ESHO SUNDAY TEMITAYO
E-mail Address: adcyp7@r.postjobfree.com
Mobile Nos: (234) 811-***-****, (234) 803-***-****,
Contact Address: Ajibose’s house, Apata, Ibadan, Oyo State, Nigeria.
Career Objectives: To eliminate fatality, prevent accident, reduce events and promote a good health and safety culture within my organization
Academic Information
2001-2008 Ladoke Akintola University of Technology, Ogbomoso, Oyo state
(B-tech) Mechanical Engineering (Second Class Division)
1994-2000 Osun State Unity School, Ikire, Osun State
Senior School Certificate Examination (SSCE)
1987-1994 Sacred Heart Private School, Ring Road
First School Leaving Certificate (FSLC)
Professional qualifications/competencies
NEBOSH International Diploma (00392611)
Certified to QMS 9001:2015 Lead Auditor Standard
Certified to OHSAS 18001 Lead Auditor Standard
NEBOSH IGC Certificate(00255213/644836)
Health, Safety and Environment Course (Level 3)
General Health, Safety and Environment Course (GHSE)
First Aid at Work Course (NIGERIAN RED CROSS SOCIETY)
International Well control IWCF(Level 1 Programme)
OSHA Standard based Hazard Communication (HAZCOM) course
Work At Height (CRESENT)
Mobile Ladder Safety (American Ladder Institute)
Single and Extension Ladder Safety (American Ladder Institute)
Step Ladder Safety (American Ladder Institute)
Articulated Ladder Safety (American Ladder Institute)
Member Institute of Safety Professional of Nigeria (ISPON):6334
Project Management Professional (PMP) in view (2019)
Basic Certificate in Entrepreneurship
Key Skills, Attributes and Professional Membership
Behavioral Safety
Proactive approach to H&S
Hazard Identification and risk control
Environmental awareness
Motivational, Communication and Supervisory Skills
Computer literate, Experienced in full reporting using software
Competent with the use of AutoCAD application
Work Experience
2015-till date Hybrid Consulting Limited, Ikeja Lagos
Position Occupied: HSE Supervisor to NBC (Nigeria Bottling Company) Construction and Installation Projects
Task 1: Liaise between client, contractors and others on all matters relating to health,
safety and environment to ensure consistent application and understanding of
policies and procedures
Task 2: Communicate and implement Health, Safety and Environment policies in the project sites
Task 3: Advise on OHS trend and indicators
Task 4: Develop programs and plans to achieve OHS objectives
Task 5: Provide direction, technical guidance on Health and Safety practices
Task 6: Conduct HSE audits as required, identify opportunities for continuous improvements while also providing cost effective solutions to ensure continuous improvements
Task 7: Prepare projects for annual third party audits
Task 8 Supporting and monitoring HSE improvement proposal stating the non conformance, proposed corrective action, required resources for corrective action and plan of implantation
Task 8: Developing, inspecting, monitoring and enforcing corporate safety and health policies and procedures
Task 10: Prepare weekly HSE reports to the project management ream
Task 11: Planning and conducting HSE meetings with contractors representative and
client
Task 12: Keep staff and managers abreast of changes in HSE Legislation and codes of
practice
Task 13: Follows up to ensure that corrective actions are implemented where necessary and ensures that any certification requirements are complied with audit work
being performed with ‘Safe Work Permit
Task 14: Assist with the implementation of Job Safety Analysis and inspect job site activities during particularly difficult or hazardous work situations
Task 15: Coordinate and participate in the investigation of accidents and near misses
whenever required
Task 16: Ensure participation in regular emergency response exercises and drills that are conducted to ensure the highest level of preparedness in any emergency
Task 17: Assist in developing and implementing field location emergency response
procedures and evacuation plans
Task 18: Investigate the root cause of HSE complaint put forward by staff members, customers, client and contractors
Achievements 1:
1.Led HSE team to achieve 1.9+ MILLION Man hours without LTI(2015-2917)
2.Reduced overall accident rate by 80% through implementation of effective strategies employing coaching and effective implementation of use of PPE
3.Led a change in the company’s safety observation program that produced results leading to a preventive (rather than reactive) approach to safety.
4.Increased worksite safety and health awareness by holding series of workshops on workplace safety and employee wellbeing
2013 -2015 Ire Clay Products, Ado-Ekiti, Ekiti State
Position occupied: Safety Engineer
Task 1: Communicate and implement Health, Safety and Environment policies in the company
Task 2: Prepare company for internal audits
Task 3:Promoting good safety culture within the company
Task 4: Assist in developing and implementing field location emergency response
procedures and evacuation plans
Task 5: Review and analyzing accident and near misses incident and making
Corrective action
Achievements 1: Investigation of accidents and near misses
Achievements 2: Provision of safety trainings, coaching, guidance and mentoring
2009-2013: S Olokun Mechanical and Civil Works, Ibadan.
Position Occupied: Safety Engineer
Task 1: Facilitate safety, accident prevention and investigation training program
Task 2: Conducting investigations on workplace near-miss incidents and accidents and develop measures to prevent recurrences.
Task 3: Conducting internal Safety audits
2008-2009: Ministry of Works, Nasarawa State
Maintenance Engineer (Youth Corps)
Task 1:Repair of generating sets and maintenance of construction equipment
Projects Executed
Rehabilitation, Installation and commissioning of Clay Bricks producing machines
Installation and programming of water treatment plants with four carbon filter tanks with two buffer tanks to supply
Installation of pasteurization system
Installation of three simple syrup tanks with associate dissolving units
Butt fusion of HDPE pipes
Fabrication and installation of fire hydrant and water sprinkler system with in line rack sprinklers
Construction of 102m by 80m warehouse
Installation of fire hydrant pipes, water sprinkler pipes and CO2 suppression system
Installation and dismantling of Tower crane
Decommissioning of old LV panel and retrieval of cables
Calibration of AGO tanks
Installation of LED lights, control panel system, HV network, low voltage panel distribution board, cable installation and access control system, powering of control panel automation and programming of all the PLC cables
Installation of air grill, diffusion cassette unit, ALP air duct and exhaust fan
Installation of Diesel Generators 1400KVA (4pieces)
Racking and termination of cables
Installation of 7.5MVA transformer 33/11KVnstallation of 33KVA substation
Loading and unloading of 20feet containers (over 70 pieces)
1500square meter tiling of wall, floor and staircases
Installation 7unit of HV distribution change over panels
Design, building and installation of 4000, 2500, and 1600 amp by-pass distribution panel
Installation of 4MVA 11/0.415KV Transformer
Demolition of existing Crown and Sugar Store, fabrication and construction of temporary Sugar store
Installation of pipe bridge
Construction of Energy Center building (70m by 35m)
Construction of a storey Pet line building (110m by 40m)
Construction of access ramp/road (84m by 200m)
Construction of sump pit and septic tanks (8.6m by 3.1m)
Construction of retaining walls (192m)
Testing and curing of cubes
Installation of Liebherr batching plant with 0.5cubic meter capacity
Installation of production line machines: blow mode, cap feeding unit, filler, mixer, washer, hygienic center, labeler conveyor(container, pallet and spiral), perform units and palletizer
Installation of submersible pump and control panel
Installation of Rockwool Panels for Ceiling and Wall of CIP Room, AVR and LV Room
Construction of 1km perimeter fence
Installation of RGB Line 1 palletizer
Fabrication and installation of pipes for LPFO tank
Repositioning and calibration of AGO tanks
Washing, painting of roof and fixing of bird net inside RGB Line 3
Excavation and laying of 2km NBC water pipes from Asejire Dam to Production Plant
Construction of retaining walls for Green Field
Ingression and installation of boilers
Relocation of Evaporation condenser
Fabrication and installation of supply utility media pipes (steam condensate, syrup, hot water, process water, CIP, ambient water, glycol, cold water and air lines)
Construction of cold room
Installation of Hansa cooling units
Pet lines (110m by 40m) steel erection and roof and wall panel installation(rockwool)
Fabrication and building of water buffer tank
Installation of over 18 Perimeter lights
Installation of drainage system for production lines
Installation of 1200KVA sound attenuating generator
Fabrication and installation of false wall and ceiling panels
Installation of ingest S 6.6 thunder arrestor
Installation of earthing system
Erection of air handling unit(AHU) platform, handrail and CAT ladder
Laying and termination of cables from Asejire Dam to NBC Plant
Refurbishment of Transformer
Installation of New KVA 1400 Gen Sets
Passivation of water buffer tanks
Charging of tank with activated carbon and sand
Major Conferences/Workshops
Community empowerment Workshop (Living Faith, Apata, Ibadan, 2013)
Winner, Oceanic Bank Talent Hunt (Oceanic Bank, 2009)
Interest
Writing, Travelling, Sports, Public speaking and Quality family outings
Referees
Available upon request