JOHN F HORN, P.E (*-****)

Mobile: 863-***-**** Email: adcz0r@r.postjobfree.com

PROFILE

An accomplished project professional, experienced in Project Management, Construction, and Engineering Management. Experience in new capital construction, facility expansions, renovations, and backfits. A comprehensive background in management of multi-hundred-million-dollar budgets and schedules of process industries, agri-chemicals, waste to energy, power generation,petro-chemical, and oil/gas projects. Strong written and verbal communications with solid problem solving and decision-making abilities. Team player and team builder/leader. Affirmative action, management, and safe working conditions advocate.

CORE COMPETENCIES

Project Management Construction Management

Engineering/Design Team Leadership

Contract Management WBS/Cost/Schedule Development

RFP Development Bid Evaluations

EHS Practices Quality Control/ NDE

PROFESSIONAL EXPERIENCE

AECOM HUNT, St. Louis, MO ( Contract, Nestle Purina Pet Care) 11/2019 – 4/2020

Mechanical Construction Superintendent – Managed contractor(s) installing a pet food processing facility. Including responsibilities for BIM review, GMP procedures, structural steel, and piping and mechanical equipment setting, electrical installation, HVAC and instrumentation. Responded to contractor generated RFI’s, EWO’s, reviewed schedules for completion dates. Delivery and logistics analysis, receipt inspections of client purchased equipment. Assumed Construction Manager responsibility during the incumbents absence. Start up and commissioning activities.

ESG International Inc. Toano, VA (Contract Position, Duke-Energy) 3/ 2017-12/2018

Field Project Mechanical Engineer – Review of Engineer of Record drawings, specifications, calculations, permit applications. Preparation of contracting documents including supporting/reference documents, contractor bid proposal evaluations. Product and process use evaluations and recommendations. Managed building erection, process equipment installation, piping design and installation, electrical installations, HVAC. Delivery and logistics analysis, receipt inspections, installation advisor. Contractor safety monitoring, Start up and commissioning completion activities, vendor start-up support, scheduling and engineering start-up support. Project schedule inputs, field corrective engineering designs, quality inspections and reports. Project red-line drawing completion.

Defined Sources Cooperative, Charleston, SC (Contract Position, Enviva) 1/2016 - 8/2016 Site Project Construction Manager - Project is a rail and truck receiving, transfer, storage and ocean shipping facility for wood pellets. Responsible for engineering, procurement, construction, sub-contract administration, safety, security, staffing supervision and levels, payment schedules and approvals. Accountable for cost and schedule changes and control. Position required interface with state, federal, and port authority agencies to obtain approvals and project assistance. Management of multiple reimbursable sub-contractors in several different disciplines, and major general contractors with furnish and erect contracts.

JOHN F. HORN (4-2020) PAGE 2

Lockheed Martin-Mission Systems & Training, Moorestown, NJ 6/2014 – 7/2015

Program Manager – 5MW Biomass Project – Herten, Germany

Overall project responsibility for a First of a Kind, Gasification Technology being used under licensing agreements from client. Accountable for project proposal and negotiations which lead to an executed EPC contract. Responsibility included delivery of schedule and cost sensitive engineering deliverables, equipment and services (mostly international suppliers), domestic procurement, construction (foreign General Contractor) and startup/commissioning/turnover.

Worleyparsons Canada Services LTD (COSYN), Edmonton, Alberta, Canada 3/2012 – 7/2014

Senior Project Manager - Major Projects overall responsibility for a $170MM Oil Sands project at the Ft. MacMurray, Alberta, Canada facility. Responsibility included completion and closeout of Front End Engineering Design (FEED), kickoff of STAGE 4 Detailed engineering, and Integration of portions of the engineering into a Work Share Order with HVE (High Value Engineering) office in China. First company project with work share using an HVE. Developed and managed the PEP (Project Execution Plan) and Assisted with HRSG and structural steel design input. Ensured both client and Cosyn contract policies and procedures were utilized. Reviewed and approved shop drawings, final design documents, and issued for construction documents (IFC). Provided power industry input to the project design. Responsible for budget development and control as well as the TIC (Total Installed Cost) estimate. Project Schedule development including a portion for the work share partners activities. Helped host the China delegation’s visit to COSYN. Developed and customized the WEP (Workshare Execution Plan) as well as a template for the Work Release Packages (WRP’s) to be used in controlling and monitoring the Work share partner’s portion of the project with HVE. Conducted presentations to the client for the monthly Portfolio of Project updates. Interfaced with the client’s Project Managers for day to day project concerns. Maintained seamless communications with all project team members as well as primary stakeholders with the client and COSYN. Approved any project change notices. Maintained responsibilities for Project Controls reporting.

Fire Protection Refurbish/upgrade Project

Additionally, responsible for the Design Basis Document, Detailed Engineering Deliverables, Procurement, Quality and Construction Work Packages for a two unit Coker Fire Protection System. Approved all expenditures/charges for procurement, construction and engineering managed a remote fire protection office design.

Also served as Project Manager including interfacing with client’s third-party contractor on a major Co-Generation/Dredging project being installed at the Ft. MacMurray, Alberta oil sands facility. Responsibilities included coordinating the clients archive retrieval of document packages for the third-party contractor and the design by COSYN. Hosted a Kick-off meeting with the third party contractor and developed procedures to cover engineering, quality, document control, billing and reporting. Developed and managed PEP (Project Execution Plan), and WEP (Work Execution Plan).

WSI Management LLC; Insultech Group INC; CAL-TECH INC 6/ 2003 – 2/2012

Vice President Engineering and Construction

Led this startup company from inception through the design process to reach ready-for-market status. Directed the R&D operation, design, and engineering for the proprietary patented process. Ensured viability through third-party engineers, and liaisons with domestic and international government agencies, clients, and partnering firms to market the technology and facility. Collaborates with other stakeholders to identify and develop equity and debt financing to support product launch.

Led an R&D design improvement that substantially improved product efficiency and financial viability.

Presented and won initial acceptance of the technology from a State Environmental Protection Agency.

Insultech Group Plant Services Divisions, including construction, predictive maintenance services, client staff augmentation, contract/specialized personnel, and engineering/design services. Managed P&L of four divisions totaling $16M annually and a service area across the Southeastern US. Conducted division cost analyses and market projections to establish budgets. Managed six direct reports and non-field personnel; conducted annual personnel reviews to ensure maximum performance. Achieved savings of $150K in Workers Compensation premiums by implementation of an enterprise-wide safety program .Successfully improve construction cost by 8-10% through use of new, innovative and superior construction materials and tools. Identified and secured improved supply chain of material suppliers, including insulation, laminated cabinet coverings, plywood, marine interior products, engineered products, piping, electrical supplies, specialty equipment and metal jacketing.

Pennsylvania Power & Light, Allentown, PA Site Project Construction Manager (Contract Position with Bonus)

Assumed overall project responsibility for remaining 40% of a $465MM, 600 MW CCPP. Project consisted of 2- Siemens Gas Turbines and steam turbine, Vogt HRSGs and related equipment. Interfaced with the on-site Siemens representatives regarding progress and issues with their equipment. Directly supervised the GC and steel erection contractors. Successfully turned project from a potential financial loss to a no cost budget increase with minimal schedule delay, to a cost breakeven with minimal schedule delay. Ensured that safety and quality standards were enforced. Negotiated contractor claims from 10MM to 2.5MM.

JOHN F. HORN (4-2020) PAGE 3

Project Site Construction Manager (Contract Position with Bonus) Sundance, Casa Grande, AZ

Oversaw 490MW peaking project, consisting of a 10—unit simple cycle gas turbine power plant with water injection. Project also consisted of environmental waste water evaporation ponds, canal system for water supply and water treatment. Controlled a $75MM direct budget, indirectly managed a budget of $265MM.

Project completed 45 days ahead of schedule and $6MM under budget.

Controlled contractor’s incentive bonuses.

Siemens Westinghouse Power Corporation, Orlando, FL

Site Construction Manager

Site Manager for a 2X1 and Single Shaft Combined Cycle plant in Kingman, Arizona. Acted as project engineering manager until permanent candidate selected. Directed the long-term storage of equipment when project was delayed.

Site Construction Manager

Directed construction, field engineering and commissioning/startup of 2-250MW, Siemens Single Shaft Combined Cycle Gas/Steam Turbine Power Plant, 2 HRSGs and 2 steam turbines, cooling towers and switchyard. in Campbell, MO. Accountable for labor time charges, commodity purchases, subcontract solicitation, evaluation, award and management. Managed the project safety program, project security program, document control, commissioning/startup. Facility was POWER MAGAZINES’ PLANT of the YEAR award. Fiscal responsibility: Direct- $75MM-- Indirect-$327MM.

Negotiated project agreement with building trades local union

Hosted and conducted monthly project board meetings

Project Construction Manager (Contract Position)

Directed construction of the “World’s Largest” simple cycle Siemens Westinghouse gas turbine, 501G, advanced technology Power Plant, complete with steam turbine, structural steel erection and E&IC installation, Lakeland, FL. Accountable for all construction work, schedule, startup support, engineering changes, craft labor levels, and sub-contract administration.

ADDITIONAL PROFESSIONAL EXPERIENCE

Power Industry Consultants, Inc., Siemens-Pakistan Ltd., Erlangen, Germany

Claims Manager (Contract Position) - 415 MW COMBINED CYCLE PROJECT, Guddu, Pakistan

Conducted negotiations with client settling claims for engineering, construction and schedule deficiencies and provided contract administration expertise. Translated technical documents from German into English.

Raytheon Engineers & Constructors, Beaumont, TX & Dominican Republic

Project Superintendent / Senior Resident Engineer

Led 90 professional, supervisory, clerical, and craft personnel during a barge-mounted power plant project (GE 7A)

Agrico Chemical Co, Tulsa, Oklahoma/Mulberry,Florida

Project Engineer-, 175,000 TPY P2O5 facility and slurrry system including dragline, dredge pump slurry line, 13.8kv transmisión line, first UCEGO P2O5 continuous filter in USA.

Pilot plant for research into utilizing Gypsum waste for acid recovery and roadbed material

Ebasco Constructors Inc., Santa Ana, CA/Clinton, NJ

Senior Resident Engineer/Site Manager - 180MW CO-GENERATION PLANT, BELLINGHAM, WASHINGTON

Senior Resident Engineer - 5OMW COMBINED CYCLE PLANT, MODESTO, CALIFORNIA

oNegotiated client claims down to $425K

Systems completion supervisor, 2-800MW nuclear units

Senior Electrical Engineer - 2 PROJECTS 160MW CC / 210MW PEAKING LAS VEGAS, NEVADA

Supervised staff and provided technical and quality support to the project. Performed document reviews, vendor approvals, approved craft labor timesheets, field change authorizations, and bid evaluations. Electrical Superintendent for five months.

Florida Power & Light, Miami, FL

Assistant Plant Superintendent -two 450MW units

Boiler Construction Superintendent – 2-750 MW units

Plant Engineer – 2-400 MW units

Start-up Engineer—2-650 MW nuclear units

JOHN F HORN ( 4-2020) PAGE 4

EDUCATION and AFFILIATIONS

BSME - Mechanical Engineering (Heat Transfer/Fluid Flow

MBA – Management and Finance

Professional Engineer: Florida, Louisiana, New Jersey, North Carolina, South Carolina, and Virginia.

Professional Affiliations: ASME • ISA • NCEES

Technologies: MS Office Suite, MS Project, BIMS, AutoCAD, Visio, Delta CAD, Primavera(P6),