Address: **** *** ******* **
APT ***
Jacksonville
FL 32257-6086
Date & Place of Birth:
Lamis Youssef 16-Jan, 1989 - Homs, Syria
adcwjb@r.postjobfree.com
OBJECTIVE
Seeking a job as a CAD Technician .
EDUCATION
Feb 2016 - Present Passed the Fundamentals of Engineering Exam (FE) and current registrated as an Engineer in Training (EIT), and I obtained the EIT Certificate . Sep 2007 – Oct 2012 Regionally Accredited institution - Al-Baath University of Syria, Homs - Syria
Degree and Major: Bachelor in architecture engineering Sep 2006 - Ju1 2007 Al-Amal School, Homs - Syria
Degree and Major: Baccalaureate in General Sciences ACADEMIC COURSES
Design: Specialization in planning and exterior design of buildings
Planning of Cities: Specialization in the reorganization of residential areas
Executive of Plans: Specialization in determining the dimensions and axes of the projected columns and structural styles of buildings
Decoration: Specialization in interior design of buildings
Landscape: Specialization in the organization of the outside vacuum surrounding the buildings such as parks, footpaths, green spaces, pools, etc WORK EXPERIENCE
1-Area Wide Protective-July 02/2018-March 27/2020
Address : 4244 Mt Pleasant St NW, N Canton, OH 44720 Roles and Responsibilities:
Designing and Drawing Temporary Traffic Control plans for projects in different states carried out by the company using Rapid Plan program. Major Projects:
1 - Duke Carolinas:
-LAHC TD I-540 Crossing 250-morrisville, NC
-LAHCTD I-540 Crossing 67-morrisville, NC
-LAHCTD I-540 Crossing 88-Raleigh, NC
-LAHC US-378 Crossing # 153-Sumter, SC
-I-85 Crossing#100-Blacksburg, SC
-10329279 Berea Rd part 3 and 10329497 Berea Rd Reconducts-Greenville, SC
-28839410 Phase2-Neely Ferry Rd-Simpsonville SC
-LAHCTD I-40 Crossing 195 -Wallace, NC
-LAHCTD US-70 Crossing 231 -Clayton, NC
-LAHCTD US-70 Crossing 294 -Raleigh, NC
-LAHCTD I-440 Crossing 54 -Raleigh, NC
-LAHCTD I-540 Crossing 89-Raleigh, NC
-LAHCTD I-540 Crossing 88-Raleigh, NC
-White horse road &Page drive-Greenville, SC
-Duke-4807 South Blvd - Charlotte, NC
-LAHC I-40 Crossing 204 - Castle Hayne, NC
-White horse road &Page drive-Greenville, SC
-LAHC US-378 Crossing # 153
-LAHC I-40 Crossing 196-Willard, NC
-LAHC US-70 Crossing 294-Raleigh, NC
2- Arborguard:
-5669 Peachtree Dunwoody-Sandy Springs, GA
3- Duke Energy:
-SR 32 Line Crossing Batavia, OH
-Duke - Albemarle Road-Charlotte, NC
4- Advanced Materials LLC:
-Union Center Blvd Bridge Work - West Chester Twp, OH
-
5- MasTec:
-1801 CUWG.183-Multiple Location, Miami, FL
-8231408 W Las Olas Blvd -Fort Laudredale, FL
-8273915 Nova Dr- Davie, FL
-MasTec-MIA-Miamigardens-09-1801CVFB.388 NE 12th Ave-North Miami FL 6-KU & LGE:
-144039 Task# 4160881 I-75 Exit 95 - Line crossing-Richmond, KY 7- Black & Veatch:
-KY-9007- MP 28.7 Moargantown, KY
8- Ironsides Group LLC:
-US 23 Line Crossing near Witten Lane Wittensville, KY
-US 23 at KY 201 Line Crossing-Wittensville, KY
-US 23 Line Crossing near KY-1559 - Staffordsville, KY 9- Tri County Electric:
-US 231 Line Crossings Scottville, KY
-
10- Altice USA :
-Route 460 -Newport, VA
11- Volt Power:
-8108007-Gulfstream Rd - Dania, FL
-
12- Space Coast Super Boat LLC:
-Thunder om Cocoa Beach-A1A Cocoa Beach FL
13- FPL Davco Contractor work:
-Davco-6668702 Glades Road- Boca Raton FL
14- AEP:
-Hwy 20 & IN-23-South Bend, IN
15- Iveys Construction:
-Kennedy Space Center Visitor Complex-merritt, FL
16- Florida power and light:
-8664919 NW 11th St & NW 30th Ave-Miami, FL
-858****-**** E Dixie Hwy-Miami, FL
-6848320 - NE 42nd St.& NE 2nd Ave
-866****-**** W Flagler St.-Miami, FL
-8583506 NW 29th St.& NW 1st Ave
-8656038 From NW 12th St to NW 13th St and From NW 1st Ave to NW 1st Pl-Miami, FL
-862****-*** NE 61st St-Miami, FL
-874****-**** Stewart Ave-Miami, FL
-7238283 SW 22nd Ave & SW 1st Ave-Miami,FL
-
17- Accumark Inc:
-Down Town Norfolk -E Main St & Atlantic St - Nofolk, VA 18- ESS Engineering Inc :
-NW 7th St - Miami, FL
19- FPL-Pike Contractor Work:
-Purdy Lane Cap-Fdr-West Palm Beach, FL
-Terminal Cap Feeder Hdr 23rd Street-West Palm Beach, FL
-Hillsboro Feeder Hdr Bore-W Camino Real Road& Military Trail -Boca Raton, FL 20- Pike Electric:
-Square lake cap Feeder Hdr - 766378 Palm Beach Gardens FL
And I did more different projects in the years 2018 and 2020 too
Most of the Duke Carolinas Projects "Line Crossing" ones needed sealed and we worked with the PE Civil Engineers Like:
-Pat McCarty
-Albert Antonie
2-MA Consulting Group-Feb27/2012-Jun05/2013
Roles and Responsibilities:
Drawing Engineering plans for projects carried out by the company using AutoCad and 3D Max programs.
Auditing and comparing the engineering plans with sections and elevations to ensure the match between them.
Drawing perspective of various projects by using 3D Max program. Drawing old building permits (or licenses) by using AutoCad program. Major Projects:
Qatar Embassy in Beirut - Lebanon and Residential compound and villas in Lebanon. MAJOR ACADEMIC PROJECTS
2011-2012: Design of an Entertainment Center
To include: Permanent and a temporary showroom, multi-purpose hall, section for periodicals, department for children education, library, cafeteria, lounge, administration unit, main lobby, department for Computer Education, department for language teaching
Tools used: 2D AutoCad and 3D Max
2010 - 2011: Design of a Hospital
To include: Outpatient department, emergency department, radiology department, laboratory, operations department, main lobby, pharmacy, administration unit
Tools used: 2D AutoCad and 3D Max
2010-2011: Design of a Theatre
To include: Main lobby, cafeteria, administration unit, main showroom, the scenes, department for ticketing
Determined the dimensions of walls, doors, windows, columns axes and the used siding materials.
Tools used: 2D AutoCad
2010-2011: Design of a sports club
To include: Main lobby, sports section, department of physical therapy, department of the sauna, administration unit, lounge, main swimming pool, fitting room, cafeteria
Tools used: 2D AutoCad and 3D Max
2010-2011: Design of a Shopping Mall with Multiple Floor Parking
To include: Four floor parking, a supermarket in the ground floor, and a commercial section and shops in the 1st and 2nd floor
Tools used: 2D AutoCad and 3D Max
TRAININGS
2D AutoCad : 4 years Experience
3D Max : 2 years Experience
Adobe Photoshop : 4 years Experience
LANGUAGES
Fluent in Arabic; Good in English
AVAILABILIY
Available upon request