Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Iran
Posted:
April 26, 2020

Contact this candidate

Resume:

© European Union, ****-**** europass.cedefop.europa.eu Page 1 / 6

PERSONAL INFORMATION HAMID ESHAGHI

****, ******** *,**********,******** RAZAVE,post code:931-***-****,IRAN

+985********* +989*********

adcypb@r.postjobfree.com

LinkedIn: HAMID ESAGHE Whatsapp:009***********

Instagram:HAMID.E3273 facebook:HAMID.ESAGHE

Sex male Date of birth 23/02/1979 IRAN

WORK EXPERIENCE

JOB APPLIED FOR

Electrical Power, Instrumentation, Automation,Thermal and Refrigeration Installations

,HVAC&R, Fire Fightting systems, Cathodic Protection systems FROM 1 Sep 2002 UP TODAY

Electrical and Instrumentation Engineer

Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Erection,Commissioning,maintenance and repair of electrical and instrumentation (equipments and industrial machineries)

Inspection of electrical equipment during installation for quality and quantity of installation according to manufacturer's recommendation.

Business or sector : steelmaking,roolling mill, direct reduction and palletizing plants Accomplishments Updating of technical documentation and execution plans in the process of installation of electrical equipment. Provide alternative designs when installing electrical equipment to increase production efficiency and reduce maintenance costs.

Design and implementation of power distribution panels and equipment control panels using P.L.C step5- step7(200/300/1200) -Delta-Fateck facon and monitoring(H.M.I) Analyse of electrical equipment thermography images and planning to repair defective parts Using advanced methods to troubleshooting electrical equipmenttrol panels using FROM 12 JUL2010 UP TODAY

HVAC&R,Refrigeration and Thermal systems Engineer( Erection &Commissioning and Maintenance) Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Planningg, maintenance and repair of steam boilers and it’s equipments, chiller and refrigerant control systems

Repair semi-hermetic compressor,troubleshooting refrigeration systems Business or sector : technical support installations in Khorasan steel complex Curriculum Vitae Replace with First name(s) Surname(s)

© European Union, 2002-2015 europass.cedefop.europa.eu Page 2 / 6 Accomplishments

Improving cooling efficiency in refrigeration equipment by adjusting gas pressure and gas type at ambient temperature and exchange rate with ambient improving cooling efficiency in refrigeration equipment by adjusting gas pressure and gas type at ambient temperature and exchange rate with ambient

Investigation of design calculations of refrigeration system suppliers and measurement of refrigerant load

Replacement of ozone depleting gases and use of environmentally friendly gases according to related standards

Maintenance and use of refrigerant gas collector based on standard to protect ozone layer

Design Change in Compressed Air Refrigeration Dryers for Performance and Third Winner of Khorasan Steel Selected Projects Improving Cooling Efficiency in Refrigeration Equipment by Adjusting Gas Pressure and Gas Type at Ambient Temperature and Exchange Rate with Ambient

Investigation of design calculations of refrigeration system suppliers and measurement of refrigerant load

Replacement of ozone depleting gases and use of environmentally friendly gases according to standard

Maintenance and Use of Refrigerant Gas Collector Based on Standard to Protect Ozone Layer

Design Change in Compressed Air Refrigeration Drivers in Function and Third Winner of Khorasan Steel

Design of Refrigeration Control Panels Using Electronic Expansions and Monitoring

Optimization of burners and boilers by the method of adjusting fuel and air and using smart sensors FROM 10 DEC 2009 UP TO DAY

Cathodic Protection Systems Inspector ( Erection &Commissioning and Maintenance) Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Planning and maintenance of under ground pipes and anode bed networks cathodic protection systems

Business or sector technical support installations in Khorasan steel complex Accomplishments

Conduct corrosion tests annually DCVG test and monitor it Correction of insulation of pipe in faulty areas

Necessary calculations for expansion of underground pipes with cathodic protection Perform potential tests ON/OFF and measure current ANODS Vivify ANODS according to current

FROM 10 DEC 2009 UP TO DAY

Fire Fightting Systems Inspector ( Erection &Commissioning and Maintenance) Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Planning, maintenance fire alarm detector(gas,smoke heat), control systems and fire fightting auto extinguishing (water,water&foame,CO2,foame)

Business or sector technical support installations and fire station in Khorasan steel complex Accomplishments

Evaluation of high risk areas and providing fire alarm and fire extinguishing instructions for fire brigade personnel and personnel based on fire alarm system standard and fire alarm monitoring system Use appropriate and authorized extinguishers where necessary to separate equipment type Investigate and control the logic of the fire alarm program according to the importance of standard and installed equipment

Design of fire alarm system in raw material warehouses by type of spare parts and storage conditions

© European Union, 2002-2015 europass.cedefop.europa.eu Page 3 / 6 FROM 31 dec2007 UP TODAY

SUPERINTEND OF THE PROTECTIVE PLAN UNIT FIRE FIGHTTING - CATHODIC PROTECTION- HVAC&R

Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Head of maintenance department, accordance with technacian maintenance Business or sector technical support installations in Khorasan steel complex Accomplishments Planning and controlling system repair processes PM-TPM Provides repair instructions according to manufacturing process and expedited repair time Planning for repairs based on equipment operation hours FROM 15 jun2012 UP TO DAY

Advisor on troubleshooting of refrigeration and boiler steam system Different industrial company (food-dairying-forgery and…) industrial place in Neyshaboor

Advisor in solve problems

Business or sector offer for solve problems and preventive problems Accomplishments Designing a network of suppliers of goods with different industries to exchange technical information and identify suppliers of spare parts

Providing maintenance services to other similar factories Providing training services to technical personnel for equipment maintenance FROM 5 OCT 2015 UP TO DAY

Teaching electrical work shop

Sama neyshaboor-paghohesh b.l.v www.sama-neyshabur.ac.ir

Teaching industrial electrical work shop

Business or sector electrical distribution-instrument-plc-general electric Accomplishments Training of technical forces with applied electrical training for students FROM 20DEC 2016 UP TO DAY

Herco refrigerant system maintenance

No.3, 15

th

St,Ashrafi esfahani Ave,Tehran-IRAN www.mekitco.com www.herco-gmbh.com

Maintenance and analysis refrigerant seal gas

Business or sector regulation brine temperature –service compressor bricut steel plant SABA Bandar abbas and Khorasan steel complex

FROM 20FEB 2015 UP TO DAY

SERVICE AND INSTALLATION OF N2 ANALYZER DRYER BUHLER AND REFRIGRATION AIR DRYER Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Planning and maintenance air dryer and take a reward optimum and placemen equipment. Business or sector Air dryer use for equipment instrumentation and analyser gas in control system. FROM 12 JUL2010 UP TO DAY

SUPERVISOR OF ERECTION AND COMMISSIONING HVAC&R

Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Consider documents design and erection &commissioning-Inspection in the days of erection

&commissioning

Business or sector Responsibility delivery whole equipment companys(sabalan-tahveh-omrantahveh….) Accomplishments Identify and supply essential components and evaluate the use of lower cost and higher performance replacement parts

Inspection of parts at the time of purchase

Curriculum Vitae Replace with First name(s) Surname(s)

© European Union, 2002-2015 europass.cedefop.europa.eu Page 4 / 6 EDUCATION AND TRAINING

FROM 15 DEC 2011 TO 2013

SUPERVISOR OF ERECTION AND COMMISSIONING FIRE ALARM &FIRE FIGHTTING Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Consider documents design and erection &commissioning-Inspection in the days of erection &commissioning Business or sector Consider documents design and erection &commissioning-Inspection in the days of erection

&commissioning (narfomkar-sanco Italy-atraban….)

FROM 10NOW 2010 TO 2012

SUPERVISOR OF ERECTION AND COMMISSIONING CATHODIC PROTECTION Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Consider documents design and erection &commissioning-Inspection in the days of erection

&commissioning

Business or sector Consider documents design and erection &commissioning-Inspection in the days of erection

&commissioning(Refrans IRAN Co-Bona Electric)www.refransiran.com-www.borna-co.com FROM 10MAY 2008 TO 2012

Calibration equipment instruments(pressure-temperature) Khorasan Steel Complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor

,Iran,www.khorasansteel.com

Repair and calibration sensors (analog-digital) pressure &temperature with consider standard Business or sector calibration and installation sensors in industrial process Accomplishments Planning for calibration of equipment affecting production and energy quality Control on installation of instrumentation equipment and operating conditions FROM 23 SEP 2005 TO 10 DEC 2007

BSc, Electrical power Engineer

Azad university Gonabad

Analyse of faults occurred in power systems, design and assemble of industrial power distribution cabinet, motor control system programming and installation plc,drive FROM 22 SEP 1996 TO 7 MAR 1999

Associate Electrotecnic

Mashhad (Shahid Mohammad Montazeri) Technical School (Aff.with the Min. Of Training and Education)IRAN

Electrical distribution design

FROM 23 SEP 1993 TO 10 SEP 1996

Diploma Industrial electric school of Shariati Technical high school neyshaboor

Industrial scool of Shariati neyshaboor

Education basic electric and field work

FROM 21 FEB 2017 TO 26 FEB 2017

Cathodic protection level I&II

NO.11-Behbahan Alley-Moussavi St-Ferdosi Sq.Enghelab Ave- Tehran-Iran www.ica.ir

Inspection and repair cathodic protection

FROM 5 MAR 2015 TO 6 MAR 2015

Fire Alarm system

NO.5 Bagh Angori Alley-South Khayam St. Mohammadiya Sq. Tehran- Iran www.wikifire.ir

Fire Alarm System Design,Installa on,Commissioning and Service&Maintenance FROM 28 DEC 2012 TO 29 DEC 2012

CAREEAR HVAC Software

Industrial Reserch& Training Center of Iran

Work shop Careear Soft ware HVAC

FROM 13 MAY 2012 TO 14 MAY 2012

Maintenance and Repair HVAC&R

Industrial Reserch& Training Center of Iran

Workshop Maintenance and Repair HVAC&R-test compressor –expantion valve –Gaz test FROM 27 JUN 2010 TO 27 JUN 2010

Maintenance and Repair PLC S7-S5

Khorasan Steel complex Company-Km15,Neyshaboor to Firoze Road,P.O.BOX:488,Neyshaboor,Iran WWW.KHORASAN STEEL .COM

Workshop Maintenance and Repair PLC

© European Union, 2002-2015 europass.cedefop.europa.eu Page 5 / 6 PERSONAL SKILLS

FROM 7 FEB 2009 TO 10 FEB 2009

Advance Instrumentation

NIAZ WARE .CO

Teaching Instrumentation sensor and Installation FROM 22 FEB 2008 TO 25 FEB 2008

Electrical Equipment Troubleshooting

NIAZ WARE .CO

Teaching Electrical Equipment Troubleshooting

FROM 6 AUG 2006 TO 6 AUG 2006

Basis of Thermometry and ITS90

Arvin system Engineering &Calibration Services Company -Iran

Teaching temperature standard Instrumentation

FROM 7 AUG 2006 TO 7 AUG 2006

Calibrating of Thermocouples

Arvin system Engineering &Calibration Services Company -Iran

Workshop Calibrating Thermocouples

FROM 8 AUG 2006 TO 8 AUG 2006

Calibrating of Resistance Thermometers

Arvin system Engineering &Calibration Services Company -Iran

Workshop Calibrating Resistance Thermometers

FROM 20 AUG 2006 TO 27 AUG 2006

Cathodic Protection Design of underground Pipelines NO.11-Behbahan Alley-Moussavi St-Ferdosi Sq.Enghelab Ave- Tehran-Iran www.ica.ir

Replace with a list of principal subjects covered or skills acquired Mother tongue(s) PERSIAN

Other language(s) UNDERSTANDING SPEAKING WRITING

Listening Reading Spoken interaction Spoken production ENGLISH B2 B1 B1 B1 B1

B1 B1 B1 B1

B1 B1 B1

B1 B1

B1

Replace with name of language certificate. Enter level if known. Deutsch A2 A2 A2 A2 A2

Replace with name of language certificate. Enter level if known. Levels: A1/A2: Basic user - B1/B2: Independent user - C1/C2 Proficient user Common European Framework of Reference for Languages Communication skills My interpersonal skills include a great ability to motivate others, develop rapport with coworkers, and resolve conflicts, strong problem-solving, an ability to inspire trust gained through my experience as Senior engineer.

Organisational / managerial skills ting and meeting goals, managing appointments, team management, project management, making schedules, coordinating events, productivity, teamwork, team leadership, multitasking, strategic thinking, implementing strategy gained through my experience in current position as Master engineer. documentation, identifying problems, developmental planning, public speaking, reviewing-reporting-and research, attention to detail, making presentations gained through my experience in current position as Master engineer.

experience in current position as Master engineer. Curriculum Vitae Replace with First name(s) Surname(s)

© European Union, 2002-2015 europass.cedefop.europa.eu Page 6 / 6 ADDITIONAL INFORMATION

Job-related skills

ability to development of its structure. Familiar with the RCFA(Root Cause Failure Analysis) method and ability to development of its structure. Familiar with the FMEA(Failure Mode Effects Analysis) method and ability to development of its structure.

Maintenance..

fighting and some of other type and manufacturers and Maintenance. Digital competence SELF-ASSESSMENT

Information

processing

Communication

Content

creation

Safety

Problem

solving

INDEPENDENT USER

INDEPENDENT USER

INDEPENDENT USER

INDEPENDENT USER

INDEPENDENT USER

Levels: Basic user - Independent user - Proficient user Digital competences - Self-assessment grid

Replace with name of ICT-certificate(s)

Autodesk Autocad, Eplan, PLC Step7, LOGO!, Esser software,NSC software Other skills m Dec 1999 to Dec 2017)

Design and construction of low voltage and low pressure distribution boards and automation control boards

Design and implementation of fire extinguishing systems and cathodic burglar protection systems See with software and technical analysis charts of capital markets Driving licence B2

Publications

Presentations

Projects

Conferences

Seminars

Honours and awards

Memberships

References

Citations

Courses

Certifications

Practicing lessons and Electrical Instrument Workshop at Sama Neyshabour Technical College

Training on maintenance of electrical and thermal equipment and refrigeration at dairy and oil refineries

Advice on buying and installing industrial machinery for dairy and oiling plants

Training on installing cryogenic and thermal systems for fire extinguishing systems in the Khorasan steel burial cathodic tubes



Contact this candidate