

4. Year 2012 : Plant Head Operation/Project (Promoted in Sep’12) for ongoing integrated plant of 9000 TPD production with 1.1 MTPA Grinding capacity. 5. Year 2008 : Head – Regional Project (East Zone) in India after repatriation from Nigeria. 6. April’05 to Sep’2008 – Promoted as Project Manager in Nigeria in Year 2007 and responsible for 3500 TPD Integrated plant O&M and later on undertaken Project execution for another 3500 TPD brown field

7. Feb’00 –March’05 - Deputy Manager, at Wadi and Incharge of Reliability Center Maintenance of both Old & New Wadi Plant (3000 TPD & 10,000 TPD plant respectively) and Incharge of Cement Mill Section of New Wadi Plat.

8. Jul’94 – Jan’00 Asst. Manager at Wadi Cement Works (10,000 TPD) & had been deputed to Saudi (YCC Company) for short duration assignment. Ashok Kumar Mishra, Mobile: +244*********, +917********* (Only Whatsapp Call till 15th May’20), India

E-Mail: *********@*****.***

Job Responsibilities

Prime Focus after taken charge of 0.8 MTPA plant, towards improvement of Plant OEE as plant was commissioned in 1965.

2ndly Focussing on reduction of Variable, Fix, Thermal energy and Electrical Energy of the plant as a part of Major KPIs including keeping Safety on top most priority.

3rdly Focussing towards Team Culture building by people’s engagement, Housekeeping campaign to feel proud at working place.

Before this position, I worked as Plant Head Operation (Since Year 2012 to June 2016) Project, reporting to Cluster Head - Projects for Jamul unit and responsible for Construction, Erection and Commissioning of 9000 TPD Integrated Plant(Clinkering Plant) which we have done successfully and achieved NOP.

Project Equipment selection skill to get most reliable equipment to achieve smooth commissioning and fast stabilization of plant.

Comprehensive equipment Inspection plan before proceeding for Individual trial run & Group sequence trial, subsequently Cold & Hot commissioning, NOP and PG test successfully.

Stabilized plant within 3 months of Time except few exceptions at Reclaimer part

Skilful in executing cross functions activities, ensuring timely delivery of projects within cost parameters without compromising with Safety & Quality which is our Project’s main tag line.

Mitigation plan to expedite the Project and normalise critical path activities by proper resource balancing.

Co-ordination with Internal and external agency related with all technical matters and decision making.

Reviewing for 3days, 3 months and 6 months look ahead schedule with resources deployment plan.

Follow up the schedule with daily coordination meeting and reporting to the top management.

Expertise in Cement Plant Operation and Maintenance functions specially in reducing breakdown / downtime & enhancing operational reliability (i.e.PRI and MTBF) of equipment by establishing reliable and workable systems.

Diligent communicator with strong relationship management, leadership skills & multi-tasking abilities.

Ability to create excellent working culture by boosting SFAs. Key Deliverables (Since Year 2005)

Duration Major Assignment

April 2005 to Sep 2008 Executed Project of Integrated Cement Plant 3500x2 TPD plant in Nigeria

(Reporting to vice President)

Oct 2008 to Sep 2009 Independently Executed Coal Washery Project 120 TPH (As a Regional Project Head)

Oct 2009 to Dec2010 Independently Executed and commissioned Bargarh Integrated Plant which includes 3500 TPD Kiln and Cement Grinding VRM (As a Regional Project Head) Jan2011 to 2012 Associated with 9000 TPD Integrated plant to see the tendering process, equipment selection and circuit diagram etc. (As a Regional Project Head) Dec 2012 to May 2016 Associated with 9000 TOD Integrated plant as Quality Head of Project and was responsible for Construction, Fabrication, Erection, Commissioning and handing over project to operation team. (As a Sr.G.M / Pant Head Operation profile) June 2016 to March’17 Taken Charge of old plant as a Director Plant and looking for 0.8 MTPA Integrated unit with (Coal Grinding unit, Slag Dryer unit part of grinding unit), 25 MW Power Plant and full-fledged Packing plant etc. Later on old plant all 3 kilns stopped due to environmental Issues.

March’17 to March’18 Vice President Projects

April’18 to as of now Resigned from ACC Cement as Vice President Projects and joined FCKS

(Client) Operating Cement Plant (1.5 MTPA Integrated plant) in Angola as Director Plant and reporting to MD of our Company Cemvision based at Dubai.

Notable Milestones achieved on Maintenance Front (Plant Operation & Maintenance)

Attained maximum running days 29 Days of Cement Mill.

Achieved 340 running Days of 10,000 TPD Kiln with proper predictive maintenance and resource planning concept and adoption of Best Practices and Solver techniques.

Implemented standardization concept by covering “V”belt, Gear Box, Lubricants etc to minimize Inventory.

Developed best practices in the plant to reduce maintenance time and Cost.

Minimised breakdown by almost 90% by precise adoption of condition monitoring system and improved OEE to 92% and MTBF >40%.

Successfully contributed on completion of the project as a Commissioning Head in ACC, Bargarh, Orissa across the east region.

Executed 2 integrated cement plant (3500 TPD) in Nigeria with the capacity of Project Manager.

Commissioned an integrated cement plant of ACC (3500 TPD) with the capacity of Head- Commissioning.

Rehabilitated Old Cement Integrated Plant and Operated consistently and then started erection & commissioning of new plant and handing over Cement Plant Project (Brown Field) to client M/s-Dangote Industry in Nigeria.

Handled Operation and Maintenance of Kiln, Cement Mill, Roller Press and Condition monitoring department at ACC Wadi Cement Plant (10,000 TPD Integrated Plant)

Conducted time study in various departments and recommended the area for improvement, equipment standardization at component level and apprising to top management for potential savings.

Managed through time study, reduced the overall running hrs of Lime stone crusher by Shift as well as enhanced manpower productivity by 30% through time study method. Major Role & Responsibility (During Project Execution of 9000 TPD Integrated plant)

Material quality control is strictly monitored by approved QAP/FQP (Field Quality Plan).

Responsible for managing all aspects related to the operations and for the successful delivery of projects as per standard processes and as laid down playbooks.

Responsible for managing a team of internal or external project management professionals.

Able to develop operational plans, project schedules and goals that achieve overall operational efficiency.

Enforce implementation of internal and client driven processes and protocols on project.

Monitor the overall project requirements to ensure successful delivery at stake holders satisfaction.

Assemble, lead, and manage a team of internal and external professionals.

Inspect projects to ensure conformance in accordance with contract.

Track progress of projects against goals, objectives, timelines, and budgets, and review the reports on risk status and mitigation plan.

Monitor expenses to ensure that they fall within the prescribed budget.

Manage project team by providing direction and leadership.

Undertake regular contractor’s meetings as per formal calendar regarding project matters, value additions.

Work closely with other functional areas of the organization, project contractors, internal team members, external collaborators, prime contractors and suppliers.

Provide a periodic update of the service delivery of the assigned projects and propose methods to strengthen the same in case of any deficiencies.

Manage a work unit and/or group. Responsible for identifying training needs, tracking performance, coaching, and motivating direct reports. Assist in hiring, terminating, compensation, and performance evaluation.

Payment tracking / recovery.

Performed erection & commissioning of following Cement Plant Equipments:

Lime Stone Crusher, L&T Make, 800 TPH with Thermic Fluid Heating System Arrangement for 4 Months at Nigeria.

Lime Stone Crusher (Impactor) L&T Make 1650 TPH erected and commissioned in ongoing 9000 TPD plant at Jamul Expansion Project.

Commissioned complete Pyro section in ongoing 9000 TPD plant at Jamul Expansion Project and Proceeding towards commissioning of Cement grinding and Packing.

Trouble shooting of Loesche Coal Mill (VRM@90 TPH)

Commissioned 2.5 KM Belt Conveyor in ongoing 9000 TPD plant at Jamul Expansion Project.

Rehabilitation Job of Lime Stone Rotary Stacker and Reclaimer for 5 Months at Nigeria.

Raw meal VRM, Loesche Make, 350 TPH (1 No.) for 8 Months at Nigeria.

Clinker Cooler, Pendulam Cooler, IKN Germany Make (2 Nos.) for 4 Months at Nigeria.

Kiln Shell, Girth Gear Replacement and Main Drive Replacement 2 Kilns, KHD Make, 3500 TPD (2 Nos.) for 6 months each at Nigeria.

Cement Mill, FLSmidth Make, 125 TPH (2 Nos.) for 10 Months at Nigeria.

Misc. Material Handling Equipment like Belt Bucket Elevator (Aumund/Enexo), Deep Pan Conveyor

(Aumund/Enexo), Chain Conveyor (FLSmidth), Fans, Belt Conveyors (Macmet/Enexo), PUG Blender, Vibrating screen, Vibrofeeder, Coal Crusher, Magnetic Separator, Air Slides, Dust Collectors, etc. At Nigeria and ACC (Bargarh Cement in Orissa), ACC Jamul Cement in Chattisgarh. Foreign Assignments & Exposure

Distinction of been to:

Saudi Arab for implementation of Computerized Maintenance System (Assignment duration was 6 Months, Year 1998).

Nigeria for the plant rehabilitation, Maintenance and execution of Project for Client - M/s Dangote Industries for around 3.5 years from Apr’05 - Jun’08. Plant capacity was 3500 TPD x 2 (Integrated plant)

Presently working in Angola as Director plant and in charge of 1.5 MTPA Integrated Plant Personal Snippet

Date of Birth : 1st July, 1966.

Marital Status : Married

Address : 137A/17B, Rajrooppur,P.O.-Rajrooppur, Allahabad (UP) 211011 Linguistic Abilities : English, Hindi & understand Bengali & Marathi (to some extent) Passport Details : J 9793622 (Valid up to 21st March’2022) Notice Period : 3 Months

Skype ID : ashok.mishra780

Local Direct contact Number : +244*********

Contact number (Whatsapp) : +917********* till 15th May’20

Scholastics

B.E. (Industrial Engineering) from Sri Ramdeo Baba Kamla Nehru Engineering College, Nagpur in 1991-92.

Software Skills: Well versed with MS Excel, MS Word, PowerPoint, Microsoft Project Planner, Primavera etc.

References

1. Manoj Kumar Jha, Unit Head of Prism Cement, 958-***-**** / 958-***-**** 2. Kuldeep Lala, Construction Expert, 834-***-****

I, hereby, declare that the information provided by me are true to the best of my knowledge. Place : Bhilai, Chhatisgarh. India.



Contact this candidate