Post Job Free

Resume

Sign in

Safety Engineer

Location:
Ado Ekiti, Ekiti State, Nigeria
Posted:
April 26, 2020

Contact this candidate

Resume:

ESHO SUNDAY TEMITAYO

E-mail Address: adcyp7@r.postjobfree.com

Mobile Nos: (234) 811-***-****, (234) 803-***-****,

Contact Address: Ajibose’s house, Apata, Ibadan, Oyo State, Nigeria.

Career Objectives: To eliminate fatality, prevent accident, reduce events and promote a good health and safety culture within my organization

Academic Information

2001-2008 Ladoke Akintola University of Technology, Ogbomoso, Oyo state

(B-tech) Mechanical Engineering (Second Class Division)

1994-2000 Osun State Unity School, Ikire, Osun State

Senior School Certificate Examination (SSCE)

1987-1994 Sacred Heart Private School, Ring Road

First School Leaving Certificate (FSLC)

Professional qualifications/competencies

NEBOSH International Diploma (00392611)

Certified to QMS 9001:2015 Lead Auditor Standard

Certified to OHSAS 18001 Lead Auditor Standard

NEBOSH IGC Certificate(00255213/644836)

Health, Safety and Environment Course (Level 3)

General Health, Safety and Environment Course (GHSE)

First Aid at Work Course (NIGERIAN RED CROSS SOCIETY)

International Well control IWCF(Level 1 Programme)

OSHA Standard based Hazard Communication (HAZCOM) course

Work At Height (CRESENT)

Mobile Ladder Safety (American Ladder Institute)

Single and Extension Ladder Safety (American Ladder Institute)

Step Ladder Safety (American Ladder Institute)

Articulated Ladder Safety (American Ladder Institute)

Member Institute of Safety Professional of Nigeria (ISPON):6334

Project Management Professional (PMP) in view (2019)

Basic Certificate in Entrepreneurship

Key Skills, Attributes and Professional Membership

Behavioral Safety

Proactive approach to H&S

Hazard Identification and risk control

Environmental awareness

Motivational, Communication and Supervisory Skills

Computer literate, Experienced in full reporting using software

Competent with the use of AutoCAD application

Work Experience

2015-till date Hybrid Consulting Limited, Ikeja Lagos

Position Occupied: HSE Supervisor to NBC (Nigeria Bottling Company) Construction and Installation Projects

Task 1: Liaise between client, contractors and others on all matters relating to health,

safety and environment to ensure consistent application and understanding of

policies and procedures

Task 2: Communicate and implement Health, Safety and Environment policies in the project sites

Task 3: Advise on OHS trend and indicators

Task 4: Develop programs and plans to achieve OHS objectives

Task 5: Provide direction, technical guidance on Health and Safety practices

Task 6: Conduct HSE audits as required, identify opportunities for continuous improvements while also providing cost effective solutions to ensure continuous improvements

Task 7: Prepare projects for annual third party audits

Task 8 Supporting and monitoring HSE improvement proposal stating the non conformance, proposed corrective action, required resources for corrective action and plan of implantation

Task 8: Developing, inspecting, monitoring and enforcing corporate safety and health policies and procedures

Task 10: Prepare weekly HSE reports to the project management ream

Task 11: Planning and conducting HSE meetings with contractors representative and

client

Task 12: Keep staff and managers abreast of changes in HSE Legislation and codes of

practice

Task 13: Follows up to ensure that corrective actions are implemented where necessary and ensures that any certification requirements are complied with audit work

being performed with ‘Safe Work Permit

Task 14: Assist with the implementation of Job Safety Analysis and inspect job site activities during particularly difficult or hazardous work situations

Task 15: Coordinate and participate in the investigation of accidents and near misses

whenever required

Task 16: Ensure participation in regular emergency response exercises and drills that are conducted to ensure the highest level of preparedness in any emergency

Task 17: Assist in developing and implementing field location emergency response

procedures and evacuation plans

Task 18: Investigate the root cause of HSE complaint put forward by staff members, customers, client and contractors

Achievements 1:

1.Led HSE team to achieve 1.9+ MILLION Man hours without LTI(2015-2917)

2.Reduced overall accident rate by 80% through implementation of effective strategies employing coaching and effective implementation of use of PPE

3.Led a change in the company’s safety observation program that produced results leading to a preventive (rather than reactive) approach to safety.

4.Increased worksite safety and health awareness by holding series of workshops on workplace safety and employee wellbeing

2013 -2015 Ire Clay Products, Ado-Ekiti, Ekiti State

Position occupied: Safety Engineer

Task 1: Communicate and implement Health, Safety and Environment policies in the company

Task 2: Prepare company for internal audits

Task 3:Promoting good safety culture within the company

Task 4: Assist in developing and implementing field location emergency response

procedures and evacuation plans

Task 5: Review and analyzing accident and near misses incident and making

Corrective action

Achievements 1: Investigation of accidents and near misses

Achievements 2: Provision of safety trainings, coaching, guidance and mentoring

2009-2013: S Olokun Mechanical and Civil Works, Ibadan.

Position Occupied: Safety Engineer

Task 1: Facilitate safety, accident prevention and investigation training program

Task 2: Conducting investigations on workplace near-miss incidents and accidents and develop measures to prevent recurrences.

Task 3: Conducting internal Safety audits

2008-2009: Ministry of Works, Nasarawa State

Maintenance Engineer (Youth Corps)

Task 1:Repair of generating sets and maintenance of construction equipment

Projects Executed

Rehabilitation, Installation and commissioning of Clay Bricks producing machines

Installation and programming of water treatment plants with four carbon filter tanks with two buffer tanks to supply

Installation of pasteurization system

Installation of three simple syrup tanks with associate dissolving units

Butt fusion of HDPE pipes

Fabrication and installation of fire hydrant and water sprinkler system with in line rack sprinklers

Construction of 102m by 80m warehouse

Installation of fire hydrant pipes, water sprinkler pipes and CO2 suppression system

Installation and dismantling of Tower crane

Decommissioning of old LV panel and retrieval of cables

Calibration of AGO tanks

Installation of LED lights, control panel system, HV network, low voltage panel distribution board, cable installation and access control system, powering of control panel automation and programming of all the PLC cables

Installation of air grill, diffusion cassette unit, ALP air duct and exhaust fan

Installation of Diesel Generators 1400KVA (4pieces)

Racking and termination of cables

Installation of 7.5MVA transformer 33/11KVnstallation of 33KVA substation

Loading and unloading of 20feet containers (over 70 pieces)

1500square meter tiling of wall, floor and staircases

Installation 7unit of HV distribution change over panels

Design, building and installation of 4000, 2500, and 1600 amp by-pass distribution panel

Installation of 4MVA 11/0.415KV Transformer

Demolition of existing Crown and Sugar Store, fabrication and construction of temporary Sugar store

Installation of pipe bridge

Construction of Energy Center building (70m by 35m)

Construction of a storey Pet line building (110m by 40m)

Construction of access ramp/road (84m by 200m)

Construction of sump pit and septic tanks (8.6m by 3.1m)

Construction of retaining walls (192m)

Testing and curing of cubes

Installation of Liebherr batching plant with 0.5cubic meter capacity

Installation of production line machines: blow mode, cap feeding unit, filler, mixer, washer, hygienic center, labeler conveyor(container, pallet and spiral), perform units and palletizer

Installation of submersible pump and control panel

Installation of Rockwool Panels for Ceiling and Wall of CIP Room, AVR and LV Room

Construction of 1km perimeter fence

Installation of RGB Line 1 palletizer

Fabrication and installation of pipes for LPFO tank

Repositioning and calibration of AGO tanks

Washing, painting of roof and fixing of bird net inside RGB Line 3

Excavation and laying of 2km NBC water pipes from Asejire Dam to Production Plant

Construction of retaining walls for Green Field

Ingression and installation of boilers

Relocation of Evaporation condenser

Fabrication and installation of supply utility media pipes (steam condensate, syrup, hot water, process water, CIP, ambient water, glycol, cold water and air lines)

Construction of cold room

Installation of Hansa cooling units

Pet lines (110m by 40m) steel erection and roof and wall panel installation(rockwool)

Fabrication and building of water buffer tank

Installation of over 18 Perimeter lights

Installation of drainage system for production lines

Installation of 1200KVA sound attenuating generator

Fabrication and installation of false wall and ceiling panels

Installation of ingest S 6.6 thunder arrestor

Installation of earthing system

Erection of air handling unit(AHU) platform, handrail and CAT ladder

Laying and termination of cables from Asejire Dam to NBC Plant

Refurbishment of Transformer

Installation of New KVA 1400 Gen Sets

Passivation of water buffer tanks

Charging of tank with activated carbon and sand

Major Conferences/Workshops

Community empowerment Workshop (Living Faith, Apata, Ibadan, 2013)

Winner, Oceanic Bank Talent Hunt (Oceanic Bank, 2009)

Interest

Writing, Travelling, Sports, Public speaking and Quality family outings

Referees

Available upon request



Contact this candidate